Project Submission No. | S00086 |
---|---|
Project Title | Wind Farm Kovacica |
Project Owner(s) (as per PSF & LOA) | 1. Electrawinds K-Wind d.o.o. 2. Energy Changes Projectentwicklung GmbH (focal point) |
Submission Date | 2021-12-23 |
Global Stakeholder Consultation Period |
2022-01-26 to 2022-02-09 |
Registration Date | 2023-07-20 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | Methodology for Grid Connected Renewable Energy Generation Projects (GCCM001 v2.0) |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Verified GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Verified E+ Label | Yes |
Forecasted S+ Label | Yes |
Verified S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() ![]() |
Verified SDG+ Goals |
![]() ![]() ![]() ![]() |
Forecasted SDG+ Label | Gold |
Verified SDG+ Label | Gold |
Forecasted Market Eligibility | C+ - Pilot Phase |
Verified Market Eligibility | C+ - Pilot Phase |
Country |
Serbia
|
---|---|
Focal Point of Project Owners
|
Energy Changes Projektentwicklung GmbH |
Email of Contact Person of FP (Primary) | wolfgang.wetzer@energy-changes.com |
Email of Contact Person of FP (Secondary) | manfred.stockmayer@energy-changes.com |
Project Verifier | Carbon Check (India) Private Limited |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
Request for Registration Form | Registration Form |
Project Brief | The project activity is the wind farm Kovacica, located in the South Banat District of the autonomous province of Vojvodina, Republic of Serbia. The purpose of the project activity is to supply the national grid with renewable electricity and thus replacing the fossil fuel-based grid electricity with generated zero emission electricity by the wind farm. The start of the project activity was 04/01/2019 with connection of the first wind turbine to the grid (first electricity generation). Final approval of the project by the Ministry of Energy and status as privileged power producer was granted on 18/06/2019.
|
---|
Report (Public) | Verification Report (public) |
---|---|
Verification report date | 2023-06-16 |
First Request for Registration Date | 2022-07-07 |
Opinion | CCIPL was contracted by Energy Changes Projektentwicklung GmbH for project verification of the project activity “Wind Farm Kovacica” in Republic of Serbia. The project verification was performed based on rules and requirements defined by GCC for the project activity. c. is not likely to cause any net-harm to the environment and/or society and complies with the environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental Nonet-harm Label (E+) and the Social Nonet- harm Label (S+); and |