PROJECT DETAILS

Project Submission No. S00086
Project Title Wind Farm Kovacica
Project Owner (as per PSF & LOA) 1. Electrawinds K-Wind d.o.o. 2. Energy Changes Projectentwicklung GmbH (focal point)
Submission Date 23 Dec 2021
Global Stakeholder Consultation Period 26 Jan 2022 - 9 Feb 2022
Registration Date 20 Jul 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version Methodology for Grid Connected Renewable Energy Generation Projects (GCCM001 v2.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 289,427 (tCO2e/Year)
Verified GHG Emission Reduction (tCO2e/Year) 289,427 (tCO2e/Year)
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Gold
Verified SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Verified Market Eligibility CORSIA(C+)
Country Serbia
Focal Point of Project Owners (FP)
Energy Changes Projektentwicklung GmbH
Email of Contact Person of FP (Primary) wolfgang.wetzer@energy-changes.com
Email of Contact Person of FP (Secondary) manfred.stockmayer@energy-changes.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Verifier carboncheck_cert
Project Brief

The project activity is the wind farm Kovacica, located in the South Banat District of the autonomous province of Vojvodina, Republic of Serbia. The purpose of the project activity is to supply the national grid with renewable electricity and thus replacing the fossil fuel-based grid electricity with generated zero emission electricity by the wind farm.

The start of the project activity was 04/01/2019 with connection of the first wind turbine to the grid (first electricity generation). Final approval of the project by the Ministry of Energy and status as privileged power producer was granted on 18/06/2019.

 

 

 

Additional Information
VERIFICATION OUTCOME
Opinion

CCIPL was contracted by Energy Changes Projektentwicklung GmbH for project verification of the project activity “Wind Farm Kovacica” in Republic of Serbia. The project verification was performed based on rules and requirements defined by GCC for the project activity.
The project activity is a wind power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring GCCM001 “Methodology for Grid Connected Renewable Energy Generation Projects”, Version 02.0 and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard, Project-Sustainability-Standard and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms.
The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 289,427 tCO2e/year over the 10 years crediting period starting from 04/01/2019.
CCIPL has informed the project owners of the project verification outcome through the draft project verification report and final project verification report. The final project verification report contains the information with regard to fulfilment of the requirements for project verification, as appropriate.
CCIPL applied the following verification process and methodology using a competent verification team;
• The desk review of documents and evidence submitted by the project owner in context of the reference GCC rules and guidelines issued,
• Undertaking/conducting site visit, interview, or interactions with the representative of the project owner
• Reporting audit findings with respect to clarifications and non-conformities and the closure of the findings, as appropriate
• Preparing a draft verification opinion based on the auditing findings and conclusions
• Technical review of the draft project verification opinion along with other documents as appropriate by an independent competent technical review team.
• Finalization of the project verification opinion (this report)
Carbon Check (India) Private Limited (CCIPL) has verified and hereby certifies that the GCC project activity “Wind Farm Kovacica” in Republic of Serbia
a. Has correctly described the Project Activity in the Project Submission Form including the applicability of the approved methodology GCCM001, version 02.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecas ted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively.
b. Is likely to generate GHG emission reductions amounting to the estimated 289,427 tCO2e as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity;

c. is not likely to cause any net-harm to the environment and/or society and complies with the environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental Nonet-harm Label (E+) and the Social Nonet- harm Label (S+); and
d. is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 4 SDGs, which is likely to achieve the Gold SDG certification label (SDG+)
e. is likely to contribute to CORSIA Eligible Emission Units and has CORSIA Label (C+) certification valid till 31 December 2020. A written attestation from the Host country on double counting is not required until 31 December 2020 and the project was found meeting the applicable requirements prescribed by ICAO.

Report (Public) Verification Report (public)
Verification report date 2023-06-16
First Request for Registration Date 2022-07-07