S00041 |
Karaçayır Wind Power Project |
Türkiye |
9 Dec 2021 - 23 Dec 2021 |
AMS-I.D Small-scale Methodology: Grid-connected renewable electricity generation from, ver 18.0 |
20497 |
Yes |
Yes |
6,7,11 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00064 |
Solar Power Project in Bikaner, Rajasthan by Avaada RJHN |
India |
10 Jan 2022 - 24 Jan 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
466,533 |
Yes |
Yes |
Goals 1, 3, 4, 5, 6, 7, 8, 13,15 |
Diamond |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00148 |
Masfen-13 Solar Power Plant Bundle |
Türkiye |
31 Mar 2022 - 14 Apr 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
12,679 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00484 |
26MW Pake Hydro Power Plant |
Viet Nam |
6 Oct 2022 - 20 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
76443 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00043 |
Kovancilar Bundled SPP |
Türkiye |
12 Dec 2021 - 26 Dec 2021 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
10,943 |
Yes |
Yes |
6, 7, 8, 11 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00851 |
30.24 MWp Phuoc Huu-Dien Iuc 1 solar Power Plant |
Viet Nam |
29 Jan 2023 - 12 Feb 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
38065 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00094 |
Zincirli Wind Power Plant |
Türkiye |
6 Feb 2022 - 20 Feb 2022 |
AMS.I-D (version 18.0) |
18,860 |
Yes |
Yes |
3,7,8,9 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00779 |
AMPSOLAR Power Systems Private Limited |
India |
3 Jan 2023 - 17 Jan 2023 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
42,987 |
Yes |
Yes |
SDG 7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00638 |
GES/United Renewable Energy 21.9 MW Solar Portfolio Located in Jebel Ali & Mina Rashid |
United Arab Emirates |
28 Nov 2022 - 12 Dec 2022 |
GCCM001 v3 |
12,648 |
Yes |
Yes |
SDG 7, SDG 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00885 |
160 MW Jetsar Solar PV Project |
India |
20 Feb 2023 - 6 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
333269 |
Yes |
Yes |
SDG1, SDG7, SDG8, SDG13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00117 |
Sprng Photovoltaic Private Limited |
India |
28 Feb 2022 - 14 Mar 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
100397 |
Yes |
Yes |
1, 3, 4, 5, 7, 8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00213 |
Solar Power Plant Bundle by Cengiz Enerji |
Türkiye |
12 May 2022 - 26 May 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
37.539 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00225 |
Makascı-8 Solar Power Plant Bundle |
Türkiye |
17 May 2022 - 31 May 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
14,741 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00359 |
Guangxi Lingchuan Lantian 50MW Wind Power Project |
China |
11 Sep 2022 - 25 Sep 2022 |
ACM0002 Version 20.0 |
78,551 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00007 |
Renewable Solar Power Project by Hero Future Energies |
India |
24 Jun 2021 - 8 Jul 2021 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 (Approved CDM methodology) |
861,030 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00302 |
Agah Solar Power Plant Bundle |
Türkiye |
11 Aug 2022 - 25 Aug 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
18.011 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00880 |
5 MW Solar Power Project by Udipta Energy |
India |
13 Feb 2023 - 27 Feb 2023 |
Grid connected renewable electricity generation, AMS-I.D (Version 18.0) |
6,421 tCO2 / year |
Yes |
Yes |
1,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00860 |
10 MW Solar Power Project in Telangana by SCCL |
India |
5 Feb 2023 - 19 Feb 2023 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
16057 |
Yes |
Yes |
3,4,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00067 |
50 MW Phong Dien II Solar Project |
Viet Nam |
10 Jan 2022 - 24 Jan 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
67,333 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00047 |
Wind Power Project by M/s Sterling Agro Industries Limited |
India |
15 Dec 2021 - 29 Dec 2021 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
23839 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00439 |
21 MW Wind power project by Vagarai Windfarm Limited |
India |
28 Sep 2022 - 12 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
43102 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00364 |
Household biodigesters - Eco Cooking |
India |
13 Sep 2022 - 27 Sep 2022 |
AMS I.E: Switch from non-renewable biomass for thermal applications by the user - Version 12.0 |
47588 |
Yes |
Yes |
SDG3, SDG7, SDG8, SDG15 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00033 |
Karaman Bundled Solar Power Plant |
Türkiye |
7 Dec 2021 - 21 Dec 2021 |
AMS-I.D.: Grid Connected Renewable Electricity Generation---Version 18.0 |
12,062 |
Yes |
Yes |
6,7,11 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00065 |
50 MW Tan Chau Solar Project |
Viet Nam |
10 Jan 2022 - 24 Jan 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
66,994 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00654 |
12.3 MW Bundled Wind Power Project in Gujarat & Madhya Pradesh |
India |
29 Nov 2022 - 13 Dec 2022 |
AMS-I.D.: - Grid connected renewable electricity generation - Version 18.0 |
22,362 |
Yes |
Yes |
1,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00070 |
30 MW Bach Khoa Solar Project |
Viet Nam |
11 Jan 2022 - 25 Jan 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
42682 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00120 |
Sprng Transform Sun Energy Private Limited |
India |
28 Feb 2022 - 14 Mar 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
181115 |
Yes |
Yes |
1, 3, 4, 5, 7, 8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00583 |
2*50MW Sorang Hydro-Electric Project, Himachal Pradesh, India |
India |
8 Nov 2022 - 22 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
424,718 |
Yes |
Yes |
1,3,4,7,8 & 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00666 |
30 MW (AC) GRID CONNECTED SOLAR PV PROJECT UNDER SECI BY BHAGERIA INDUSTRIES LIMITED |
India |
5 Dec 2022 - 19 Dec 2022 |
ACM0002, Version 20.0 |
53534 |
Yes |
Yes |
1,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00107 |
2 x 50 MW Solar Project in Medak, Telangana |
India |
17 Feb 2022 - 3 Mar 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
172,324 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00096 |
Sprng Renewable Energy Private Limited |
India |
6 Feb 2022 - 20 Feb 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
994031 |
Yes |
Yes |
1, 3, 4, 5, 6, 7, 8,15 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00680 |
Adares WPP Capacity Addition Project by YGT Elektrik Üretim Anonim Şirketi |
Türkiye |
6 Dec 2022 - 20 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 21.0 |
19,619 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00864 |
14.7 MW Wind power Project in Gujrat & MP by Oil India Limited |
India |
6 Feb 2023 - 20 Feb 2023 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
32,831 |
Yes |
Yes |
7,8 & 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00034 |
Selimiye Regulator and Hydro Power Plant |
Türkiye |
7 Dec 2021 - 21 Dec 2021 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
5171 |
Yes |
Yes |
SDG 7, SDG 8, SDG9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00441 |
Hydro Power Project in Andhra Pradesh, lndia |
India |
28 Sep 2022 - 12 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources, Version 20.0 |
206,419 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00210 |
Hangjinqi Balagong 20MW Solar Power Project |
China |
11 May 2022 - 25 May 2022 |
ACM0002 version20.0 |
25,478 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00485 |
Wind Energy Project in Kutch, Gujarat-2 |
India |
6 Oct 2022 - 20 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
379,355 |
Yes |
Yes |
3, 5, 7, 8, 9 & 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00498 |
16.5 MW Wind Power Project at Mahidpur, Madhya Pradesh by M/s Sanjay D Ghodawat |
India |
10 Oct 2022 - 24 Oct 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers & version 3.0 |
2,79,62 |
Yes |
Yes |
SDG 5,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00086 |
Wind Farm Kovacica |
Serbia |
26 Jan 2022 - 9 Feb 2022 |
Methodology for Grid Connected Renewable Energy Generation Projects (GCCM001 v2.0) |
261262 |
Yes |
Yes |
SDG#7, SDG#8, SDG#9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00119 |
Sprng Suryoday Energy Private Limited |
India |
28 Feb 2022 - 14 Mar 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
63800 |
Yes |
Yes |
1, 3, 4, 5, 7, 8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00866 |
90 MW Bundled Solar Project in Assam |
India |
6 Feb 2023 - 20 Feb 2023 |
AMS I.D Version 18 & ACM0002 , version 20.0 |
108734 |
Yes |
Yes |
5,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00066 |
Solar Power Project in Buldhana, Maharashtra by Avaada MHBuldhana |
India |
10 Jan 2022 - 24 Jan 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
89,620 tCO2e |
Yes |
Yes |
Goals 1, 3, 4, 5, 6, 7, 8, 13,15 |
Diamond |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00160 |
Bundled Wind Power Project by Sancak Enerji Hizmetleri A.S |
Türkiye |
7 Apr 2022 - 21 Apr 2022 |
ACM0002 V20 |
338633 |
Yes |
Yes |
SDG#7 , SDG#8 , SDG#9, SDG#5 , SDG#13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00712 |
Gio Thanh 1 Solar Power Plant |
Viet Nam |
12 Dec 2022 - 26 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
53241 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00325 |
Bundled Wind Energy Project in Basavanbagewadi, Karnataka, India |
India |
31 Aug 2022 - 14 Sep 2022 |
GCCM001: Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, version 3.0 |
50,211 |
Yes |
Yes |
7,8,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00110 |
50 MW Grid connected solar power project in Uttar Pradesh, India by SAEL |
India |
20 Feb 2022 - 6 Mar 2022 |
ACM0002, Version-20.0 |
75081 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00871 |
Beypi Biomass Power Plant |
Türkiye |
7 Feb 2023 - 21 Feb 2023 |
ACM0018: Electricity generation from biomass in power-only plants --- Version 6.0 |
75,766 |
Yes |
Yes |
SDGs 7, 8, 9, 12, 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00443 |
Tiryaki Solar Bundle |
Türkiye |
29 Sep 2022 - 13 Oct 2022 |
AMS-I.D.: Grid connected renewable electricity generation - v18.0 |
17,449 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00587 |
Solar Power Project in Kovilangulam by Ahil Green |
India |
10 Nov 2022 - 24 Nov 2022 |
GCCM001: Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, version 3.0 |
10,983 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00624 |
Ventos de São Fernando wind power projects in Brazil |
Brazil |
23 Nov 2022 - 7 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
251,225 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00138 |
MASFEN-4 Solar Bundle |
Türkiye |
27 Mar 2022 - 10 Apr 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
17017 |
Yes |
Yes |
7, 8, 9,13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00170 |
USPP Solar Power Project By Fourth Partner Energy Private Limited |
India |
13 Apr 2022 - 27 Apr 2022 |
GCCM001 V3.0 - 2022 |
23146 |
Yes |
Yes |
SDG 7, SDG 8, SDG 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00172 |
Güce Hydro Power Plant |
Türkiye |
13 Apr 2022 - 27 Apr 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
25,415 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00092 |
Bergama Bundled SPP |
Türkiye |
1 Feb 2022 - 15 Feb 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
15,451 |
Yes |
Yes |
6, 7, 11 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00071 |
Bergama Wind Power Plant |
Türkiye |
12 Jan 2022 - 26 Jan 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
54,666 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00298 |
Jinshui River Stage 4 Hydropower Plant |
China |
10 Aug 2022 - 24 Aug 2022 |
Large-scale Consolidated Methodology for Grid-connected electricity generation from renewable sources (ACM0002 v20.0) |
78,268 |
Yes |
Yes |
#7,#8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00713 |
Guaimbe Solar Power Projects by AES |
Brazil |
12 Dec 2022 - 26 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
93,102 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00613 |
Biomass thermal project in India (003) |
India |
20 Nov 2022 - 4 Dec 2022 |
AMS.I.C. Thermal energy production with or without electricity - Version 22 |
35,012 |
Yes |
Yes |
5,7,8,9,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00140 |
MASFEN-5 Solar Bundle |
Türkiye |
27 Mar 2022 - 10 Apr 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
13904 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00026 |
Ningxia Weigang PV Power Project |
China |
12 Nov 2021 - 26 Nov 2021 |
GCCM001 “Methodology for Grid Connected Renewable Energy Generation Projects’,Version 2.0 |
242923 |
Yes |
Yes |
7,8,9, 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00289 |
Solar rooftop Projects 3 by fourth partner |
India |
4 Aug 2022 - 18 Aug 2022 |
AMS-I.F. “Renewable electricity generation for captive use and mini-grid” (Version 4.0) |
11,199 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00701 |
Honaz Biomass Power Project |
Türkiye |
11 Dec 2022 - 25 Dec 2022 |
ACM0010 Version 8.0 |
170014 |
Yes |
Yes |
SDG 4, SDG 5, SDG 7, SDG 9, SDG 12 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00276 |
Anemus Wind Power Complex Project |
Brazil |
31 Jul 2022 - 14 Aug 2022 |
Large Scale Consolidated Methodology ACM0002: Grid-connected electricity generation from renewable sources, version 20.0. |
306,458 |
No |
No |
Not applicable |
N/A |
N/A |
RFR CC INCOMPLETE |
S00850 |
Babilônia Sul Wind Complex Project |
Brazil |
26 Jan 2023 - 9 Feb 2023 |
ACM0002 – Grid-connected electricity generation from renewable sources V20.0 |
834,573 |
Yes |
Yes |
1,7,8,9,10,11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00061 |
Sarahnlom Wind Farm project |
Thailand |
9 Jan 2022 - 23 Jan 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
115,106 |
Yes |
Yes |
SDG 7,8,9 and 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00054 |
Karlıtepe Wind Power Project |
Türkiye |
27 Dec 2021 - 10 Jan 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
67,759 |
Yes |
Yes |
7,8,9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00190 |
Şavşat Regulator and Hydroelectric Power Plant |
Türkiye |
21 Apr 2022 - 5 May 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
27,965 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00189 |
Ülkün-1 HPP |
Türkiye |
21 Apr 2022 - 5 May 2022 |
CDM Approved AMS-I.D. Grid-connected renewable electricity generation, version 18.0 |
11737 |
Yes |
Yes |
7, 8, 9, 11 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00820 |
Solar Power Project in Andhra Pradesh, India |
India |
15 Jan 2023 - 29 Jan 2023 |
ACM0002 Methodology for Grid-connected electricity generation from renewable sources, version 20.0 |
740,428 |
Yes |
Yes |
SDG 07, SDG 08 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00725 |
30MW Bundled Solar Power Plant |
India |
14 Dec 2022 - 28 Dec 2022 |
ACM0002 Version 20.0 |
44,724 (TCO2/Year) |
Yes |
Yes |
Goals 7,8,9,11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00055 |
Melden Solar Power Project Bundle |
Türkiye |
27 Dec 2021 - 10 Jan 2022 |
CDM approved consolidated Methodology ACM0002 (Version 20.0) |
77,529 |
Yes |
Yes |
SDG 7, SDG 8, SDG14, SDG11, SDG13 |
Diamond |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00892 |
85 MW Bilhaur Solar PV Project |
India |
20 Feb 2023 - 6 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
182065 |
Yes |
Yes |
SDG7, SDG8, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00367 |
Jinchang Xipo 100MW solar power project |
China |
14 Sep 2022 - 28 Sep 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
122,282 |
Yes |
Yes |
SDG 7, 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00040 |
Hamidiye Bundled Solar Power Plant |
Türkiye |
8 Dec 2021 - 22 Dec 2021 |
AMS-I.D.: Grid Connected Renewable Electricity Generation---Version 18.0 |
12,464 |
Yes |
Yes |
6,7,11 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00142 |
Biogas project from cattle waste/ agricultural feed stock |
India |
27 Mar 2022 - 10 Apr 2022 |
AMS III.D version 21.0, AMS I.F version 03.0 |
3,303 tCO2e |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00404 |
NamKhan 3 |
Lao People's Democratic Republic |
25 Sep 2022 - 9 Oct 2022 |
ACM0002.: Grid-connected electricity generation from renewable sources, Version 20.0 |
138,180 tCO2e |
Yes |
Yes |
SDG 7, 8, 9, 11 and 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00901 |
Kalfaköy Wind Power Plant |
Türkiye |
22 Feb 2023 - 8 Mar 2023 |
AMS-I.D.: Grid Connected Renewable Electricity Generation --- Version 18.0 |
25,539 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00016 |
Shenzhen Luohu Xiaping LFG Power Generation Project |
China |
17 Aug 2021 - 31 Aug 2021 |
ACM0001 v19.0 |
366,380 |
Yes |
Yes |
#7, #8, #9, #13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00020 |
CTGR Dunhuang 60MW Solar Power Generation Project |
China |
21 Oct 2021 - 4 Nov 2021 |
GCCM001 v2.0 |
66,437 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00499 |
Qianzhong Pingzhai Hydro Power Project |
China |
10 Oct 2022 - 24 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources (Version 20.0) |
160309 |
Yes |
Yes |
7 . 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00091 |
Sprng Agnitra Private Limited |
India |
31 Jan 2022 - 14 Feb 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
585,232 |
Yes |
Yes |
1, 3, 4, 5, 6, 7, 8,15 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00164 |
Wind Power Project in Jamshoro, Sindh by Master Green |
Pakistan |
11 Apr 2022 - 25 Apr 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
96,895 tCO2e |
Yes |
Yes |
Goals 3, 4, 6, 7, 8, 13 |
Diamond |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00074 |
Gümüşören Dam and Hydro Power Plant |
Türkiye |
16 Jan 2022 - 30 Jan 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
6,430 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00038 |
Konakpınar Wind Power Project |
Türkiye |
8 Dec 2021 - 22 Dec 2021 |
AMS-I.D Small-scale Methodology: Grid-connected renewable electricity generation from, ver 18.0 |
29389 |
Yes |
Yes |
6,7,11 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00296 |
Renewable Solar Power Project by Tata Power in Karnataka, Maharashtra & Rajasthan |
India |
9 Aug 2022 - 23 Aug 2022 |
ACM0002 (Version 20.0) |
1,083,155 |
Yes |
Yes |
1, 5, 7, 8, 13 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00042 |
Ulubey Bundled SPP |
Türkiye |
12 Dec 2021 - 26 Dec 2021 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
15,812 |
Yes |
Yes |
6, 7, 8, 11 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00283 |
10 MW Solar Power Project by Waaree PV Technologies Pvt. Ltd at Puducherry, India |
India |
1 Aug 2022 - 15 Aug 2022 |
Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (GCCM001 V3.0) |
16319 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00049 |
125.5 MW bundled wind power project by Atria Power in India |
India |
15 Dec 2021 - 29 Dec 2021 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
320,688 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00019 |
Wind Power Project by M/s Sun Photo Voltaic Energy India Private Limited |
India |
15 Oct 2021 - 29 Oct 2021 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
146,876 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00518 |
Bundled Solar Power Project in Palestine - 01 |
Palestine, State of |
17 Oct 2022 - 31 Oct 2022 |
Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (GCCM001 V3.0 – 2022) |
14,889 |
Yes |
Yes |
5,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00177 |
Ozan Roof SPP |
Türkiye |
17 Apr 2022 - 1 May 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
3143 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00561 |
Fuqing Phase II MSW Incineration Project |
China |
31 Oct 2022 - 14 Nov 2022 |
ACM0022 Version03.0 |
48,896 |
Yes |
Yes |
#7,#8,#9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00084 |
Girlevik-3 Karatuş Hydro Power Plant, Turkey |
Türkiye |
23 Jan 2022 - 6 Feb 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
8,623 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00139 |
MASFEN-2 Solar Bundle |
Türkiye |
27 Mar 2022 - 10 Apr 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
14653 |
Yes |
Yes |
7, 8, 9,13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00895 |
Binh An Solar Power Project |
Viet Nam |
20 Feb 2023 - 6 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 21.0 |
59,421 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00766 |
AAC Block project in Ahmednagar, Maharashtra |
India |
28 Dec 2022 - 11 Jan 2023 |
AMS-III.Z. “Fuel Switch, process improvement and energy efficiency in brick manufacture -Version 6.0 |
45201 |
Yes |
Yes |
SDG8, SDG9, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00039 |
Akyurt Wind Power Project |
Türkiye |
8 Dec 2021 - 22 Dec 2021 |
AMS-I.D Small-scale Methodology: Grid-connected renewable electricity generation from, ver 18.0 |
28985 |
Yes |
Yes |
6,7,11 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00511 |
Bundled Rooftop Solar Project in India-FPEL-01 |
India |
16 Oct 2022 - 30 Oct 2022 |
AMS I.D- Grid Connected Renewable electricity Generation-Version 18.0 |
49402 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00512 |
Bundled Rooftop Solar Project in India-FPEL-02 |
India |
16 Oct 2022 - 30 Oct 2022 |
AMS I.F- Grid Connected Renewable electricity Generation-Version 04.0 |
19501 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00099 |
Sprng Alt Energy Private Limited |
India |
13 Feb 2022 - 27 Feb 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
610,761 |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00126 |
Besaksakal Bundled SPP |
Türkiye |
7 Mar 2022 - 21 Mar 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
16,194 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00136 |
36 MW (2X18 MW) bundled Biomass Project by SAEL Limited in Punjab, India |
India |
24 Mar 2022 - 7 Apr 2022 |
ACM0018, Version - 5.0 |
209,400 |
Yes |
Yes |
1,3,7,8,11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00733 |
CoreCarbon Renewable Energy Project by Ramoji Group |
India |
14 Dec 2022 - 28 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
66,513 |
Yes |
Yes |
SDG # 5,SDG # 7,SDG # 8,SDG # 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00101 |
Aslandağı Beyyurdu Hydro Power Plant |
Türkiye |
15 Feb 2022 - 1 Mar 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
58,718 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
GCC ASSESMENT |
S00825 |
Echo 5 Wind Complex |
Brazil |
17 Jan 2023 - 31 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
101,244 |
Yes |
Yes |
7, 8, 9 and 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00447 |
Odunpazari SPP |
Türkiye |
29 Sep 2022 - 13 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
18,681 |
Yes |
Yes |
6, 7, 8, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00513 |
99.216 MWp Bundled Solar Power Plant in Vietnam |
Viet Nam |
16 Oct 2022 - 30 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
127617 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00444 |
Nam Chiane |
Lao People's Democratic Republic |
29 Sep 2022 - 13 Oct 2022 |
ACM0002.: Grid-connected electricity generation from renewable sources, Version 20.0 |
250,769 tCO2e |
Yes |
Yes |
SDG 7, 8, 9, 11 and 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00684 |
Wind-Solar hybrid Project by ReNew Power in Jamnagar, Gujarat, India |
India |
6 Dec 2022 - 20 Dec 2022 |
ACM0002,Version 20.0 |
59,627 |
Yes |
Yes |
1, 5, 7, 8, 9,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00005(GSC Redone) |
NFE Jamalco CHP Plant |
Jamaica |
2 Feb 2021 - 16 Feb 2021 |
AM0107 - New natural gas based cogeneration plant. Version 04 methodologies from UNFCCC |
357,871 |
Yes |
Yes |
7,8,9, 11 |
Platinum |
N/A |
VERIFICATION |
S00876 |
Renewable energy project in Karnataka by Bhoruka Power Corporation Limited |
India |
9 Feb 2023 - 23 Feb 2023 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 21.0 |
139,043 tCO2e |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00166 |
Solar Project by Hindupur Solar Park Private Limited |
India |
12 Apr 2022 - 26 Apr 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
73,304 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00657 |
225 MW Solar Energy Project in Noorsar |
India |
30 Nov 2022 - 14 Dec 2022 |
ACM0002,Version 20 |
503,873 |
Yes |
Yes |
Goal5,Goal 7,Goal 8,Goal 9,Goal 3 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00371 |
44 MW Wind Power Project |
India |
14 Sep 2022 - 28 Sep 2022 |
ACM0002- Grid-connected electricity generation from renewable sources, Version -20 |
115,127 |
Yes |
Yes |
SDG 13,SDG 9,SDG 8,SDG 7,SDG 5 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00375 |
Da Bac Solar Power |
Viet Nam |
14 Sep 2022 - 28 Sep 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
77,848 tCO2/year |
Yes |
Yes |
SDG 1,5,7,8,9,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00506 |
30 MWp Solar Power Project in Dhule |
India |
13 Oct 2022 - 27 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
46212 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00351 |
Bayraktar Solar Power Plant Bundle |
Türkiye |
11 Sep 2022 - 25 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
13,520 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00112 |
Solar Power Project by Virescent Renewable Energy Trust |
India |
23 Feb 2022 - 9 Mar 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
162,336 tCO2e |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00326 |
50 MW Solar Power Project in Kasargod, Kerala |
India |
31 Aug 2022 - 14 Sep 2022 |
GCCM001 - Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, version 3.0 |
71,541 |
Yes |
Yes |
1,7,8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00858 |
9 MW Solar Power Project in Rajasthan by Oil India Limited |
India |
31 Jan 2023 - 14 Feb 2023 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
15,119 |
Yes |
Yes |
7,8 & 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00195 |
Makascı-2 Solar Power Plant Bundle |
Türkiye |
24 Apr 2022 - 8 May 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
16,514 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00924 |
Solar Power Project activity in Tamil Nadu |
India |
22 Mar 2023 - 5 Apr 2023 |
ACM0002 (Version 21.0) |
94,329 |
Yes |
Yes |
1,3,4,7,8,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00004(GSC Redone) |
Renewable solar photovoltaic project by ACME group |
India |
1 Feb 2021 - 15 Feb 2021 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
2,318,539 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00594 |
Burdur Landfill Gas to Electricity Project |
Türkiye |
14 Nov 2022 - 28 Nov 2022 |
AMS-III.G Version 10 & AMS-I.D Version 18 |
46,693 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00450 |
Bom Jesus da Lapa |
Brazil |
2 Oct 2022 - 16 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
50519 |
Yes |
Yes |
5, 7, 8, 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00711 |
Wind Power Projects by AES |
Brazil |
12 Dec 2022 - 26 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
155,615 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00781 |
Sinenergy Solar Power Project |
Viet Nam |
4 Jan 2023 - 18 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 21.0 |
56,745 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00129 |
Kovanlık Reg. ve HES |
Türkiye |
10 Mar 2022 - 24 Mar 2022 |
ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 20 |
87,947 tCO2eq |
Yes |
Yes |
7, 8, 9, and 13 |
Gold |
CORSIA(C+) |
GCC ASSESMENT |
S00052 |
55.3 MW bundled wind power project by Atria Power in India |
India |
21 Dec 2021 - 4 Jan 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
137,127 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00118 |
Sprng Solren Private Limited |
India |
28 Feb 2022 - 14 Mar 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
18097 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00833 |
Bundled 4 Solar power project in India |
India |
19 Jan 2023 - 2 Feb 2023 |
AMS-I.F.: Renewable energy generation for captive use and mini-gird, version 5.0 |
14,340 |
Yes |
Yes |
1,7,8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00163 |
Solar Power project in Maharashtra |
India |
10 Apr 2022 - 24 Apr 2022 |
GCCM001 (Version 3.0) and ACM0002 (Version 20.0) |
195,088 |
Yes |
Yes |
1, 3, 4, 7, 8,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00810 |
Solar Power Project in Andhra Pradesh - 01 |
India |
10 Jan 2023 - 24 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
74505 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00009 (GSC REDONE) |
Renewable Solar Power Project by Rays Power Infra Private Limited (GSC REDONE) |
India |
15 Jul 2021 - 29 Jul 2021 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 (Approved CDM methodology) |
266,094 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00219 |
Renewable Energy Project by Solairepro Urja Private Limited |
India |
15 May 2022 - 29 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
378,469 |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00029 |
Dezhou Runjin Xiajin 100MW Wind Farm |
China |
18 Nov 2021 - 2 Dec 2021 |
GCCM001 “Methodology for Grid Connected Renewable Energy Generation Projects’,Version 2.0 |
175,038 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
REQUEST FOR REGISTRATION |
S00788 |
Bundled Wind Power Project in Gujarat, India |
India |
5 Jan 2023 - 19 Jan 2023 |
AMS-I.D.: - Grid connected renewable electricity generation - Version 18.0 |
29,356 |
Yes |
Yes |
5,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00013(GSC Redone) |
Renewable Solar Power Project by Green Urja Private Limited |
India |
15 Jul 2021 - 29 Jul 2021 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 (Approved CDM methodology) |
50,911 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00014(GSC Redone) |
Renewable Solar Power Project by Avon Cycles Limited |
India |
15 Jul 2021 - 29 Jul 2021 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 (Approved CDM methodology) |
32994 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00169 |
Solar Project by Vector Green Prayagraj Solar Private Limited |
India |
12 Apr 2022 - 26 Apr 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
92,175 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00396 |
Cogen & Thermal/Electrical Energy Savings Project |
United Arab Emirates |
22 Sep 2022 - 6 Oct 2022 |
ACM0012: Waste energy recovery --- Version 6.0 |
33,272 |
No |
No |
7, 8, 9, 11 |
N/A |
N/A |
VERIFICATION |
S00036 |
285 MW Coral Project in Gujarat |
India |
7 Dec 2021 - 21 Dec 2021 |
GCCM001 Version 3.0 |
861351 |
Yes |
Yes |
SDG 7, SDG 8 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00203 |
Makascı-3 Solar Power Plant Bundle |
Türkiye |
26 Apr 2022 - 10 May 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
15,514 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00879 |
129 MW Solar Power Project by SCCL in Telangana |
India |
12 Feb 2023 - 26 Feb 2023 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
199,892 |
Yes |
Yes |
7,8 & 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00216 |
Renewable Energy Project by Solaire Surya Urja Private Limited |
India |
12 May 2022 - 26 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
221,520 |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00341 |
Solar Project by Avengers Solar Private Limited |
India |
8 Sep 2022 - 22 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
20,051 |
Yes |
Yes |
3,4,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00322 |
Phan Lam 2 Solar Power Project |
Viet Nam |
24 Aug 2022 - 7 Sep 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0 |
66837 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00516 |
ARAPGIR WPP |
Türkiye |
16 Oct 2022 - 30 Oct 2022 |
CDM Approved AMS-I.D. Grid-connected renewable electricity generation, version 18.0 |
17501 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00193 |
Solar Project by Yarrow Infrastructure Private Limited, Bhadla |
India |
24 Apr 2022 - 8 May 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
145,298 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00196 |
15MW Paddy Straw Based Biomass Project by SAEL Limited in Kaithal, Haryana, India |
India |
24 Apr 2022 - 8 May 2022 |
AMS I.D, Version 18 |
82444 |
Yes |
Yes |
1,3,5,7 and 8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00804 |
BİLGİ SOLAR POWER PLANT BUNDLE PROJECT |
Türkiye |
8 Jan 2023 - 22 Jan 2023 |
AMS-I.D Small-scale Methodology: Grid connected renewable electricity generation Version 18.0 |
16,577 |
Yes |
Yes |
7,8,9, |
Gold |
CORSIA(C+) |
VERIFICATION |
S00149 |
Masfen-12 Solar Power Plant Bundle |
Türkiye |
31 Mar 2022 - 14 Apr 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
14,857 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG11, SDG13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00175 |
Renewable wind power project in India -1- 011 |
India |
14 Apr 2022 - 28 Apr 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
476,192 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00627 |
9.5 MW Bundled Solar Power Project in Tamilnadu & Himachal Pradesh |
India |
23 Nov 2022 - 7 Dec 2022 |
AMS-I.D.: - Grid connected renewable electricity generation - Version 18.0 |
15,487 |
Yes |
Yes |
1,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00127 |
ÇATALTEPE WPP |
Türkiye |
9 Mar 2022 - 23 Mar 2022 |
CDM Approved AMS-I.D. Grid-connected renewable electricity generation, version 18.0 |
24,538 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00454 |
Solar Power Project in Philippines |
Philippines |
2 Oct 2022 - 16 Oct 2022 |
GCCM001: Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers ; Version 3.0 |
99,035 tCO2e |
Yes |
Yes |
SDG 7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00199 |
Solar Power Project by AKSU Enerji |
Türkiye |
24 Apr 2022 - 8 May 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
15,301 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
GCC ASSESMENT |
S00028 |
Dezhou Runjin Xiajin Phase II 100MW Wind Power |
China |
18 Nov 2021 - 2 Dec 2021 |
GCCM001 “Methodology for Grid Connected Renewable Energy Generation Projects’,Version 2.0 |
178,337 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00113 |
Renewable solar power project in India -2- 002 |
India |
23 Feb 2022 - 9 Mar 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
578,725 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
GCC ASSESMENT |
S00756 |
12 MW bundled Solar Power Project in Karnataka and Uttarakhand, India |
India |
22 Dec 2022 - 5 Jan 2023 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
18,419 |
Yes |
Yes |
1,5,7,8,9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00796 |
Solar Power project in Karnataka |
India |
5 Jan 2023 - 19 Jan 2023 |
ACM0002 (Version 21.0) |
97,426 |
Yes |
Yes |
1, 3, 4, 7, 8, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00917 |
Solar Powered Irrigation Services by Claro Energy- Project 1 |
India |
9 Mar 2023 - 23 Mar 2023 |
AMS-I.B Mechanical energy for the user with or without electrical energy version 12.0. |
4738 |
Yes |
Yes |
1,7,8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00205 |
Inner Mongolia Jianli Zhaosheng Wulatezhongqi 40MW Solar Power Project |
China |
28 Apr 2022 - 12 May 2022 |
ACM0002 version20.0 |
51,763 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00291 |
Renewable solar power project in India -2- 005 |
India |
7 Aug 2022 - 21 Aug 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
1,275,161 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00919 |
Solar Powered Irrigation Services by Claro Energy - Project 3 |
India |
9 Mar 2023 - 23 Mar 2023 |
AMS-I.B Mechanical energy for the user with or without electrical energy version 12.0. |
7211 |
Yes |
Yes |
1,7,8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00355 |
Antai 1*40MW Waste Heat Utilization for Power Generation Project |
China |
11 Sep 2022 - 25 Sep 2022 |
ACM0012 Version 06.0 |
190,675 |
Yes |
Yes |
#8, #9, #13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00035 |
Armutlu Bundled Solar Power Plant |
Türkiye |
7 Dec 2021 - 21 Dec 2021 |
AMS-I.D.: Grid Connected Renewable Electricity Generation---Version 18.0 |
18, 435 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
GCC ASSESMENT |
S00132 |
Alpuka SPP |
Türkiye |
20 Mar 2022 - 3 Apr 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
8,780 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
GCC ASSESMENT |
S00905 |
Biomass based thermal energy plant by BBMFIDPL |
India |
28 Feb 2023 - 14 Mar 2023 |
AMS I C- Thermal Energy generation with or without electricity |
59,020 |
Yes |
Yes |
SDG 8,SDG 7,SDG 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00549 |
Upper Marsyangdi A Hydropower Project |
Nepal |
26 Oct 2022 - 9 Nov 2022 |
CDM methodology ACM0002 “Grid-connected electricity generation from renewable sources” version 20.0 |
132542 |
Yes |
Yes |
7,8,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00563 |
Uğur 2 Bundle SPP |
Türkiye |
31 Oct 2022 - 14 Nov 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
10,156 |
Yes |
Yes |
7,8,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00501 |
Emission Reduction Due to Production of Aluminium Alloys through Recycling and Transfer in Liquid Form. |
India |
11 Oct 2022 - 25 Oct 2022 |
AMS III BD – Version 01.0 |
14119 |
Yes |
Yes |
1,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00591 |
90 MW Morrinhos Wind Power Project in Brazil by CGN |
Brazil |
14 Nov 2022 - 28 Nov 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
148,656 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00379 |
Xinghai County Gaqu Hydropower Station Project |
China |
14 Sep 2022 - 28 Sep 2022 |
ACM0002 version20.0 |
225,331 |
Yes |
Yes |
#7, #8,#9,#13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00303 |
Solar rooftop Projects by fourth partner 13.87 MW |
India |
11 Aug 2022 - 25 Aug 2022 |
AMS-I.F. - Renewable electricity generation for captive use and mini-grid (version 04.0) |
17929 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00214 |
Alxa League Jilantai 30MW Solar Power Project |
China |
12 May 2022 - 26 May 2022 |
ACM0002 version20.0 |
39,340 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00245 |
Renewable wind power project in India -1- 001 |
India |
2 Jun 2022 - 16 Jun 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
240,459 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00497 |
20 MW Solar Power Project by M/s Sun Pharmaceutical Industries Limited |
India |
10 Oct 2022 - 24 Oct 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers & version 3.0 |
29,941 |
Yes |
Yes |
5,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00440 |
Adanus Landfill Gas to Electricity Project |
Türkiye |
28 Sep 2022 - 12 Oct 2022 |
ACM0001: Flaring or use of landfill gas - Version 19.0; ACM0022: Alternative waste treatment processes - Version 3.0 |
108,041 |
Yes |
Yes |
7,8,9,11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00559 |
252 MW Wind Project in TN |
India |
30 Oct 2022 - 13 Nov 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
738,644 |
Yes |
Yes |
SDG 7, SDG 8, SDG 13. |
Silver |
CORSIA(C+) |
REQUEST FOR REGISTRATION |
S00241 |
Hong Phong 1 Wind Power Plant |
Viet Nam |
29 May 2022 - 12 Jun 2022 |
ACM0002: Grid-connected electricity generation from renewable sources (Version 20.0) |
106,060 tCO2/year |
Yes |
Yes |
1, 7, 8 & 13 |
Gold |
CORSIA(C+) |
REQUEST FOR REGISTRATION |
S00567 |
Premier Photovoltaic bundled Solar PV Power projects at Telangana, India |
India |
31 Oct 2022 - 14 Nov 2022 |
GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022) |
54,503 |
Yes |
Yes |
1,3,4,7,8 and 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00051 |
Esme Bundled SPP |
Türkiye |
21 Dec 2021 - 4 Jan 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
14,259 |
Yes |
Yes |
6, 7, 8, 11 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00090 |
BIOD Technology FZE project in Dubai |
United Arab Emirates |
31 Jan 2022 - 14 Feb 2022 |
ACM0017 Version 03.1 |
57249 |
Yes |
Yes |
SDG 1, SDG 5, SDG 7, SDG 8, SDG 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00526 |
Kaposvár West PVPP |
Hungary |
19 Oct 2022 - 2 Nov 2022 |
Version 2.0 of GCCM001 “Methodology for Grid Connected Renewable Energy Generation Projects |
19692 |
Yes |
Yes |
7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00798 |
10 MW Solar Project_SNWI |
India |
5 Jan 2023 - 19 Jan 2023 |
AMS I.D. version 18.0 |
14,995 TCO2/Year |
Yes |
Yes |
Goal-7, Goal-8, Goal-9, Goal-11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00198 |
Wind Power Project in Thatta, Sindh by Liberty Wind Power 2 Limited |
Pakistan |
24 Apr 2022 - 8 May 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
95,686 tCO2e |
Yes |
Yes |
Goals 3, 4, 6, 7, 8,13 |
Diamond |
CORSIA(C+) |
GCC ASSESMENT |
S00229 |
Makascı-6 Solar Power Plant Bundle |
Türkiye |
18 May 2022 - 1 Jun 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
14,992 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00502 |
Sol do Sertão Renewable Energy Project |
Brazil |
11 Oct 2022 - 25 Oct 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources V20.0 |
414,418 |
Yes |
Yes |
1, 7, 8, 9 10 and 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00597 |
Cikandang Mini Hydroelectric 3x2 MW - West Java Indonesia |
Indonesia |
15 Nov 2022 - 29 Nov 2022 |
AMS-I.D. Version 18.0 |
27,205 tCOe2 |
Yes |
Yes |
SDG 7, 8, 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00056 |
Renewable solar power project in India -2- 001 |
India |
30 Dec 2021 - 13 Jan 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 21.0 |
291,815 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00813 |
Kochi Metro India |
India |
10 Jan 2023 - 24 Jan 2023 |
ACM0016 V5.0 - Mass rapid transit projects |
155,574 |
Yes |
Yes |
1,3,4,5,7,8, 9, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00431 |
Uludağ Landfill Gas to Electricity Project |
Türkiye |
27 Sep 2022 - 11 Oct 2022 |
ACM0001: Flaring or use of landfill gas - Version 19.0 |
94,357 |
Yes |
Yes |
7,8,9,11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00835 |
10 MW Solar Power Project by Made Easy Education Pvt. Ltd. |
India |
19 Jan 2023 - 2 Feb 2023 |
AMS-I.D., Version 18.0 |
16,644 |
Yes |
Yes |
4,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00057 |
Renewable wind power project in India -1- 007 |
India |
30 Dec 2021 - 13 Jan 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 21.0 |
1,122,417 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00451 |
Akşar Nazar HEPP |
Türkiye |
2 Oct 2022 - 16 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources– Version 20.02 |
53,805 |
Yes |
Yes |
5,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00412 |
Okyanus Solar Power Plant Bundle |
Türkiye |
25 Sep 2022 - 9 Oct 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
28,695 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00073 |
Solar Power Project by M/s Godawari Power and Ispat Limited |
India |
16 Jan 2022 - 30 Jan 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
76026 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00226 |
Makascı-1 Solar Power Plant Bundle |
Türkiye |
18 May 2022 - 1 Jun 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
13,322 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00446 |
Yeniköy Wind Power Plant |
Türkiye |
29 Sep 2022 - 13 Oct 2022 |
AMS-I.D: “Grid connected renewable electricity generation” (Version 18.0) |
28,499 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00453 |
116.1 MW Wind Project |
India |
2 Oct 2022 - 16 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
330,215 |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00220 |
Renewable Energy Project by Enviro Solaire Private Limited |
India |
15 May 2022 - 29 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
113,540 |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00630 |
Fevzipasa-1 Bundled Solar Power Plants |
Türkiye |
23 Nov 2022 - 7 Dec 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
13892.4 |
Yes |
Yes |
SDG-7, SDG-8, SDG-9, SDG-13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00239 |
Solar Power Project by M/s Roha Dyechem Private Limited, in Maharashtra, India |
India |
29 May 2022 - 12 Jun 2022 |
CDM Methodology- AMS-I.D.: Grid connected renewable electricity generation -Version 18.0 |
15213 tCO2e /annum |
Yes |
Yes |
1, 3, 4, 5, 6, 7, 8,9, 15 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00240 |
Dai Phong Wind Power Plant Project |
Viet Nam |
29 May 2022 - 12 Jun 2022 |
ACM0002: Grid-connected electricity generation from renewable sources (Version 20.0) |
139,318 tCO2/year |
Yes |
Yes |
1, 7, 8 & 13 |
Gold |
CORSIA(C+) |
REQUEST FOR REGISTRATION |
S00619 |
Dau Tieng 2 Solar Power Plant Project |
Viet Nam |
21 Nov 2022 - 5 Dec 2022 |
ACM0002 v20.0 |
322,202 |
Yes |
Yes |
#3, #7, #8, #9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00806 |
Phan Lam Solar Power Project |
Viet Nam |
8 Jan 2023 - 22 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 21.0 |
48,109 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00531 |
ALPASLAN II HEPP |
Türkiye |
23 Oct 2022 - 6 Nov 2022 |
CDM Approved ACM0002 Grid-connected electricity generation from renewable sources, version 20.0 |
494265 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00376 |
Kapıdağ WPP |
Türkiye |
14 Sep 2022 - 28 Sep 2022 |
AMS-I.D. , version 18.0 |
31,632 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00925 |
Bundled 2 Solar Power Project in India |
India |
22 Mar 2023 - 5 Apr 2023 |
GCCM001: Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, version 4.0 |
143,099 |
Yes |
Yes |
1,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00736 |
Song Luy 1 Solar Power Plant Project |
Viet Nam |
19 Dec 2022 - 2 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
51,924 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00079 |
Kumluca Bundled SPP |
Türkiye |
23 Jan 2022 - 6 Feb 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
14,979 |
Yes |
Yes |
6, 7, 11 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00625 |
Alamettin GHZW Solar Power Plant Bundle |
Türkiye |
23 Nov 2022 - 7 Dec 2022 |
AMS-I D Small Scale Methodology: Grid connected renewable electricity generation V.18.0 |
14,177 |
Yes |
Yes |
SDGs 6, 7, 8, 9, 11 and 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00702 |
KARAMAN WPP |
Türkiye |
11 Dec 2022 - 25 Dec 2022 |
ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 20 |
116,671 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00305 |
Balsuyu Domanic Bundled Solar Power Plants |
Türkiye |
14 Aug 2022 - 28 Aug 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
8119 |
Yes |
Yes |
SDG-7, SDG-8, SDG-9, SDG-13 |
Gold |
CORSIA(C+) |
GCC ASSESMENT |
S00496 |
Yenikent Landfill Gas to Electricity Project |
Türkiye |
10 Oct 2022 - 24 Oct 2022 |
ACM0001: Flaring or use of landfill gas - Version 19.0 |
91,153 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00660 |
HELIOS I PHOTOVOLTAIC PARK |
Colombia |
2 Dec 2022 - 16 Dec 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers V3.0 |
16328 |
Yes |
Yes |
4,5,6,7,8 and 9. |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00436 |
Solar Power Project Bundle 2 by Renktaş Mimarlık |
Türkiye |
28 Sep 2022 - 12 Oct 2022 |
AMS-I.D. Version 18.0 |
11,714 |
Yes |
Yes |
3, 7, 8, 9, 11, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00143 |
LIG - QUANG TRI SOLAR POWER PROJECT |
Viet Nam |
28 Mar 2022 - 11 Apr 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0 |
58,439 tCO2e/year |
Yes |
Yes |
SDG7, SDG8, SDG9 |
Gold |
CORSIA(C+) |
GCC ASSESMENT |
S00287 |
Balsuyu Karapinar Bundled Solar Power Plants |
Türkiye |
3 Aug 2022 - 17 Aug 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
4258 |
Yes |
Yes |
SDG-7, SDG-8, SDG-9, SDG-13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00435 |
Solar Power Project Bundle 3 by Renktaş Mimarlık |
Türkiye |
28 Sep 2022 - 12 Oct 2022 |
AMS-I.D. Version 18.0 |
12,084 |
Yes |
Yes |
3, 7, 8, 9, 11, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00819 |
6.3 MW Bundled Wind Power Project in Gujarat & Karnataka |
India |
15 Jan 2023 - 29 Jan 2023 |
AMS-I.D.: - Grid connected renewable electricity generation - Version 18.0 |
12,324 |
Yes |
Yes |
1,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00350 |
Bundled Solar Power Project 2 by Elektro Ege Elektrik |
Türkiye |
11 Sep 2022 - 25 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0. |
11,875 |
Yes |
Yes |
5,7,8,9,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00434 |
Özkoyuncu Aktarma Bundle SPP Project |
Türkiye |
28 Sep 2022 - 12 Oct 2022 |
ACM0002 version 20.0, Grid-connected electricity generation from renewable sources |
40,014 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00629 |
226.8 MW Wind Power Project at Amidyala in Anantapuram district, Andhra Pradesh, India. |
India |
23 Nov 2022 - 7 Dec 2022 |
GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022) |
463,202 |
Yes |
Yes |
1,3,4,7,8 & 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00377 |
70 MW Bundled Solar Project at Maharashtra & Karnataka |
India |
14 Sep 2022 - 28 Sep 2022 |
GCC M001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, version 3.0 |
1,13,854 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00392 |
IE KARNATAKA 3 |
India |
21 Sep 2022 - 5 Oct 2022 |
AMS-I.F.: Renewable electricity generation for captive use and mini-grid Version 04.0 |
5,364 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00899 |
Bundled Solar Power Project in Tamilnadu by BHEL |
India |
21 Feb 2023 - 7 Mar 2023 |
AMS I.D. |
19,359 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00336 |
Bundled Solar Power Project 2 by Elestaş Enerji |
Türkiye |
7 Sep 2022 - 21 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
12,433 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00306 |
AKÇA WPP |
Türkiye |
14 Aug 2022 - 28 Aug 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
36816 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00886 |
230 MW Ettayapuram Solar PV Project |
India |
20 Feb 2023 - 6 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
490079 |
Yes |
Yes |
SDG1, SDG7, SDG8, SDG13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00681 |
36 MW Wind Power Project by Surya Vidyut Limited |
India |
6 Dec 2022 - 20 Dec 2022 |
ACM0002,Version 21.0 |
58,688 |
Yes |
Yes |
5, 7, 8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00607 |
Baotou Hongnijing 40MW Solar Power Project |
China |
20 Nov 2022 - 4 Dec 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
53698 |
Yes |
Yes |
#7 #8 #9#13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00829 |
Ventos de Tianguá Wind Complex |
Brazil |
17 Jan 2023 - 31 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 21.0 |
303,326 |
Yes |
Yes |
7, 8, 9 and 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00525 |
Kaposvár East PVPP |
Hungary |
19 Oct 2022 - 2 Nov 2022 |
Version 2.0 of GCCM001 “Methodology for Grid Connected Renewable Energy Generation Projects |
19692 |
Yes |
Yes |
7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00389 |
Floating Solar project of Greenam Energy |
India |
20 Sep 2022 - 4 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
39,506 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00739 |
Replacement of Conventional Sodium Vapor Streetlights with High Energy Efficient LED Streetlights in Doha, Qatar |
Qatar |
19 Dec 2022 - 2 Jan 2023 |
AMS-II. L "Demand-side activities for efficient outdoor and street lighting technologies" Version 2.0 |
4956 |
Yes |
Yes |
SDG#3,SDG#8,SDG#11 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00799 |
Panda Van Biogas Project |
Türkiye |
5 Jan 2023 - 19 Jan 2023 |
ACM0022: Alternative waste treatment process Version 03.0 and ACM0001: Flaring or use of landfill gas Version 19.0 |
170,038 tCO2/year |
Yes |
Yes |
SDG # 6, SDG # 7, SDG # 8 and SDG # 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00896 |
LOC NINH 1, 2 and 3 by Super Energy Corp |
Viet Nam |
20 Feb 2023 - 6 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 21.0 |
610,147 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00088 |
CTGR Zuoyun Shuiyao Solar Power Project |
China |
31 Jan 2022 - 14 Feb 2022 |
ACM0002 version20.0 |
116,563 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00459 |
Lianhe Mulei Photovoltaic Park 100MWp Solar Power Project |
China |
2 Oct 2022 - 16 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
101,145 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00114 |
Renewable wind power project in India -1- 005 |
India |
27 Feb 2022 - 13 Mar 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 21 |
719,932 |
Yes |
Yes |
7, 8 & 13 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00509 |
Guilin Shankou MSW Landfill Site Biogas Treatment and Recycling Project |
China |
13 Oct 2022 - 27 Oct 2022 |
Flaring or use of landfill gas (ACM0001 v19.0) |
120479 |
Yes |
Yes |
SDG# 7, SDG# 8, SDG# 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00262 |
Carbon credits generated by Wind Power Projects of PEL at Madhya Pradesh Andhra Pradesh & Karnataka. |
India |
20 Jul 2022 - 3 Aug 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
473,855 tCO2e |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00368 |
Bundled Solar Power Project 2 By Fiba Yenilenebilir Enerji |
Türkiye |
14 Sep 2022 - 28 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
13,715 |
Yes |
Yes |
SDG 11, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00634 |
Oğuzeli Biogas Plant Project |
Türkiye |
27 Nov 2022 - 11 Dec 2022 |
AMS-III.D. Methane recovery in animal manure management systems, version 21 |
30,224 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00911 |
22 MW Kayakulam Floating Solar PV Project |
India |
6 Mar 2023 - 20 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
44070 |
Yes |
Yes |
SDG7, SDG8, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00103 |
Arinsun Clean Energy Private Limited |
India |
16 Feb 2022 - 2 Mar 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
496,473 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00178 |
Alibeyhoyugu SPP |
Türkiye |
18 Apr 2022 - 2 May 2022 |
ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 20 |
23334 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00116 |
Mutlu Yeniköy WPP |
Türkiye |
27 Feb 2022 - 13 Mar 2022 |
ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 20 |
108893 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00621 |
14.70 MW bundled solar power project by Aditya Green Energy Pvt. Ltd. |
India |
21 Nov 2022 - 5 Dec 2022 |
AMS-I.D.: - Grid Connected renewable electricity generation – Version 18.0. |
18,654 tCO2e/annum |
Yes |
Yes |
SDG 7, SDG 8, SDG 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00908 |
Çorum Biogas Power Plant |
Türkiye |
5 Mar 2023 - 19 Mar 2023 |
AM0073 “GHG emission reductions through multi-site manure collection and treatment in a central plant” -- V1.0 |
151,821 |
Yes |
Yes |
SDGs 3, 7, 8, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00793 |
Fernas-4 SPP |
Türkiye |
5 Jan 2023 - 19 Jan 2023 |
ACM0002 ver.20 |
32778 |
Yes |
Yes |
7, 8, 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00543 |
Derik Biomass |
Türkiye |
23 Oct 2022 - 6 Nov 2022 |
AMS-I.D: Grid connected renewable electricity generation, Version 18.0 |
44,001 |
Yes |
Yes |
7, 8, 9, 12 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00108 |
Mutlukizan Bundled SPP |
Türkiye |
20 Feb 2022 - 6 Mar 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
16,578 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00257 |
Sav-Ek Solar Power Plant Bundle |
Türkiye |
3 Jul 2022 - 17 Jul 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
29,104 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00109 |
20 MW Grid connected solar power project in Maharashtra, India by SAEL |
India |
20 Feb 2022 - 6 Mar 2022 |
ACM0002, Version-20.0 |
31100 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
GCC ASSESMENT |
S00465 |
29.9 MW Wind Project in Gujarat |
India |
5 Oct 2022 - 19 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
78402 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00743 |
12 MW Wind Energy Project in Mundra, Gujarat |
India |
20 Dec 2022 - 3 Jan 2023 |
AMS-1. D- Grid connected renewable electricity Generation, Version -18 |
42,930 |
Yes |
Yes |
3, 5, 7, 8, 9 & 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00145 |
Sivrihisar Bundled SPP |
Türkiye |
30 Mar 2022 - 13 Apr 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
17,167 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00393 |
7 MW Bundled Solar Project in Tamil Nadu |
India |
21 Sep 2022 - 5 Oct 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
10,431 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00072 |
60 MW Wind projects in Thailand by WED |
Thailand |
16 Jan 2022 - 30 Jan 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
101,119 |
Yes |
Yes |
SDG 7,8,9 and 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00184 |
Umutlu HEPP |
Türkiye |
21 Apr 2022 - 5 May 2022 |
ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 20 |
45027 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00419 |
Huimin Hengtai 20MW Photovoltaic Power Generation Project |
China |
26 Sep 2022 - 10 Oct 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0); |
20,314 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00401 |
NamKhan 2 |
Lao People's Democratic Republic |
25 Sep 2022 - 9 Oct 2022 |
ACM0002.: Grid-connected electricity generation from renewable sources, Version 20.0 |
317,685 tCO2e |
Yes |
Yes |
SDG 7, 8, 9, 11 and 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00248 |
MUI NE SOLAR POWER PROJECT |
Viet Nam |
6 Jun 2022 - 20 Jun 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0 |
53,203 tCO2/year |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00740 |
Erciyes 1 Solar Bundle |
Türkiye |
19 Dec 2022 - 2 Jan 2023 |
AMS-I.D.: Grid connected renewable electricity generation - v18.0 |
12,912 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00503 |
Kıyıköy WPP Capacity Addition Project |
Türkiye |
11 Oct 2022 - 25 Oct 2022 |
ACM0002, Version 20 |
148,697 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00902 |
Bundled 7 Solar Power Project in India |
India |
23 Feb 2023 - 9 Mar 2023 |
GCCM001 - Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, version 4.0 |
32,750 |
Yes |
Yes |
1,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00849 |
Ca Nan 1 Hydropower Project in Vietnam |
Viet Nam |
26 Jan 2023 - 9 Feb 2023 |
AMS I.D- Grid Connected Renewable electricity Generation-Version 18.0 |
22336 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00333 |
Ho Bau Ngu Solar Power Project |
Viet Nam |
7 Sep 2022 - 21 Sep 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0 |
75700 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00824 |
Echo 4 Wind Complex |
Brazil |
17 Jan 2023 - 31 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
183,454 |
Yes |
Yes |
7, 8, 9 and 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00759 |
Solar Power Plant on Canal Bund in Andhra Pradesh, lndia |
India |
26 Dec 2022 - 9 Jan 2023 |
AMS.I.D-Grid Connected Renewable Electricity Generation – Version 18 |
6,734 |
Yes |
Yes |
SDG 07, SDG 08, |
Silver |
CORSIA(C+) |
VERIFICATION |
S00420 |
Guan County Minghui 40MWp Grid connected Photovoltaic Power Generation Project |
China |
26 Sep 2022 - 10 Oct 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0); |
37,343 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00060 |
5 MW Solar Power Project by JLTM Energy in India |
India |
9 Jan 2022 - 23 Jan 2022 |
AMS-I.D.: Grid connected renewable electricity generation -Version 18.0 |
6,717 |
Yes |
Yes |
SDG 7, SDG 8 |
Silver |
CORSIA(C+) |
GCC ASSESMENT |
S00695 |
Tire Biogas Plant Project |
Türkiye |
8 Dec 2022 - 22 Dec 2022 |
GCCM003-Methodology-for-Energy-Generation-from-Animal-Manure-and-Waste-Management-Projects-v1 |
91,866 |
Yes |
Yes |
6, 7, 8, 9, 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00520 |
6 MW Biomass Cogeneration rise husk project by Sri Ramadas Paperboards Pvt. Ltd. |
India |
19 Oct 2022 - 2 Nov 2022 |
AMS.I.C.: Thermal energy production with or without electricity - Version 22.0 |
29,023 |
Yes |
Yes |
1,3,5,7,8,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00818 |
Hydro-Power Project activity in Maharashtra |
India |
12 Jan 2023 - 26 Jan 2023 |
ACM0002 (Version 20) |
97,381 |
Yes |
Yes |
1,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00082 |
Bükor Solar Power Plant Bundle |
Türkiye |
23 Jan 2022 - 6 Feb 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
21,348 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00814 |
MASFEN-14 Solar Bundle |
Türkiye |
10 Jan 2023 - 24 Jan 2023 |
AMS-I.D.: Grid connected renewable electricity generation - v18.0 |
13,125 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00856 |
Acarsoy Biomass Power Plant Project |
Türkiye |
29 Jan 2023 - 12 Feb 2023 |
ACM0018 “Large-scale Consolidated Methodology: Electricity generation from biomass in power-only plants”, Version 5.0 |
43,674 |
Yes |
Yes |
6,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00356 |
12.5MW Waste Heat Recovery based power generation at MHIPL |
India |
11 Sep 2022 - 25 Sep 2022 |
ACM0012- Waste energy recovery, Version-06.0 |
62087 |
Yes |
Yes |
SDG Goals: SDG 7, 8, 9, 11 and 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00461 |
300 MW Solar Power Project in Rajasthan by Ayana Renewable. |
India |
2 Oct 2022 - 16 Oct 2022 |
ACM 0002, Version 20 |
609720 |
Yes |
Yes |
1,5,7,8,9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00575 |
13.5 MW Hydro Power Project by Nanti Hydro Power Private, India |
India |
6 Nov 2022 - 20 Nov 2022 |
AMS-I.D. Grid connected renewable electricity generation --- Version 18.0 |
48,279 |
Yes |
Yes |
1,7,8 and 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00135 |
Wind Power Project in Thatta, Sindh by Triconboston |
Pakistan |
24 Mar 2022 - 7 Apr 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
264,367 tCO2e |
Yes |
Yes |
Goals 1, 3, 4, 5, 6, 7, 8, 13,15 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00197 |
Wind Power Project in Thatta, Sindh by Liberty Wind Power 1 Limited |
Pakistan |
24 Apr 2022 - 8 May 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
95,686 tCO2e |
Yes |
Yes |
Goals 3, 4, 6, 7, 8, 13 |
Diamond |
CORSIA(C+) |
GCC ASSESMENT |
S00523 |
Dracena |
Brazil |
19 Oct 2022 - 2 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
86227 |
Yes |
Yes |
5, 7, 8, 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00285 |
Wind Power Project in Thatta, Sindh by NASDA Green Energy Limited |
Pakistan |
1 Aug 2022 - 15 Aug 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
97,476 tCO2e |
Yes |
Yes |
SDG 3,4,6,7,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00707 |
Palnadu_Mourya Solar 8 MW |
India |
11 Dec 2022 - 25 Dec 2022 |
AMS-1 D, v18.0 |
13,814 (TCO2/Year) |
Yes |
Yes |
Goals 7,8,9,11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00480 |
60 MW Wind Power Project |
India |
6 Oct 2022 - 20 Oct 2022 |
ACM0002,Version 20 |
97,864 |
Yes |
Yes |
SDG3,SDG5, SDG7,SDG8,SDG 9,SDG13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00339 |
Erikoğlu SPP Bundle |
Türkiye |
7 Sep 2022 - 21 Sep 2022 |
AMS-I.D.: Grid Connected Renewable Electricity Generation --- Version 18.0 |
8,450 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00536 |
Renewable Hydro Project by Sandhya Hydro Power Projects Balargha Private Limited |
India |
23 Oct 2022 - 6 Nov 2022 |
AMS I.D. Grid connected renewable electricity generation--- Version 18.0 |
44,993 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00362 |
7MW Waste Heat Recovery based power generation at SJCPL |
India |
12 Sep 2022 - 26 Sep 2022 |
ACM0012- Waste energy recovery, Version-06.0, EB87, Annex-7 |
34768 |
Yes |
Yes |
SDG 7, 8, 9, 11 and 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00522 |
Lale-Seydioğlu Hydroelectric Power Plant Bundle |
Türkiye |
19 Oct 2022 - 2 Nov 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
13,033 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00826 |
Echo 6 Wind Complex |
Brazil |
17 Jan 2023 - 31 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 21.0 |
218,281 |
Yes |
Yes |
7, 8, 9 and 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00347 |
Zephyr Power Limited - 50 MW Wind Power Project |
Pakistan |
8 Sep 2022 - 22 Sep 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
92,690 |
Yes |
Yes |
SDG 7, 8, 9, 11,13 and 15 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00167 |
Renewable solar power project in India -2- 003 |
India |
12 Apr 2022 - 26 Apr 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
289,557 |
Yes |
Yes |
1,3,4,5,7,8,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00158 |
Solar Project in Punjab by M/s Magnet Buildtech Private Limited |
India |
6 Apr 2022 - 20 Apr 2022 |
GCCM001 “Methodology for Grid Connected Renewable Energy Generation Projects”, version 2.0. |
71,049 tCO2e |
Yes |
Yes |
1,5,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00593 |
Renewable Wind Power Project in Gujarat by CGEIPL 2 |
India |
14 Nov 2022 - 28 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
363,536 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00343 |
Solar Power Project by Lentaz Enerji |
Türkiye |
8 Sep 2022 - 22 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
9436 |
Yes |
Yes |
7,8 and 13 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00596 |
Huong Tan Wind Farm - Tan Linh Wind Farm |
Viet Nam |
15 Nov 2022 - 29 Nov 2022 |
ACM0002 v20.0 |
263,470 |
Yes |
Yes |
#3, #7, #8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00457 |
Ho Nui Mot 1 Solar Power Project |
Viet Nam |
2 Oct 2022 - 16 Oct 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0 |
66,935 |
Yes |
Yes |
7,8,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00667 |
22.5 MW Solar Project in Tamil Nadu |
India |
5 Dec 2022 - 19 Dec 2022 |
ACM0002 version 20.0 |
37,896 TCO2/Year |
Yes |
Yes |
Goal-4, Goal-7, Goal-8, Goal-9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00455 |
Assuruá 1 Wind Power Plant Project |
Brazil |
2 Oct 2022 - 16 Oct 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources V20.0 |
140,878 |
Yes |
Yes |
1, 2, 4, 6, 7, 8, 9, 10 and 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00146 |
Renewable solar power project in India -2- 004 |
India |
31 Mar 2022 - 14 Apr 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
1,078,310 |
Yes |
Yes |
1,3,4,5,7,8,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00415 |
15MW Bundled solar PV based power generation |
India |
26 Sep 2022 - 10 Oct 2022 |
AMS-I.F- Renewable electricity generation for captive use and mini-grid Version-4.0 |
21592 |
Yes |
Yes |
SDG 7, 8, 9, 11 and 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00332 |
Gaziosmanpaşa Wind Power Plant |
Türkiye |
7 Sep 2022 - 21 Sep 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
129,640 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00717 |
14.24 MW Bundled solar project |
India |
12 Dec 2022 - 26 Dec 2022 |
AMS I.D- Grid Connected Renewable electricity Generation-Version 18.0 |
25,633 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00778 |
Gökçeler Hydroelectric Power Plant Bundle Project |
Türkiye |
3 Jan 2023 - 17 Jan 2023 |
AMS-I.D Small-scale Methodology: Grid connected renewable electricity generation Version 18.0 |
23,683 |
Yes |
Yes |
7,8,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00551 |
Vyshali Wind Power project at Karnataka, India. |
India |
26 Oct 2022 - 9 Nov 2022 |
GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022) |
107,363 |
Yes |
Yes |
1,3,4,7,8 & 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00330 |
Biomass thermal project in India (004) |
India |
6 Sep 2022 - 20 Sep 2022 |
AMS I.C: Thermal Energy Production with or without electricity -version 22.0 |
31276 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00335 |
Solar Project by Eden Renewable CITE Private Limited |
India |
7 Sep 2022 - 21 Sep 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0. |
729,398 |
Yes |
Yes |
4,7,8 and 13 |
Gold |
CORSIA(C+) |
REQUEST FOR REGISTRATION |
S00154 |
Poultry Liter to Bio CNG project by M/s Solika Energy Pvt. Ltd. |
India |
4 Apr 2022 - 18 Apr 2022 |
AMS-III.D - Version 21.0, AMS-III.AQ. - Version 2.0 |
38,985 tCO2e |
Yes |
Yes |
1,5,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00585 |
Solar Power Project Bundle 1 by Renktaş Mimarlık |
Türkiye |
8 Nov 2022 - 22 Nov 2022 |
AMS-I.D. Version 18.0 |
12,376 |
Yes |
Yes |
4, 7, 8, 9, 11, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00608 |
Renewable Wind Power Project in Gujarat by CGEIPL 3 |
India |
20 Nov 2022 - 4 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
469,212 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00602 |
Biomass based cogeneration project by Sonthalia |
India |
15 Nov 2022 - 29 Nov 2022 |
AMS-I.C. Version-22.0 |
18,526 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00828 |
Echo 3 Wind Complex |
Brazil |
17 Jan 2023 - 31 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 21.0 |
226,381 |
Yes |
Yes |
7, 8, 9 and 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00469 |
Shanxi Junxiangtong 14MW Coal Mine Methane Power Generation Project |
China |
5 Oct 2022 - 19 Oct 2022 |
ACM0008 version8.0 |
237,135 |
Yes |
Yes |
#8,#11,#13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00635 |
Wind Energy Project in Kutch, Gujarat-4 |
India |
27 Nov 2022 - 11 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
914,563 |
Yes |
Yes |
3, 5, 7, 8, 9 & 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00744 |
Captive solar project by Shahi Exports |
India |
20 Dec 2022 - 3 Jan 2023 |
GCCM0001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers--- Version 4.02 |
107,047 |
Yes |
Yes |
3,4,5,7,8,9,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00406 |
Biomass Project by Ipca Laboratories Ltd. |
India |
25 Sep 2022 - 9 Oct 2022 |
AMS-I.C.: Thermal energy production with or without electricity --- Version 22.0. |
17,265 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00803 |
100 MW Bundled Solar Project_HPPPL |
India |
5 Jan 2023 - 19 Jan 2023 |
ACM0002 version 20.0 |
161,935 TCO2/Year |
Yes |
Yes |
Goal-4, Goal-7, Goal-8, Goal-9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00462 |
10 MW Bundled Solar Project |
India |
2 Oct 2022 - 16 Oct 2022 |
AMS-1 D, v18.0 |
17,412 (TCO2/Year) |
Yes |
Yes |
Goals 7,8,9,11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00011 (GSC REDONE) |
62 MW Solar Power Project by OPG Power Generation Private Limited (GSC REDONE) |
India |
15 Jul 2021 - 29 Jul 2021 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 (Approved CDM methodology) |
108,998 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00490 |
15 MW Wind Energy Project by Wonder Cement in Rajasthan |
India |
9 Oct 2022 - 23 Oct 2022 |
AMS-I.D.: - Grid Connected renewable electricity generation – Version 18.0 |
4108 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00663 |
Solar Power Project in Punjab |
India |
5 Dec 2022 - 19 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
213519 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00628 |
T-Power Solar Power Plant Bundle |
Türkiye |
23 Nov 2022 - 7 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
5,976 |
Yes |
Yes |
SDG #7, SDG #8, SDG #9, SDG #13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00105 (GSC REDONE) |
50 MW Solar Power Project in Haryana (GSC REDONE) |
India |
17 Feb 2022 - 3 Mar 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
105204 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00568 |
RALA, 13 MW Hydro Power Plant by Taranda Hydro Power Private Limited, INDIA. |
India |
3 Nov 2022 - 17 Nov 2022 |
AMS-I.D. Grid connected renewable electricity generation --- Version 18.0 |
54,259 |
Yes |
Yes |
1,7,8 and 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00147 |
Waste to Bio CNG project by M/s Greenearth Biogas Pvt. Ltd. |
India |
31 Mar 2022 - 14 Apr 2022 |
GCCM003, AMS-III.AQ |
42,363 tCO2e |
Yes |
Yes |
1,5,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00505 |
16 MW Solar Power Project in Rajapura |
India |
12 Oct 2022 - 26 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
24138 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00694 |
30 MW Bundled Solar Power Project in India |
India |
8 Dec 2022 - 22 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
40,545 |
Yes |
Yes |
5,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00710 |
Osona grid connected Solar PV Project in Namibia |
Namibia |
12 Dec 2022 - 26 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
13221 |
Yes |
Yes |
7,8,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00903 |
Ödek Beyges Solar Power Plant Bundle |
Türkiye |
28 Feb 2023 - 14 Mar 2023 |
AMS-I D Small Scale Methodology: Grid connected renewable electricity generation V.18 |
15,784 |
Yes |
Yes |
SDGs 6, 7, 8, 11, 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00738 |
Bundled Wind Power Project in Tamilnadu, coordinated by VEC-002 |
India |
19 Dec 2022 - 2 Jan 2023 |
AMS I.D. Grid connected renewable electricity generation--- Version 18.0 |
32,310 |
Yes |
Yes |
1,7,8,9,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00718 |
31.25 MW Solar Power Project in Chhattisgarh |
India |
12 Dec 2022 - 26 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
60,699 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00165 |
Esentepe Regulator and Hydroelectric Power Plant |
Türkiye |
12 Apr 2022 - 26 Apr 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
25,500 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00155 |
Yukarı Kaleköy Hydro Power Plant Project in Solhan, Bingöl |
Türkiye |
4 Apr 2022 - 18 Apr 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
858,587 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00527 |
Zhuhai Xikengwei Landfill Gas for Power Generation Project |
China |
20 Oct 2022 - 3 Nov 2022 |
ACM0001 Version 19.0 |
53426 |
Yes |
Yes |
SDG #7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00670 |
Solarpower Durasıl Solar Power Plant Bundle |
Türkiye |
6 Dec 2022 - 20 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
40,364 |
Yes |
Yes |
SDGs 6, 7, 8, 9, 11 and 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00904 |
Kavak Beypazarı Bey Solar Power Plant Bundle |
Türkiye |
28 Feb 2023 - 14 Mar 2023 |
AMS-I D Small Scale Methodology: Grid connected renewable electricity generation V.18 |
14,195 |
Yes |
Yes |
SDGs 6, 7, 8, 11, 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00653 |
15 MW Solar Project_HPPPL |
India |
29 Nov 2022 - 13 Dec 2022 |
AMS I.D. version 18.0 |
20,899 (TCO2/Year) |
Yes |
Yes |
Goal-4, Goal-7, Goal-8, Goal9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00233 |
87MW Solar Project in Gujarat by M/S Torrent Power Limited |
India |
19 May 2022 - 2 Jun 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
118,857 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00474 |
Elbistan-1 Bundled SPP |
Türkiye |
5 Oct 2022 - 19 Oct 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
13,665 |
Yes |
Yes |
6, 7, 8, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00323 |
KDL Group Solar Bundle |
Türkiye |
25 Aug 2022 - 8 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
10,006 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00821 |
Renewable Solar Power Project by Mahindra Renewable Private Limited. |
India |
15 Jan 2023 - 29 Jan 2023 |
CDM approved consolidated Methodology ACM0002, version 21.0 |
95,882 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00161 |
Aliağa WPP Capacity Addition Project |
Türkiye |
7 Apr 2022 - 21 Apr 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
71,531 |
Yes |
Yes |
4, 6, 7, 8, 9, 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00729 |
Zuka Power 133MW bundled Solar PV Power projects at Telangana and Andhra Pradesh, India |
India |
14 Dec 2022 - 28 Dec 2022 |
GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022) |
226,411 |
Yes |
Yes |
1,3,4,7,8 and 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00274 |
Renewable Wind Power Project in Gujarat by CGEIPL 1 |
India |
27 Jul 2022 - 10 Aug 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
329,924 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00242 |
Biomass based thermal energy plant by Goodrich carbohydrates Limited, Haryana |
India |
30 May 2022 - 13 Jun 2022 |
AMS I.C. version 22 |
28,920 tCO2e |
Yes |
Yes |
3,6,8,9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00728 |
Baishitoukouzi Cascade Hydropower Project |
China |
14 Dec 2022 - 28 Dec 2022 |
ACM0002, Version 20.0 |
81,891 |
Yes |
Yes |
SDG #7, #8, #9 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00463 |
50 MW Rawra Solar Energy Project |
India |
2 Oct 2022 - 16 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
103,279 |
Yes |
Yes |
3, 5, 7, 8, 9 & 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00618 |
Renewable Wind Power Project in Gujarat by CGEIPL 5 |
India |
21 Nov 2022 - 5 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
143,302 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00537 |
Rice Husk Based Biomass Power Project by T.S. Power Plant Company Limited |
Thailand |
23 Oct 2022 - 6 Nov 2022 |
ASM-I.D: Grid connected renewable electricity generation, Version 18.0 |
26,784 |
Yes |
Yes |
5, 7, 8, and 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00603 |
10MW Shanmukha Subramanya mini Hydel scheme in Karnataka, India |
India |
16 Nov 2022 - 30 Nov 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
19,403 |
Yes |
Yes |
1,3,4,7,8 & 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00890 |
Alxa League Bayanhaote 50MW Solar Power Project |
China |
20 Feb 2023 - 6 Mar 2023 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 21.0) |
62379 |
Yes |
Yes |
#7 #8#13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00734 |
Renewable Solar Power Plant Bundle by Bosphorus |
Türkiye |
14 Dec 2022 - 28 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
50,332 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00168 |
Solar project by Yarrow Infrastructure Private Limited |
India |
12 Apr 2022 - 26 Apr 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
91,657 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00437 |
180 MW Solar Energy Project in Mesanka, Gujarat |
India |
28 Sep 2022 - 12 Oct 2022 |
ACM0002- Grid-connected electricity generation from renewable sources, Version -20 |
400,961 |
Yes |
Yes |
SDG 9,SDG 8,SDG 7,SDG 5, SDG 3,SDG 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00171 |
Solar project by Sepset Constructions Limited |
India |
13 Apr 2022 - 27 Apr 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
75,219 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00208 |
Renewable wind power project in India -1- 003 |
India |
11 May 2022 - 25 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
226,733 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00263 |
Renewable wind power project in India -1- 008 |
India |
21 Jul 2022 - 4 Aug 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
211,982 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00863 |
Campos dos Ventos e São Benedito Complex |
Brazil |
6 Feb 2023 - 20 Feb 2023 |
ACM0002 – Grid-connected electricity generation from renewable sources V21.0 |
561,523 |
Yes |
Yes |
1, 7, 8, 9, 10, 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00433 |
Antai 2*45MW Waste Heat Utilization for Power Generation Project |
China |
27 Sep 2022 - 11 Oct 2022 |
ACM0012 Version 06.0 |
381,350 |
Yes |
Yes |
#8, #9 |
Silver |
N/A |
VERIFICATION |
S00674 |
50 MWp Solar Power Project by Oursun Solar |
Pakistan |
6 Dec 2022 - 20 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.03 |
46,818 |
Yes |
Yes |
4,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00560 |
Wushi County Wuyibulake River First-Class Hydro Power Plant Project |
China |
31 Oct 2022 - 14 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources( Version 20.0) |
20608 |
Yes |
Yes |
#7, #8,#13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00182 |
Soğanlı Wind Power Plant |
Türkiye |
19 Apr 2022 - 3 May 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
249,103 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00187 |
Erimez Wind Power Plant |
Türkiye |
21 Apr 2022 - 5 May 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
24,515 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00106 |
Kusoturagi Bundled SPP |
Türkiye |
17 Feb 2022 - 3 Mar 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
5,447 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
REGISTERED |
S00644 |
Malindi Solar Farm |
Kenya |
28 Nov 2022 - 12 Dec 2022 |
ACM0002 v20.0 |
35,733 |
Yes |
Yes |
#4, #7, #8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00186 |
Geriş Wind Power Plant |
Türkiye |
21 Apr 2022 - 5 May 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
25438 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00188 |
Atakale Wind Power Plant |
Türkiye |
21 Apr 2022 - 5 May 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
227,028 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG 11, SGD 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00677 |
AGV and BH Solar Power Projects by AES |
Brazil |
6 Dec 2022 - 20 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
87,788 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00144 |
Kas Bundled SPP |
Türkiye |
30 Mar 2022 - 13 Apr 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
15,348 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
REGISTERED |
S00176 |
Sihong Tianganghu Bundled Solar Power Project |
China |
17 Apr 2022 - 1 May 2022 |
ACM0002 version20.0 |
177,098 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00179 |
Tongwei Tangshan Fengnan Solar Power Project |
China |
18 Apr 2022 - 2 May 2022 |
ACM0002 version20.0 |
83,763 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00448 |
Assuruá II, Delta 5-6 and Delta 7-8 Complex Project |
Brazil |
2 Oct 2022 - 16 Oct 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources V20.0 |
801,102 |
Yes |
Yes |
1, 2, 4, 6, 7, 8, 9, 10 and 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00577 |
47 MW Bundled Solar Project in Karnataka |
India |
6 Nov 2022 - 20 Nov 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
76825 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00508 |
Cine Biomass Power Plant Project |
Türkiye |
13 Oct 2022 - 27 Oct 2022 |
ACM0018: Electricity generation from biomass in power-only plants --- Version 6.0 |
48573 |
Yes |
Yes |
6, 7, 8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00909 |
Cleanergy Solar Bundle by Energy Advisory Services |
India |
6 Mar 2023 - 20 Mar 2023 |
AMS-1.D, Version 18.0 |
21692 |
Yes |
Yes |
SDG 7,8,11,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00308 |
Bingöl Landfill Gas to Electricity Project |
Türkiye |
14 Aug 2022 - 28 Aug 2022 |
AMS-III.G: “Landfill methane recovery” --- Version 10.0, AMS-I.D: “Grid connected renewable electricity generation” ---Version 18.0 |
19,114 |
Yes |
Yes |
5,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00679 |
Hunshuitang 30MW Grid-connected Solar Power Generation Project |
China |
6 Dec 2022 - 20 Dec 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0) |
29,737 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00449 |
Delta 2 Wind Power Plant Project |
Brazil |
2 Oct 2022 - 16 Oct 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources V20.0 |
169,424 |
Yes |
Yes |
1, 4, 7, 8, 9, 10 and 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00212 |
Aşağı Kaleköy PV Power Project in Genç, Bingöl |
Türkiye |
12 May 2022 - 26 May 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
85,044 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00692 |
12.5 MW (DC) Solar Power Project by Aditya Green Energy Private Limited in Maharashtra, India |
India |
8 Dec 2022 - 22 Dec 2022 |
AMS-I.D “Grid-connected renewable electricity generation”, Version – 18.0 |
15,507 |
Yes |
Yes |
SDG-7, SDG-8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00539 |
Pennar Renewables solar power project bundle in Telangana State, INDIA. |
India |
23 Oct 2022 - 6 Nov 2022 |
GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022) |
50,963 |
Yes |
Yes |
1,3,4,7,8 & 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00662 |
15 MW Solar Power Project in Telangana by Tata Power |
India |
5 Dec 2022 - 19 Dec 2022 |
AMS I.D- Grid Connected Renewable electricity Generation-Version 18.0 |
27025 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00202 |
Çiftay-3 Solar Power Plant Bundle |
Türkiye |
26 Apr 2022 - 10 May 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
92,177 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00200 |
Renewable wind power project in India -1- 009 |
India |
24 Apr 2022 - 8 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
602,415 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00267 |
VSP BINH THUAN II SOLAR POWER PROJECT |
Viet Nam |
24 Jul 2022 - 7 Aug 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0 |
45,934.1 tCO2/year |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00807 |
4.5 MW Power Project in Madhya Pradesh |
India |
10 Jan 2023 - 24 Jan 2023 |
AMS-I.D.: - Grid connected renewable electricity generation – Version 18 |
9,536 |
Yes |
Yes |
1,5,7,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00906 |
Bundled Wind Power Project in Tamilnadu, coordinated by VEC-003 |
India |
5 Mar 2023 - 19 Mar 2023 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
46,473 |
Yes |
Yes |
1,7,8,9,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00418 |
Tailai Guangyuan Daxin 49.5MW Grid Connected Wind Power Generation Project |
China |
26 Sep 2022 - 10 Oct 2022 |
Applied methodologies (Shall be approved by the GCC or the CDM) ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
92,876 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00366 |
100 MW Solar Project in Raghanesda, Gujarat |
India |
13 Sep 2022 - 27 Sep 2022 |
ACM0002- Grid-connected electricity generation from renewable sources, Version -20 |
229,078 |
Yes |
Yes |
SDG 9,SDG 8,SDG 7,SDG 5, SDG 3,SDG 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00910 |
SOLAR POWER PROJECT BY SUNSOURCE PVT.LTD. BUNDLE - 5 |
India |
6 Mar 2023 - 20 Mar 2023 |
AMS-I.F.: Renewable electricity generation for captive use and mini-grid --- Version 5.0 |
9,025 |
Yes |
Yes |
7,8 & 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00737 |
302.9 MW Wind Project by Torrent Power Limited |
India |
19 Dec 2022 - 2 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources ---Version 20.02 |
567,868 |
Yes |
Yes |
4,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00611 |
Ia Pet Dak Doa Wind Power Plant No. 1&2 |
Viet Nam |
20 Nov 2022 - 4 Dec 2022 |
ACM0002 v20.0 |
456,449 |
Yes |
Yes |
#3, #7, #8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00342 |
110 MW Solar Energy Project in Noorsar |
India |
8 Sep 2022 - 22 Sep 2022 |
ACM0002- Grid-connected electricity generation from renewable sources, Version -20 |
2,45,382 |
Yes |
Yes |
SDG 9,SDG 8,SDG 7,SDG 5, SDG 3,SDG 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00408 |
Momentum Enerji Solar Power Projects Bundle 2 |
Türkiye |
25 Sep 2022 - 9 Oct 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
15,098 tCO2/year |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00882 |
56 MW Kawas Solar PV Project |
India |
16 Feb 2023 - 2 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-20.0 |
122071 |
Yes |
Yes |
SDG1, SDG7, SDG8, SDG13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00730 |
50.4 MW Wind Power Project by National Aluminium Company Limited in Maharashtra, India |
India |
14 Dec 2022 - 28 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
93,790 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00542 |
Biomass thermal project in India (005) |
India |
23 Oct 2022 - 6 Nov 2022 |
AMS I.C: Thermal Energy Production with or without electricity -version 22.0 |
16254 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00479 |
100 MW solar project in Karnataka |
India |
6 Oct 2022 - 20 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
193528 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00405 |
Solar power project owned by Maharashtra Seamless Limited |
India |
25 Sep 2022 - 9 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources Version 20 |
79881 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00761 |
126 MW Wind Project |
India |
26 Dec 2022 - 9 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 21.0 |
180,760 |
Yes |
Yes |
4,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00265 |
Çalıkobası Regulator and Hydro Power Plant |
Türkiye |
21 Jul 2022 - 4 Aug 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
24,153 |
Yes |
Yes |
7,8,11 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00780 |
Solar Power Project in Andhra Pradesh, India by UEPL |
India |
4 Jan 2023 - 18 Jan 2023 |
AMS I.D. - Grid connected renewable electricity generation - Version 18.0 |
15,997 |
Yes |
Yes |
SDG#1, SDG#5,SDG#7,SDG#8,SDG#9,SDG#13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00762 |
27.3 MW Wind Power Project in Gujarat, India by KRBL Limited |
India |
26 Dec 2022 - 9 Jan 2023 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
71,988 |
Yes |
Yes |
SDG # 5,SDG # 7,SDG # 8,SDG # 9, SDG #13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00141 |
Renewable wind power project by Hi-Tech Systems and Services Limited |
India |
27 Mar 2022 - 10 Apr 2022 |
AMS-I.D.: - Grid connected renewable electricity generation - Version 18 |
29,955 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00048 |
Solar project in Andhra Pradesh by IndiGrid |
India |
15 Dec 2021 - 29 Dec 2021 |
GCCM001 Version 2.0 /ACM0002 Version 20.0 |
188926 |
Yes |
Yes |
SDG1, SDG5, SDG7, SDG8, SDG9 |
Diamond |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00409 |
Wind Energy Project in Kutch, Gujarat |
India |
25 Sep 2022 - 9 Oct 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, Ver 03.0 |
729,531 |
Yes |
Yes |
3, 5, 7, 8, 9 & 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00207 |
Hongda Zhongyuan Ordos City Hangjinqi 30MW Solar Power Project |
China |
28 Apr 2022 - 12 May 2022 |
ACM0002 version20.0 |
38,883 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00315 |
Susuz Regulator and Hydroelectric Power Plant (Susuz HEPP) |
Türkiye |
18 Aug 2022 - 1 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.00 |
9,945 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00487 |
Hacı Bey Wind Power Plant |
Türkiye |
6 Oct 2022 - 20 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources– Version 20.0 |
121,208 |
Yes |
Yes |
SDG 4, 5, 7, 8, 9, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00605 |
Bundle Solar Power Project in Maharashtra by Clean Science and Technology Limited |
India |
20 Nov 2022 - 4 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
11,631 |
Yes |
Yes |
4,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00752 |
6.8 MW Bundled Wind Power Project in Gujarat |
India |
22 Dec 2022 - 5 Jan 2023 |
AMS-I.D.: - Grid connected renewable electricity generation - Version 18.0 |
13,579 |
Yes |
Yes |
1,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00791 |
CLEANERGY WIND BUNDLE 2018 BY ENERGY ADVISORY SERVICES |
India |
5 Jan 2023 - 19 Jan 2023 |
AMS-1.D, Version 18.0 |
22631 |
Yes |
Yes |
1,7,8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00413 |
Gazi-Sakarbayır Wind Power Plant Bundle |
Türkiye |
25 Sep 2022 - 9 Oct 2022 |
CDM approved consolidated Methodology ACM0002 (Version 20.0) |
57,675 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG11, SDG13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00452 |
Alares-2 Wind Power Plant |
Türkiye |
2 Oct 2022 - 16 Oct 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources – Version 20.0 |
41,234 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00309 |
Karaman-Cumra SPP |
Türkiye |
14 Aug 2022 - 28 Aug 2022 |
ACM0002 Version 20 |
32,105 |
Yes |
Yes |
6,7,11 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00689 |
Aluform Bundle SPP |
Türkiye |
6 Dec 2022 - 20 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
7,393 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00648 |
BT1 Windfarm |
Viet Nam |
28 Nov 2022 - 12 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources (Version 20.0) |
220323 |
Yes |
Yes |
1, 7, 8, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00649 |
120 MW Wind Project in Karnataka |
India |
28 Nov 2022 - 12 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
305,180 |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00037 |
300 MW Thar Solar Project in Rajasthan |
India |
7 Dec 2021 - 21 Dec 2021 |
GCCM001 Version 3.0 |
628930 |
Yes |
Yes |
SDG 7, SDG 8 |
Silver |
CORSIA(C+) |
REGISTERED |
S00017 |
Wind Farm Kosava-I phase 69MW in Serbia |
Serbia |
6 Oct 2021 - 20 Oct 2021 |
GCCM001 v2.0 - Methodology for Grid Connected Renewable Energy Generation Projects |
194,277 |
Yes |
Yes |
SDG#7;SDG#8;SDG#9 |
Gold |
CORSIA(C+) |
REGISTERED |
S00805 |
Solar PV based power generation project in Telangana by Shalaka Infra Tech |
India |
8 Jan 2023 - 22 Jan 2023 |
ACM0002. - Grid-connected electricity generation from renewable sources (Version 21.0) |
24,520 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00830 |
Ventos de São Clemente Wind Complex |
Brazil |
17 Jan 2023 - 31 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 21.0 |
494,474 |
Yes |
Yes |
7, 8, 9 and 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00238 |
50 MWac Paryapt Solar PV project |
India |
25 May 2022 - 8 Jun 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, version 3.0 |
90,067 |
Yes |
Yes |
9,8 and 7 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00002 |
Ova Hydro Power Plant Power Plant |
Türkiye |
12 Oct 2020 - 26 Oct 2020 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
24,287 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
REGISTERED |
S00222 |
15MW Paddy Straw Based Biomass Project by Hind Samachar Limited in Kurukshetra, Haryana, India |
India |
16 May 2022 - 30 May 2022 |
AMS I.D. Version 18 |
82444 |
Yes |
Yes |
1,3,5,7 and 8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00018 |
Yunnan Huize Cangfang Wind Power Project |
China |
12 Oct 2021 - 26 Oct 2021 |
GCCM001 v3.0 |
74,008 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
REGISTERED |
S00352 |
Akdağ Wind Power Plant |
Türkiye |
11 Sep 2022 - 25 Sep 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
43,154 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00098 |
10.633 MW bundled rooftop solar power project by SAEL Limited. |
India |
13 Feb 2022 - 27 Feb 2022 |
AMS I F, Version 3.0 |
15418 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
REGISTERED |
S00473 |
Yozgat Landfill Gas to Electricity Project |
Türkiye |
5 Oct 2022 - 19 Oct 2022 |
AMS-III.G: “Landfill methane recovery” Version 10.0 ; AMS-I.D: “Grid connected renewable electricity generation” Version 18.0 |
25,763 |
Yes |
Yes |
7,8,9,11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00471 |
Eskişehir Landfill Gas to Electricity Project |
Türkiye |
5 Oct 2022 - 19 Oct 2022 |
ACM0001: Flaring or use of landfill gas - Version 19.0 ; ACM0022: Alternative waste treatment processes - Version 3.0 |
123,211 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00363 |
Benban Solar Park Bundled Project 3 |
Egypt |
12 Sep 2022 - 26 Sep 2022 |
GCCM001 “Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers” -Version 3.0 |
288,231 tCO2/year |
Yes |
Yes |
SDG7, SDG8, SDG9, SDG11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00304 |
6 MW wind by Orchid Laminates Private Limited |
India |
11 Aug 2022 - 25 Aug 2022 |
AMS I.D- Grid Connected Renewable electricity Generation-Version 18.0 |
15650 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00006 |
Water pumps energy saving through wetland treatment solution at Oman |
Oman |
21 May 2021 - 4 Jun 2021 |
GCCM002 v1.0 –Methodology for Energy Efficient Pumping Projects |
100,166 |
Yes |
Yes |
6,7,8,12,13,15 |
Diamond |
CORSIA(C+) |
REGISTERED |
S00388 |
Maydem Solar Power Plant Bundle |
Türkiye |
20 Sep 2022 - 4 Oct 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
10,993 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00031 |
Sucatagi Solar Power Plant Bundle |
Türkiye |
30 Nov 2021 - 14 Dec 2021 |
AMS-I.D.: Grid connected renewable electricity generation---Version 18.0 |
8300 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
REGISTERED |
S00250 |
8 WM WIND POWER PROJECT BY AMARJOTHI SPINNING MILLS LIMITED |
India |
9 Jun 2022 - 23 Jun 2022 |
AMS- I.D:Grid connected renewable electricity generation”- Version 18.0 |
16302 |
Yes |
Yes |
SDG 3, SDG 7, SDG 8, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00334 |
Küçükköy Solar Power Plant |
Türkiye |
7 Sep 2022 - 21 Sep 2022 |
CDM approved consolidated Methodology ACM0002 (Version 20.0) |
31,409 |
Yes |
Yes |
SDG 6,SDG 7,SDG 8,SDG 9,SDG 11,SDG 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00100 |
7.5MW(AC) grid connected canal top solar PV power plant by CSEPL in Patiala district of Punjab,India |
India |
13 Feb 2022 - 27 Feb 2022 |
AMS I D, Version 18.0 |
11831 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
REGISTERED |
S00115 |
First Large-Scale Solar PV Plant in Uzbekistan by Nur Navoi Solar FE LLC |
Uzbekistan |
27 Feb 2022 - 13 Mar 2022 |
GCCMOO1 v4.0 |
151,929 |
Yes |
Yes |
SDG 7, SDG 8, SDG9 |
Gold |
CORSIA(C+) |
REGISTERED |
S00765 |
Renewable Green Power Project-India |
India |
28 Dec 2022 - 11 Jan 2023 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
11,404 |
Yes |
Yes |
SDG 07, SDG 08 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00390 |
Okkayası Regulator and Şehitlik Hydroelectric Power Plant |
Türkiye |
20 Sep 2022 - 4 Oct 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
32,427 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00464 |
Solar PV Project by Lilyum |
Türkiye |
2 Oct 2022 - 16 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
21,642 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00137 |
MASFEN-3 Solar Bundle |
Türkiye |
24 Mar 2022 - 7 Apr 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
18,166 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
GCC ASSESMENT |
S00538 |
2 MW Solar Power Project in Rajasthan |
India |
23 Oct 2022 - 6 Nov 2022 |
AMD ID (Version-18) |
1903 |
Yes |
Yes |
1,7,8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00540 |
Ülkün-2 HPP |
Türkiye |
23 Oct 2022 - 6 Nov 2022 |
CDM Approved AMS-I.D. Grid-connected renewable electricity generation, version 18.0 |
9437 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00280 |
4 MW Hydro Project in Sardi Khola, Nepal |
Nepal |
31 Jul 2022 - 14 Aug 2022 |
CDM Methodology: AMS – 1.D Grid connected renewable electricity generation (ver - 18) |
5,790 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00395 |
Carhuac HPP |
Peru |
21 Sep 2022 - 5 Oct 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources – Version 20.0 |
49,877 |
Yes |
Yes |
3, 4, 7, 8, 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00111 |
SEFERIHISAR WPP |
Türkiye |
20 Feb 2022 - 6 Mar 2022 |
ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 20 |
31796 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
GCC ASSESMENT |
S00027 |
Solar Power Project in Bikaner Rajasthan by Avaada Sunce Energy |
India |
18 Nov 2021 - 2 Dec 2021 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
663,529 |
Yes |
Yes |
Goals 3, 4, 5, 6, 7, 8, 13,15 |
Diamond |
CORSIA(C+) |
GCC ASSESMENT |
S00556 |
Parque Punta Sierra Wind Farm Project |
Chile |
27 Oct 2022 - 10 Nov 2022 |
ACM0002 version20.0 |
138,123 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00541 |
111.776 MWp bundled solar power project in Vietnam |
Viet Nam |
23 Oct 2022 - 6 Nov 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
147940 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00025 |
Solar Power Project in Surendranagar, Gujarat by Avaada Sunrise Energy |
India |
10 Nov 2021 - 24 Nov 2021 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
568,739 |
Yes |
Yes |
Goals 3, 4, 6, 7, 8, 13 |
Diamond |
CORSIA(C+) |
GCC ASSESMENT |
S00566 |
10 MW BUNDLED WIND POWER PROJECT IN TAMILNADU |
India |
31 Oct 2022 - 14 Nov 2022 |
AMS- I.D:Grid connected renewable electricity generation”- Version 18.0 |
20,042 |
Yes |
Yes |
SDG 7, SDG 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00045 |
Bereketli Wind Power Project |
Türkiye |
14 Dec 2021 - 28 Dec 2021 |
ACM0002 Grid-connected electricity generation from renewable sources, ver: 20.0 |
57660 |
Yes |
Yes |
6,7,11 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00482 |
16 MW Minh Luong Thuong Hydropower Plant |
Viet Nam |
6 Oct 2022 - 20 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
45092 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00758 |
120 MW Vyasi Hydro Power Project by UJVN Limited |
India |
26 Dec 2022 - 9 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
337,607 |
Yes |
Yes |
1,4,5,7,8,9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00063 |
Solar Power Project in Sirsa, Haryana by Avaada Green HNProject |
India |
10 Jan 2022 - 24 Jan 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
92,199 tCO2e |
Yes |
Yes |
Goals 3, 4, 6, 7, 8, 13 |
Diamond |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00157 |
Toroslar Bundled SPP |
Türkiye |
5 Apr 2022 - 19 Apr 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
13,184 |
Yes |
Yes |
7, 8, |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00223 |
Makascı-5 Solar Power Plant Bundle |
Türkiye |
17 May 2022 - 31 May 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
17,409 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00572 |
11 MW Solar Power Project by SECI |
India |
3 Nov 2022 - 17 Nov 2022 |
AMS I.D- Grid Connected Renewable electricity Generation-Version 18.0 |
18,160 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00622 |
300 MW Grid Connected Solar PV project by Adyah Solar Energy in Karnataka, India |
India |
22 Nov 2022 - 6 Dec 2022 |
ACM 0002, Version 20 |
627542 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00416 |
100 MW Solar Power Project by KRRSPL |
India |
26 Sep 2022 - 10 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
1,77,335 tCO2e |
Yes |
Yes |
1, 3, 4, 5, 7, 8, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00764 |
5.36 MW Bundle Project by Sangam Rooftop Solar Private Limited |
India |
26 Dec 2022 - 9 Jan 2023 |
AMS-I.D: Grid connected renewable electricity generation -Version 18.0 |
6,466 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00224 |
Makascı-9 Solar Power Plant Bundle |
Türkiye |
17 May 2022 - 31 May 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
15,949 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00227 |
Makascı-4 Solar Power Plant Bundle |
Türkiye |
18 May 2022 - 1 Jun 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
16,147 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00795 |
V1-2 Wind Power Project in Vietnam |
Viet Nam |
5 Jan 2023 - 19 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
133670 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00831 |
Rio do Vento Complex Project |
Brazil |
19 Jan 2023 - 2 Feb 2023 |
ACM0002 – Grid-connected electricity generation from renewable sources V20.0 |
918498 |
Yes |
Yes |
1, 7, 8, 9, 10, 11 and 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00914 |
SP INFRA 1 Solar Power Project |
Viet Nam |
6 Mar 2023 - 20 Mar 2023 |
ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0 |
71,931 |
Yes |
Yes |
5,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00313 |
8 MW Biomass based power project by Indeen Biopower Limited in Rajasthan, India |
India |
17 Aug 2022 - 31 Aug 2022 |
AMS.I.D.: Grid Connected Renewable Electricity Generation – Version 18.0 |
44,831 |
Yes |
Yes |
1,3,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00696 |
Tengchong Dapingtian Hydropower Project |
China |
8 Dec 2022 - 22 Dec 2022 |
ACM0002 version20.0 |
180,536 |
Yes |
Yes |
#7, #8, #9,#13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00243 |
300 MW Bundled Solar Power Project in Vietnam |
Viet Nam |
2 Jun 2022 - 16 Jun 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
368583 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00697 |
Ahat Ayvalı Göğem Solar Power Plant Bundle |
Türkiye |
8 Dec 2022 - 22 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
51,172 |
Yes |
Yes |
SDGs 6, 7, 8, 9, 11, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00481 |
16 MW Muong Bang Hydropower Plant |
Viet Nam |
6 Oct 2022 - 20 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
43841 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00076 |
Gökzirve Wind Power Project |
Türkiye |
20 Jan 2022 - 3 Feb 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
57,224 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00801 |
Celebi SPP |
Türkiye |
5 Jan 2023 - 19 Jan 2023 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
19,267 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00636 |
8 MW Hydro Project, Kerala |
India |
28 Nov 2022 - 12 Dec 2022 |
AMS-1.D- Grid connected renewable electricity Generation, Version -18 |
25,141 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00809 |
50 MW Wind Power Project by National Aluminium Company Limited in Rajasthan, India |
India |
10 Jan 2023 - 24 Jan 2023 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
97,121 |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00249 |
Hacom Solar Power Project |
Viet Nam |
8 Jun 2022 - 22 Jun 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0 |
67564 |
Yes |
Yes |
5.7.8.9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00786 |
7.5 MW Biomass Based Project by MSR Mega Bio Power Limited in Warangal, Telangana, India |
India |
4 Jan 2023 - 18 Jan 2023 |
AMS.I.D-Grid Connected Renewable Electricity Generation – Version 18 |
42,037 |
Yes |
Yes |
SDG 07, SDG 08 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00834 |
Bundle 3 Solar power project in India |
India |
19 Jan 2023 - 2 Feb 2023 |
GCCM001: Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers |
40,380 |
Yes |
Yes |
5,7,8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00260 |
AMPSOLAR SYSTEMS PRIVATE LIMITED |
India |
3 Jul 2022 - 17 Jul 2022 |
AMS-I.D. Grid connected renewable electricity generation ; Version 18.0 |
19,842 tCO2e |
Yes |
Yes |
SDG 7, 13 |
Bronze |
CORSIA(C+) |
VERIFICATION |
S00300 |
8.4 MW Wind Power Project in Kutch, Gujarat |
India |
10 Aug 2022 - 24 Aug 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers & version 3.0 |
19,172 |
Yes |
Yes |
SDG 5,7,8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00578 |
Jiaxian Fangta 50MW Wind Power Project |
China |
6 Nov 2022 - 20 Nov 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
80,896 |
Yes |
Yes |
SDG #7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00783 |
Van Giao Solar Power 1 and Van Giao Solar Power 2 |
Viet Nam |
4 Jan 2023 - 18 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 21.0 |
105,988 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00121 |
Renewable Solar Power Project in Sinanpaşa, Afyon |
Türkiye |
2 Mar 2022 - 16 Mar 2022 |
AMS-I.D.: Grid Connected Renewable Electricity Generation --- Version 18.0 |
13.417 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00515 |
ComBio Renewable Energy in Angatuba |
Brazil |
16 Oct 2022 - 30 Oct 2022 |
AM0036 - Use of biomass in heat generation equipment version 07.0 |
77.179 |
Yes |
Yes |
7, 9 and 12 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00748 |
Çekerek Hydro Power Plant |
Türkiye |
21 Dec 2022 - 4 Jan 2023 |
ACM0002: Grid-connected electricity generation from renewable sources– Version 21.0 |
48,117 |
Yes |
Yes |
4, 5, 7, 8, 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00252 |
Serum group Wind power project in Karnataka |
India |
14 Jun 2022 - 28 Jun 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
29,955 |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00259 |
Kaskelen 50 MWp Solar Power Plant |
China |
3 Jul 2022 - 17 Jul 2022 |
GCCM001 v3.0 |
46,954 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00612 |
SERTAO and SOBRAL I Solar PV Project by GPG NATURGY |
Brazil |
20 Nov 2022 - 4 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
51,391 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00912 |
M. Hanumantha Rao bundle by Energy Advisory Services |
India |
6 Mar 2023 - 20 Mar 2023 |
AMS-1.D, Version 18.0 |
11816 |
Yes |
Yes |
SDG 7,8,11,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00747 |
Tiantangshan 50MW wind power generation project |
China |
21 Dec 2022 - 4 Jan 2023 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, V3.0 |
79,413 |
Yes |
Yes |
7, 8, 9, |
Gold |
CORSIA(C+) |
VERIFICATION |
S00754 |
Biomass based steam generation plant |
India |
22 Dec 2022 - 5 Jan 2023 |
AMS-I.C: Thermal energy production with or without electricity- Version 22.0 |
40338 |
Yes |
Yes |
SDG 3, SDG7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00429 |
250 MW Grid Connected Solar PV project at Ananthapuramu Solar Park, AP, India by Ayana |
India |
27 Sep 2022 - 11 Oct 2022 |
ACM 0002, Version 20 |
412686 |
Yes |
Yes |
1,5,7,8,9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00425 |
Xinjiang Hami Wind Power Base Phase II Southeast Wind Zone Jingxia 5A Wind Farm 300MW Project |
China |
27 Sep 2022 - 11 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources” (Version 20.0) |
564,287 |
Yes |
Yes |
#7,#8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00269 |
Gonghe 100 MW Wind Power Project |
China |
26 Jul 2022 - 9 Aug 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
137,166 |
Yes |
Yes |
SDG #7,# 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00698 |
Ecogreen Bundle SPP Project-1 |
Türkiye |
11 Dec 2022 - 25 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
15,719 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00699 |
Wind Energy Project in Kutch, Gujarat-3 |
India |
11 Dec 2022 - 25 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
518,212 |
Yes |
Yes |
3, 5, 7, 8, 9 & 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00700 |
Denizli Biomass Power Project |
Türkiye |
11 Dec 2022 - 25 Dec 2022 |
ACM0010 Version 8.0 |
93069 |
Yes |
Yes |
SDG 4, SDG 5, SDG 7, SDG 9, SDG 12 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00256 |
Saha Solar Power Plant Bundle |
Türkiye |
29 Jun 2022 - 13 Jul 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
29,027 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00317 |
1.99MW Biomass Cogeneration project by Sagar Nutriments Private Limited in Madhya Pradesh, India |
India |
18 Aug 2022 - 1 Sep 2022 |
AMS.I.C.: Thermal energy production with or without electricity - Version 22.0 |
49,116 |
Yes |
Yes |
1,3,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00272 |
Kürekdağı WPP |
Türkiye |
27 Jul 2022 - 10 Aug 2022 |
ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 20 |
73814 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00204 |
Watabak Wind Power Project |
Thailand |
27 Apr 2022 - 11 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
103214 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00258 |
10TPH Biomass boiler project by Sagar Nutriments Private Limited in Madhya Pradesh, India |
India |
3 Jul 2022 - 17 Jul 2022 |
AMS.I.C.: Thermal energy production with or without electricity - Version 22.0 |
23,749 |
Yes |
Yes |
1,3,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00586 |
4 MW Hydro Project by Laxmi Organic |
India |
10 Nov 2022 - 24 Nov 2022 |
AMS – 1.D Grid connected renewable electricity generation (Version 18) |
10,115 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13, |
Gold |
CORSIA(C+) |
VERIFICATION |
S00247 |
Poonawalla Group Wind power project in Karnataka |
India |
6 Jun 2022 - 20 Jun 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
29,955 tCO2e |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
GCC ASSESMENT |
S00209 |
Renewable wind power project in India -1- 006 |
India |
11 May 2022 - 25 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
189,103 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00424 |
Solar Power Project by ES Sun Power |
India |
26 Sep 2022 - 10 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources ; Version 20.0 |
33,176 |
Yes |
Yes |
SDG 7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00650 |
Xixian New Area Municipal Solid Waste Innocent Treatment Project |
China |
28 Nov 2022 - 12 Dec 2022 |
ACM0022 Version03.0 |
304,569 |
Yes |
Yes |
#7,#8,#9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00519 |
UAE Wind Program – Phase 1 |
United Arab Emirates |
19 Oct 2022 - 2 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
106,739 |
Yes |
Yes |
7,8,9 and 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00244 |
ComBio Renewable Biomass Project - Alumínio |
Brazil |
2 Jun 2022 - 16 Jun 2022 |
AM0036 - Use of biomass in heat generation equipment version 07.0 |
241,831 |
Yes |
Yes |
7, 9 and 12 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00893 |
10 MW Biomass based Captive Cogeneration Project at Kharagpur, West Bengal |
India |
20 Feb 2023 - 6 Mar 2023 |
ACM0006 Large-Scale Consolidated Methodology Electricity and heat generation from biomass [Version: 16.0] |
184,019 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00582 |
4.6 MW capacity biomass based captive power project in Dabwali Road, Bathinda, Punjab, India |
India |
8 Nov 2022 - 22 Nov 2022 |
AMS-I.C.: Thermal energy production with or without electricity (Version 22.0) |
51,719 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00704 |
Loc Ninh 4 Solar Farm |
Viet Nam |
11 Dec 2022 - 25 Dec 2022 |
ACM0002 v20.0 |
268,327 |
Yes |
Yes |
#3, #7, #8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00848 |
Amaccao Quang Tri 1 Wind Power Project |
Viet Nam |
26 Jan 2023 - 9 Feb 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
134823 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00299 |
Jinshui River Stage 3 Hydropower Plant |
China |
10 Aug 2022 - 24 Aug 2022 |
Large-scale Consolidated Methodology for Grid-connected electricity generation from renewable sources (ACM0002 v20.0) |
100,226 |
Yes |
Yes |
#7,#8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00658 |
Yunnan Weixi Daqiaohe Hydro Power Project |
China |
30 Nov 2022 - 14 Dec 2022 |
ACM0002 & v20.0 |
41,204 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00817 |
Köroğlu Dam and Kotanlı Hydroelectric Power Plant |
Türkiye |
12 Jan 2023 - 26 Jan 2023 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
137,232 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00312 |
Bundled Solar Power Project 1 by Elestaş Enerji |
Türkiye |
15 Aug 2022 - 29 Aug 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
14,908 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00001 |
Alibey WPP |
Türkiye |
20 Sep 2020 - 4 Oct 2020 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
57,952 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
REGISTERED |
S00162 |
Soma WPP Capacity Addition Project |
Türkiye |
7 Apr 2022 - 21 Apr 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
75,904 |
Yes |
Yes |
4, 6, 7, 8, 9, 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00318 |
Solar Power Project by Athena Group |
India |
22 Aug 2022 - 5 Sep 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
468,248 tCO2e |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00191 |
Çiftay-1 Solar Power Plant Bundle |
Türkiye |
24 Apr 2022 - 8 May 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
16,639 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00647 |
Kubilay Geothermal Power Plant Project |
Türkiye |
28 Nov 2022 - 12 Dec 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0 |
91,288 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00735 |
4.5 MW Kaliganga-II Small Hydro Project by UJVN Limited |
India |
15 Dec 2022 - 29 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
25,846 |
Yes |
Yes |
1,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00192 |
Çiftay-2 Solar Power Plant Bundle |
Türkiye |
24 Apr 2022 - 8 May 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
47,019 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00030 |
Göktepe WPP |
Türkiye |
21 Nov 2021 - 5 Dec 2021 |
ACM0002 ver.20 |
168,754 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00316 |
15 MW Solar Energy Project by Sunfree in Mizoram, India |
India |
18 Aug 2022 - 1 Sep 2022 |
ACM 0002, Version 20 |
29011 |
Yes |
Yes |
1,5,7,8,9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00237 |
Kirazlıköprü Dam and Hydroelectric Power Plant |
Türkiye |
25 May 2022 - 8 Jun 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
25,278 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00320 |
Bundled Solar Power Project 1 By Fiba Yenilenebilir Enerji |
Türkiye |
24 Aug 2022 - 7 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
12,589 |
Yes |
Yes |
SDG 13, SDG 5, SDG 7, SDG 8, SDG 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00514 |
Bundled solar project in Uttarakhand |
India |
16 Oct 2022 - 30 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
60,620 |
Yes |
Yes |
3,4,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00746 |
8 MW Bundled Solar Power Project in Maharashtra |
India |
20 Dec 2022 - 3 Jan 2023 |
AMS-I.D.: - Grid connected renewable electricity generation - Version 18.0 |
12,389 |
Yes |
Yes |
1,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00281 |
Renewable energy project in Rajasthan by ABC Renewable Energy Pvt. Ltd. |
India |
31 Jul 2022 - 14 Aug 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
523,907 |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00822 |
EnergySolar |
Ukraine |
16 Jan 2023 - 30 Jan 2023 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers V4.0 - 2022 |
445,268 |
Yes |
Yes |
7, 8, 13 |
Silver |
N/A |
VERIFICATION |
S00632 |
Bundled Solar Power Project 1 by STC Elektronik |
Türkiye |
24 Nov 2022 - 8 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
16,470 |
Yes |
Yes |
SDG 7, SDG 8, |
Silver |
CORSIA(C+) |
VERIFICATION |
S00682 |
Etab Enerji Bitlis LFG Power Plant |
Türkiye |
6 Dec 2022 - 20 Dec 2022 |
ACM0001 version 19.0 |
27,764 |
Yes |
Yes |
7,8 and 12 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00271 |
Dereköy Regulator and Hydro Power Plant |
Türkiye |
27 Jul 2022 - 10 Aug 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
6818 |
Yes |
Yes |
4,7,8,9, 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00768 |
Vinh Hao 4 Solar Power project in Vietnam |
Viet Nam |
28 Dec 2022 - 11 Jan 2023 |
ACM0002,Version 20.0 |
51,337 |
Yes |
Yes |
1, 5, 7, 8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00787 |
Renewable Solar Power Project by Green Urja Private Limited. |
India |
4 Jan 2023 - 18 Jan 2023 |
CDM approved consolidated Methodology- ACM0002 (Version 20.0) |
49,041 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00763 |
Renewable Solar Power Project by OPG Power Generation Private Limited |
India |
26 Dec 2022 - 9 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 21.0 |
98,905 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00421 |
BALIKLI I-II-III HYDRO POWER PLANT |
Türkiye |
26 Sep 2022 - 10 Oct 2022 |
AMS-I.D, V18.0 |
15670 |
Yes |
Yes |
SDG#3, SDG#7, SDG#8, SDG#9, SDG#11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00353 |
Bundled Wind Power Project By Fiba Yenilenebilir Enerji |
Türkiye |
11 Sep 2022 - 25 Sep 2022 |
ACM 0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
213,257 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00221 |
150 MW Solar Power Project by Hong Phong 1 Energy Joint Stock Company |
Viet Nam |
16 May 2022 - 30 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
237669 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00228 |
Makascı-7 Solar Power Plant Bundle |
Türkiye |
18 May 2022 - 1 Jun 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
15,932 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00253 |
Hasanbeyli Bundled SPP |
Türkiye |
21 Jun 2022 - 5 Jul 2022 |
AMS-I.D: Grid connected renewable electricity generation, Version 18.0 |
13,991 |
Yes |
Yes |
6, 7, 8, 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00545 |
9MW Hydro Power Project by PT. Seluma Clean Energy at North Sumatera, Indonesia |
Indonesia |
24 Oct 2022 - 7 Nov 2022 |
AMS I D: Grid Connected renewable electricity generation -Version 18.0 |
39,593 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00292 |
Renewable wind power project in India -1- 017 |
India |
7 Aug 2022 - 21 Aug 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
926,789 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00741 |
Guangzhou Xingfeng Landfill Gas for Power Generation Project |
China |
19 Dec 2022 - 2 Jan 2023 |
ACM0001 Version 19.0 |
85,110 |
Yes |
Yes |
#7, #8,#9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00266 |
Solar rooftop Projects 2 by fourth partner |
India |
24 Jul 2022 - 7 Aug 2022 |
AMS-I.F. - Renewable electricity generation for captive use and mini-grid (version 04.0) |
17,962 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00174 |
CIBUK I Wind Farm |
Serbia |
14 Apr 2022 - 28 Apr 2022 |
GCCM001 V3.0 - Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers |
402,765 |
Yes |
Yes |
SDG#7;SDG#8;SDG#9; ;SDG#13 |
Gold |
CORSIA(C+) |
REGISTERED |
S00254 |
Kayseri OSB SPP |
Türkiye |
23 Jun 2022 - 7 Jul 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
36,157 |
Yes |
Yes |
6, 7, 8, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00411 |
Energy saving through installation of LED lighting systems by SDMC, New Delhi, India |
India |
25 Sep 2022 - 9 Oct 2022 |
AMS II.L |
16353 |
Yes |
Yes |
1,5,8,11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00153 |
Topçam Dam and Hydro Power Plant |
Türkiye |
3 Apr 2022 - 17 Apr 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
111,040 |
Yes |
Yes |
SDG4, SDG 7, SDG 8, SDG 9 |
Platinum |
CORSIA(C+) |
GCC ASSESMENT |
S00264 |
Renewable wind power project in India -1- 010 |
India |
21 Jul 2022 - 4 Aug 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
219,837 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00123 |
38 MW Wind Power Project of Four EF Renewables Private Limited |
India |
6 Mar 2022 - 20 Mar 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
129,233 |
Yes |
Yes |
SDG 7,8, and 13 |
Silver |
CORSIA(C+) |
GCC ASSESMENT |
S00310 |
Evrencik WPP |
Türkiye |
15 Aug 2022 - 29 Aug 2022 |
CDM Approved ACM0002 Grid-connected electricity generation from renewable sources, version 20.0 |
278,726 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00346 |
300 MW solar power project in Dholera, Gujarat |
India |
8 Sep 2022 - 22 Sep 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
651,811 |
Yes |
Yes |
SDG 3, SDG 5,SDG 7,SDG 8, SDG 9, SDG 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00907 |
125 MW solar project at Shajapur District, Madhya Pradesh |
India |
5 Mar 2023 - 19 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
285,444 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00288 |
Renewable Power Project in Jaisalmer, Rajasthan-2 |
India |
3 Aug 2022 - 17 Aug 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, Ver 03.0 |
3,037,864 |
Yes |
Yes |
3, 5, 7, 8, 9 & 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00284 |
Hanbaram Wind Power Plant |
Viet Nam |
1 Aug 2022 - 15 Aug 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
268362 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00495 |
Bengbu Municipal Solid Waste Incineration Power Plant Project |
China |
9 Oct 2022 - 23 Oct 2022 |
ACM0022: “Alternative waste treatment processes”(Version 3.0) |
153721.42 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00626 |
Renewable Wind Power Project in Gujarat by CGEIPL 4 |
India |
23 Nov 2022 - 7 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
491,436 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00282 |
Renewable Power Project by RDPL |
India |
1 Aug 2022 - 15 Aug 2022 |
ACM0002--Grid-connected electricity generation from renewable sources- Version 20.0 |
29344 |
Yes |
Yes |
3,4,5,6,7,8,15 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00022 |
CTGR Keyouqianqi Solar Power Generation Project |
China |
27 Oct 2021 - 10 Nov 2021 |
ACM0002 version20.0 |
93,377 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00181 |
Renewable wind power project in India -1- 012 |
India |
19 Apr 2022 - 3 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
630,111 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00201 |
Renewable wind power project in India -1- 015 |
India |
24 Apr 2022 - 8 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
275,509 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00078 |
Ebru Regulators and Hydro Power Plant |
Türkiye |
23 Jan 2022 - 6 Feb 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
40,318 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00790 |
Bundled Wind Power Project in Tamilnadu, coordinated by VEC-004 |
India |
5 Jan 2023 - 19 Jan 2023 |
AMS I.D. Grid connected renewable electricity generation--- Version 18.0 |
27,884 |
Yes |
Yes |
1,7,8,9,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00206 |
Renewable wind power project in India -1- 004 |
India |
28 Apr 2022 - 12 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
706,493 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00337 |
Bundled Wind Power Project in Madhya Pradesh and Andhra Pradesh |
India |
7 Sep 2022 - 21 Sep 2022 |
AMS I.D Version 18 (Grid connected renewable electricity generation)2. |
27,173 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00382 |
Orhanlı Wind Power Project by Elestaş Enerji |
Türkiye |
15 Sep 2022 - 29 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
19,445 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00383 |
Bundled Solar Power Project 1 by Aloha Turistik Hizmetler A.Ş. |
Türkiye |
15 Sep 2022 - 29 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0. |
14,256 |
Yes |
Yes |
5,7,8,9,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00574 |
MSW plant by Ujjain Waste Management Pvt. Ltd. |
India |
6 Nov 2022 - 20 Nov 2022 |
AMS III.F.: Avoidance of methane emissions through composting - Version 12.0 |
56,816 |
Yes |
Yes |
SDG 3, SDG 6, SDG 8, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00354 |
Gemköprü Hydro Power Plant |
Türkiye |
11 Sep 2022 - 25 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
4,850 |
Yes |
Yes |
SDG 4, 5, SDG 7, SDG 8, SDG 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00500 |
30 MW Solar Power Plant by Aurobindo Pharma Limited |
India |
10 Oct 2022 - 24 Oct 2022 |
ACM0002 ,Version 20 |
46,369 |
Yes |
Yes |
SDG 7,8,9,5,4,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00470 |
Alanya Turkler Landfill Gas to Electricity Project |
Türkiye |
5 Oct 2022 - 19 Oct 2022 |
ACM0001: Flaring or use of landfill gas - Version 19.0 ; ACM0022: Alternative waste treatment processes - Version 3.0 |
54,265 |
Yes |
Yes |
5, 7, 8, 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00290 |
Gurses Bundled SPP |
Türkiye |
7 Aug 2022 - 21 Aug 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
13,880 |
Yes |
Yes |
6, 7, 8, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00293 |
HK SOLAR BUNDLE |
Türkiye |
7 Aug 2022 - 21 Aug 2022 |
AMS-I.D.: Grid connected renewable electricity generation ver 18.0 |
18337 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00340 |
Wind Power Project Activity in MP, India |
India |
8 Sep 2022 - 22 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
14916 tCO2e per year |
Yes |
Yes |
3, 4,5,6,7,8,15 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00294 |
Sariturhal Bundled SPP |
Türkiye |
9 Aug 2022 - 23 Aug 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
9,609 |
Yes |
Yes |
6, 7, 8, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00812 |
Heze Sanrui 20MW Grid connected Photovoltaic Power Generation Project |
China |
10 Jan 2023 - 24 Jan 2023 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0) |
18,764 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00769 |
Bundled Wind Power Project In Madhya Pradesh and Gujarat |
India |
29 Dec 2022 - 12 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources ver 20 |
103,680 |
Yes |
Yes |
3, 5, 7, 8, 9 & 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00069 |
30 MW Tri Viet 1 Solar Project |
Viet Nam |
11 Jan 2022 - 25 Jan 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
40,877 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00816 |
Ecogreen Bundle SPP Project-2 |
Türkiye |
10 Jan 2023 - 24 Jan 2023 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
8,153 |
Yes |
Yes |
5,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00104 |
Tesla Yörük Solar Bundle |
Türkiye |
17 Feb 2022 - 3 Mar 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
20202 |
Yes |
Yes |
7, 8, 9 and 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00732 |
Chuntangba Hydropower Plant |
China |
14 Dec 2022 - 28 Dec 2022 |
ACM0002 (Version20.0) |
128612 |
Yes |
Yes |
#7 #8 #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00669 |
Organic Waste to Bio CNG project by Arc Bio Fuel Private Limited |
India |
6 Dec 2022 - 20 Dec 2022 |
AMS-III.D - Version 21.0, AMS-I.C. - Version 22.0 |
49,651 tCO2e |
Yes |
Yes |
5, 7, 8, 9, 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00719 |
5 MW Hydro Power Project at Tanga by Himalaya Hydro Private Limited |
India |
12 Dec 2022 - 26 Dec 2022 |
AMS-I.D. Grid connected renewable electricity generation --- Version 18.0 |
18760 |
Yes |
Yes |
1,7,8 and 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00808 |
Solar Power Project in Bihar |
India |
10 Jan 2023 - 24 Jan 2023 |
AMS-I.D.: - Grid Connected renewable electricity generation – Version 18.0 |
13910 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00546 |
TianRun XiaoCaoHu 99MW Wind Power Project |
China |
25 Oct 2022 - 8 Nov 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
171,757 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00348 |
Solar Energy Project in Telangana |
India |
8 Sep 2022 - 22 Sep 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, Ver 03.0 |
158,412 |
Yes |
Yes |
3, 5, 7, 8, 9, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00399 |
Qinshui Huamei Pingshan CMM Power Project |
China |
22 Sep 2022 - 6 Oct 2022 |
ACM0008 v08.0 |
172,194 |
Yes |
Yes |
#8, #9 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00458 |
Akkuş WPP |
Türkiye |
2 Oct 2022 - 16 Oct 2022 |
CDM Approved AMS-I.D. Grid-connected renewable electricity generation, version 18.0 |
20223 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00391 |
Dalian Jinzhou MSW Incineration Project |
China |
21 Sep 2022 - 5 Oct 2022 |
ACM0022, Version 03.0 |
125,649 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00400 |
Solar Powered Irrigation Services by CLARO Energy, Project-4 |
India |
22 Sep 2022 - 6 Oct 2022 |
AMS-I.B Mechanical energy for the user with or without electrical energy version 12.0. |
6774 |
Yes |
Yes |
1,3,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00477 |
Shanxi Junfa 9.15MW Coal Mine Methane Power Generation Project |
China |
6 Oct 2022 - 20 Oct 2022 |
ACM0008 version8.0 |
86,469 |
Yes |
Yes |
#8,#11,#13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00314 |
10 MW Solar Project in Karnataka |
India |
18 Aug 2022 - 1 Sep 2022 |
GCC M001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, Version 3.0. |
16737 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00417 |
190 MW Solar Power PV Project |
India |
26 Sep 2022 - 10 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
462,579 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00639 |
26 MW Wind Project in Madhya Pradesh, India |
India |
28 Nov 2022 - 12 Dec 2022 |
ACM0002 Version 20.0 |
40480 (TCO2/Year) |
Yes |
Yes |
Goals 7,8,9,11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00878 |
Fuel Efficiency Improvement for Al Walidia Power Plant in Egypt |
Egypt |
12 Feb 2023 - 26 Feb 2023 |
AM0061 - Methodology for rehabilitation and/or energy efficiency improvement in existing power plants - Version 2.1 |
123,136 |
Yes |
Yes |
8,12,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00645 |
18 MWp Song Luy Solar Power Plant |
Viet Nam |
28 Nov 2022 - 12 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
26478 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00671 |
Momentum Enerji Solar Power Projects Bundle 3 |
Türkiye |
6 Dec 2022 - 20 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
10,488 tCO2/year |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00646 |
Biomass thermal project in Maharashtra (001) |
India |
28 Nov 2022 - 12 Dec 2022 |
AMS I.C. version 22 |
32,094 |
Yes |
Yes |
5,7,8,9,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00838 |
Generation of renewable power at Nura solar power plant |
Kazakhstan |
22 Jan 2023 - 5 Feb 2023 |
GCCM001 - 3.0 |
95,366 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 12 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00827 |
Echo 2 Wind Complex |
Brazil |
17 Jan 2023 - 31 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 21.0 |
235,290 |
Yes |
Yes |
7, 8, 9 and 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00510 |
Zhenping County MSW Landfill site LFG Recovery to power project |
China |
16 Oct 2022 - 30 Oct 2022 |
AMS-III.G: Landfill Methane Recovery – Version 10.0; AMS-I. D: Grid connected renewable electricity generation – Version 18.0 |
43,782 |
Yes |
Yes |
SDG#7, SDG#8, SDG#9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00053 |
Karatas-I Regulator and Hydro Power Plant |
Türkiye |
23 Dec 2021 - 6 Jan 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
24354 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00083 |
Sazılar Solar Power Plant Bundle |
Türkiye |
23 Jan 2022 - 6 Feb 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
6611 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG11, SDG13 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00884 |
90 MW Devikot-II Solar PV Project |
India |
20 Feb 2023 - 6 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-20.0 |
195684 |
Yes |
Yes |
SDG7, SDG8, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00410 |
Miskevank Wind Power Plant |
Türkiye |
25 Sep 2022 - 9 Oct 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
39,339 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00550 |
Zhaoqing Ma’an LFG Power Generation Project |
China |
26 Oct 2022 - 9 Nov 2022 |
ACM0001: Flaring or use of landfill gas ( Version19.0) |
60,465 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00097 |
Solar Power Project in Solapur & Amravati, Maharashtra by Avaada MHSustainable |
India |
13 Feb 2022 - 27 Feb 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
446,301 tCO2e |
Yes |
Yes |
Goals 1, 3, 4, 5, 6, 7, 8, 13,15 |
Diamond |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00557 |
Arushi 87MW bundled solar power project in Telangana and Andhra Pradesh, India |
India |
27 Oct 2022 - 10 Nov 2022 |
GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022) |
125,932 |
Yes |
Yes |
1,3,4,7,8 and 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00720 |
Taolai River Hydropower Project |
China |
12 Dec 2022 - 26 Dec 2022 |
ACM0002 Version 20.0 |
48,047 |
Yes |
Yes |
SDG #7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00823 |
Thailand Solar Bundle 2 by Super Energy Corp |
Thailand |
17 Jan 2023 - 31 Jan 2023 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
31,138 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00024 |
2017 No. 4 Project Shouyang PV Power Forerunner Hub (Shanghu Town, Xiluo Town, Mashou Town) |
China |
2 Nov 2021 - 16 Nov 2021 |
GCCM001 “Methodology for Grid Connected Renewable Energy Generation Projects’,Version 2.0 |
117106 |
Yes |
Yes |
7,8,9, 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00922 |
20 MW Auraiya Floating Solar PV Project |
India |
9 Mar 2023 - 23 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
39457 |
Yes |
Yes |
SDG7, SDG8, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00555 |
Karamursel Wind Power Project |
Türkiye |
27 Oct 2022 - 10 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
75673 |
Yes |
Yes |
6, 7, 11 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00130 |
Renewable Solar Power Project in Milas, Muğla |
Türkiye |
20 Mar 2022 - 3 Apr 2022 |
AMS-I.D.: Grid Connected Renewable Electricity Generation --- Version 18.0 |
22,892 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00883 |
90 MW Anta Solar PV Project |
India |
16 Feb 2023 - 2 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-20.0 |
195254 |
Yes |
Yes |
SDG7, SDG8, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00845 |
4 MW Mula (RBC) Hydro Electric Project |
India |
24 Jan 2023 - 7 Feb 2023 |
AMS-I.D.: Grid connected renewable electricity generation – Version 18.0 |
9,504 |
Yes |
Yes |
5,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00777 |
Dostluk Bundled SPP |
Türkiye |
3 Jan 2023 - 17 Jan 2023 |
AMS-I.D: Grid connected renewable electricity generation, Version 18.0 |
18,052 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00609 |
49.5 MW Wind Power Project by M/s Fortune Integrated Assets Finance Limited in India. |
India |
20 Nov 2022 - 4 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
1,32,746 |
Yes |
Yes |
5,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00373 |
Haitianda Hoboksar 30MW Photovoltaic Power Station Project |
China |
14 Sep 2022 - 28 Sep 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0) |
32,970 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00369 |
Kelu Chabuchar County 30MW Grid-connected Photovoltaic Power Generation Project |
China |
14 Sep 2022 - 28 Sep 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0) |
33,424 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00015 |
70 MW Bundled Solar Power Projects by Atria Power |
India |
16 Jul 2021 - 30 Jul 2021 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
113969 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00046 |
Usak Bundled SPP |
Türkiye |
15 Dec 2021 - 29 Dec 2021 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
14,711 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00374 |
Zhongxing Energy Yuanguang Kezhou Atushi 40MW Photovoltaic Grid-connected Power Generation Project |
China |
14 Sep 2022 - 28 Sep 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0) |
42,644 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00398 |
Garze Prefecture Zier River Mawo Hydropower Station Project |
China |
22 Sep 2022 - 6 Oct 2022 |
ACM0002 version20.0 |
80,102 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00387 |
17 MW Bundled Solar Power Plant |
India |
19 Sep 2022 - 3 Oct 2022 |
ACM0002 version 20.0 |
24,874 TCO2/Year |
Yes |
Yes |
Goal-3, Goal-4, Goal-7, Goal-8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00633 |
Bundled Solar Power Project 2 by STC Elektronik |
Türkiye |
24 Nov 2022 - 8 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
14,453 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00620 |
Bundled Solar Energy Project in Karnataka and Odisha, India |
India |
21 Nov 2022 - 5 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
168,485 |
Yes |
Yes |
3, 5, 7, 8, 9 & 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00581 |
Wangpo coal mine 7.5MW CMM generation project |
China |
8 Nov 2022 - 22 Nov 2022 |
ACM0008 Version 08.0 |
249,279 |
Yes |
Yes |
8,9,11,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00716 |
Ningyang Fushan Photovoltaic Greenhouse Power Project |
China |
12 Dec 2022 - 26 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources” (Version 20.0) |
21624 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00565 |
Qinghe County Downtown Area Geothermal Heating Project |
China |
31 Oct 2022 - 14 Nov 2022 |
CDM Methodology AM0072: Fossil Fuel Displacement by Geothermal Resources for Space Heating (Version 03.0) |
300,819 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00554 |
TBEA Shankou 150MWp Solar Power Project in southeastern of Hami |
China |
27 Oct 2022 - 10 Nov 2022 |
ACM0002 version20.0 |
176,739 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00569 |
20 MW Solar Power Project |
India |
3 Nov 2022 - 17 Nov 2022 |
GCCM001 Methodology for Renewable Energy Generation projects supplying Electricity to Grid or Captive Consumers Version 3.0 |
34,016 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00862 |
20 MW Solar Bundled Project in UK |
India |
6 Feb 2023 - 20 Feb 2023 |
ACM0002 Version 20.0 |
34,895 (TCO2/Year) |
Yes |
Yes |
Goals 7,8,9,11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00428 |
55 MW Solar Project in Tamil Nadu |
India |
27 Sep 2022 - 11 Oct 2022 |
GCC M001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, Version 3.0. |
113,535 |
Yes |
Yes |
7,8,9,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00378 |
Artvin Hydroelectric Power Plant |
Türkiye |
14 Sep 2022 - 28 Sep 2022 |
ACM0002 version 20.0, Grid-connected electricity generation from renewable sources |
585,595 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00050 |
Dinar Bundled SPP |
Türkiye |
16 Dec 2021 - 30 Dec 2021 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
5,955 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00547 |
10.43 MW (DC) Solar Power Project by Aditya Green Energy Private Limited in Maharashtra, India |
India |
25 Oct 2022 - 8 Nov 2022 |
AMS-I.D.: - Grid Connected renewable electricity generation – Version 18.0. |
13,231 |
Yes |
Yes |
SDG-7, SDG-8, SDG-9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00815 |
50 MWp Solar power project in Solapur, Maharashtra by AMP Energy |
India |
10 Jan 2023 - 24 Jan 2023 |
ACM 0002, Version 21 |
68,136 |
Yes |
Yes |
1,5,7,8,9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00708 |
Erkar LFG Power Plant |
Türkiye |
11 Dec 2022 - 25 Dec 2022 |
ACM0001 version 19.0 |
20,897 |
Yes |
Yes |
7,8 and 12 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00131 |
Boyali Bundled SPP |
Türkiye |
20 Mar 2022 - 3 Apr 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
11,272 |
Yes |
Yes |
6, 7, 8, 11 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00841 |
200 MW (4 x 50 MW) Solar PV Project in Anantapur District (AP), India |
India |
24 Jan 2023 - 7 Feb 2023 |
ACM0002 “Grid-connected electricity generation from renewable sources”, Version – 20.0 |
282,610 |
Yes |
Yes |
SDG-7, SDG-8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00891 |
Coromandel Renewable Energy Project |
Brazil |
20 Feb 2023 - 6 Mar 2023 |
ACM0002 – Grid-connected electricity generation from renewable sources V21.0. |
77,747 |
Yes |
Yes |
1, 7, 8, 9, 10, 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00338 |
Fener Wind Power Project |
Türkiye |
7 Sep 2022 - 21 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation---Version 18.0 |
12964 |
Yes |
Yes |
6, 7, 11 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00295 |
Renewable Solar Power Project by Tata Power in Andhra Pradesh, Karnataka & Maharashtra |
India |
9 Aug 2022 - 23 Aug 2022 |
ACM0002 (Version 20.0) |
542,916 |
Yes |
Yes |
1, 5, 7, 8, 13 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00128 |
Derinkuyu Solar Power Plant Bundle |
Türkiye |
9 Mar 2022 - 23 Mar 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
20,122 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
REGISTERED |
S00604 |
Waste to Energy Plant 24 MW by Processing of Municipal Solid Waste at Narela-Bawana, New Delhi in India. |
India |
20 Nov 2022 - 4 Dec 2022 |
ACM0022: Alternative Waste Treatment Processes-Version 3.0 |
220,945 |
Yes |
Yes |
1,5, 6,7, 8,9, 11, 12 ,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00755 |
Bundled Solar Energy Project in Gujarat, Rajasthan and Uttar Pradesh |
India |
22 Dec 2022 - 5 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
957,985 |
Yes |
Yes |
3, 5, 7, 8, 9 & 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00349 |
Benban Solar Park Bundled Project 4 |
Egypt |
8 Sep 2022 - 22 Sep 2022 |
GCCM001 “Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers” -Version 3.0 |
147,600 tCO2eq/Year |
Yes |
Yes |
SDG7, SDG8, SDG9, SDG11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00507 |
Rongchang County MSW Landfill Site LFG Recovery to power Project |
China |
13 Oct 2022 - 27 Oct 2022 |
AMS-III.G. Landfill methane recovery --- Version 10.0 AMS-I.D. Grid connected renewable electricity generation---Version 18.0 |
44811 |
Yes |
Yes |
SDG#7,SDG#8,SDG#9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00832 |
Kıvanç-2 Solar Power Project |
Türkiye |
19 Jan 2023 - 2 Feb 2023 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 21.0 |
76,228 tCO2e/year |
Yes |
Yes |
SDG 4, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00691 |
Astronergy Solar Turkey 2 |
Türkiye |
8 Dec 2022 - 22 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation - v18.0 |
11,898 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00916 |
Safe Drinking Water Supply in India by M/s Naandi Community Water Services Pvt. Ltd. |
India |
8 Mar 2023 - 22 Mar 2023 |
AMS-III.AV. Low greenhouse gas-emitting safe drinking water production systems, Version 08.0 |
35002 |
Yes |
Yes |
3,5,6,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00840 |
Gelibolu-GRES Wind Solar Hybrid Bundle |
Türkiye |
23 Jan 2023 - 6 Feb 2023 |
ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 20 |
41215 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00476 |
TuGuTang GCC carbon emission reduction development project |
China |
6 Oct 2022 - 20 Oct 2022 |
ACM0002 |
204908 |
Yes |
Yes |
#7,#8,#9,#13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00122 |
Renewable Solar Power Project in Kahramankazan, Ankara |
Türkiye |
3 Mar 2022 - 17 Mar 2022 |
AMS-I.D.: Grid Connected Renewable Electricity Generation --- Version 18.0 |
3.198 |
Yes |
Yes |
SDG 7, SDG 8, SDG9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00723 |
Mersinli Wind Power Plant |
Türkiye |
12 Dec 2022 - 26 Dec 2022 |
ACM0002: Grid connected electricity generation from renewable sources - Version 20.0 |
12,477 |
Yes |
Yes |
SDGs 6, 7, 8, 9, 11, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00854 |
Solar Power Project by Photon Sunbeam Pvt. Ltd. |
India |
29 Jan 2023 - 12 Feb 2023 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 21.0 |
61,652 |
Yes |
Yes |
4,7,8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00842 |
Wind Power Project in Sangli, Maharashtra byGlobal Metal & Energy Private Limited |
India |
24 Jan 2023 - 7 Feb 2023 |
AMS-I.D.: - Grid connected renewable electricity generation - Version 18.0 |
18,527 |
Yes |
Yes |
7,8,4,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00855 |
Solar Power Project by Photon SuryaKiran Pvt. Ltd. |
India |
29 Jan 2023 - 12 Feb 2023 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 21.0 |
113,771 |
Yes |
Yes |
4,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00844 |
Yeksun Solar Power Plant Bundle |
Türkiye |
24 Jan 2023 - 7 Feb 2023 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
19,438 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00846 |
Ezine Biomass Power Plant Project |
Türkiye |
24 Jan 2023 - 7 Feb 2023 |
ACM0018: Electricity generation from biomass in power-only plants --- Version 6.0 |
105093 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00093 |
10 MW bundled rooftop solar power project by SAEL at various building premises of NMRC. |
India |
2 Feb 2022 - 16 Feb 2022 |
AMS I F, Version 3.0 |
14344 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
REGISTERED |
S00102 |
7.5 MW (AC) grid connected canal top solar PV project by Vijay Printing in Patiala, Punjab, India |
India |
16 Feb 2022 - 2 Mar 2022 |
AMS I D, Version 18.0 |
11831 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
REGISTERED |
S00873 |
Pedra Cheirosa Complex |
Brazil |
8 Feb 2023 - 22 Feb 2023 |
ACM0002 – Grid-connected electricity generation from renewable sources V21.0 |
91,633 |
Yes |
Yes |
1, 7, 8, 9, 10, 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00690 |
Astronergy Solar Turkey 1 |
Türkiye |
8 Dec 2022 - 22 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation - v18.0 |
17,944 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00875 |
Castilho Solar Power Renewable Energy Project |
Brazil |
9 Feb 2023 - 23 Feb 2023 |
ACM0002 – Grid-connected electricity generation from renewable sources – Version 20.0 |
215,413 |
Yes |
Yes |
1, 7, 8, 9, 11 and 12 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00652 |
Astronergy Solar Turkey 3 |
Türkiye |
29 Nov 2022 - 13 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation - v18.0 |
7,637 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00385 |
Heyang Dongxu 19.8MWp Solar PV Power Generation Project |
China |
18 Sep 2022 - 2 Oct 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
17701 |
Yes |
Yes |
SDG 7, 8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00651 |
Solar Power Project PSEPL |
India |
29 Nov 2022 - 13 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
93,142 tCO2e |
Yes |
Yes |
SDG 7, 8, 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00867 |
300 MW Solar Project in Rajasthan |
India |
6 Feb 2023 - 20 Feb 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
646814 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00678 |
10 MW solar energy project by LMW in Tamil Nadu |
India |
6 Dec 2022 - 20 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
19,473 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00857 |
Renewable Solar Power Project by Phelan Energy India RJ Private Limited. |
India |
30 Jan 2023 - 13 Feb 2023 |
CDM approved consolidated Methodology ACM0002 (Version 21.0) |
113,938 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00588 |
9.6 MW Wind Power Project |
India |
13 Nov 2022 - 27 Nov 2022 |
AMS-1.D- Grid connected renewable electricity Generation, Version -18 |
12,676 |
Yes |
Yes |
SDG 3,SDG 5,SDG 7,SDG 8,SDG 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00124 |
5 MW solar PV project by Laxjeet Renewable at Karnataka, India |
India |
6 Mar 2022 - 20 Mar 2022 |
AMS I D, Version 18.0 |
8288 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
REGISTERED |
S00125 |
10 MW (AC) grid connected solar PV project by Vijay Printing in Maharashtra, India |
India |
6 Mar 2022 - 20 Mar 2022 |
AMS I D, Version 18.0 |
15788 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
REGISTERED |
S00372 |
BG Wind Power Project |
India |
14 Sep 2022 - 28 Sep 2022 |
ACM0002: Grid-connected electricity generation from renewable sources ; Version 20.0 |
30,917 |
Yes |
Yes |
SDG 7,13 |
Bronze |
CORSIA(C+) |
VERIFICATION |
S00422 |
Solar Power Project by ES Energy |
India |
26 Sep 2022 - 10 Oct 2022 |
AMS-I.D. Grid connected renewable electricity generation; Version 18.0 |
16,588 |
Yes |
Yes |
SDG 7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00423 |
Solar Power Project by ES Solar |
India |
26 Sep 2022 - 10 Oct 2022 |
AMS-I.D. Grid connected renewable electricity generation; Version 18.0 |
16,588 |
Yes |
Yes |
SDG 7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00721 |
Karakurt HEPP |
Türkiye |
12 Dec 2022 - 26 Dec 2022 |
CDM Approved ACM0002 Grid-connected electricity generation from renewable sources, version 20.0 |
197,610 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00703 |
Renewable Energy Project by Al-Madounah Solar Power Plant |
Jordan |
11 Dec 2022 - 25 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation- Version 18.0 |
12625 |
Yes |
Yes |
SDG3, SDG4, SDG7, SDG9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00894 |
130 MW bundled solar project in Karnataka |
India |
20 Feb 2023 - 6 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
196445 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00159 |
Solar Power Project by YBT Enerji |
Türkiye |
6 Apr 2022 - 20 Apr 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
17,332 tCO2e |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00872 |
Household biodigester project by Outreach projects private limited |
India |
7 Feb 2023 - 21 Feb 2023 |
AMS-I.E.: Switch from non-renewable biomass for thermal applications by the user --- Version 13.0 |
21040 |
Yes |
Yes |
SDG3, SDG7, SDG8, SDG 13, SDG 15 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00881 |
23 MW Solapur Solar PV Project |
India |
16 Feb 2023 - 2 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
48,017 |
Yes |
Yes |
SDG7, SDG8, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00080 (GSC REDONE) |
80 MW Solar Power Project in Gujarat by KPI Global Infrastructure Limited (GSC REDONE) |
India |
23 Jan 2022 - 6 Feb 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
97,837 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00859 |
Solar Power Project by Perinyx Neep Private Limited |
India |
1 Feb 2023 - 15 Feb 2023 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
12,110 |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00402 |
Houay Lamphanh Gnai |
Lao People's Democratic Republic |
25 Sep 2022 - 9 Oct 2022 |
ACM0002.: Grid-connected electricity generation from renewable sources, Version 20.0 |
252,895 tCO2e |
Yes |
Yes |
SDG 7, 8, 9, 11 and 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00659 |
Afyon-1 Biogas Power Plant |
Türkiye |
1 Dec 2022 - 15 Dec 2022 |
AM0073 “GHG emission reductions through multi-site manure collection and treatment in a central plant” -- V1.0 |
158,484 |
Yes |
Yes |
SDGs 3, 7, 8, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00655 |
Proges Bundled Solar Power Plants |
Türkiye |
29 Nov 2022 - 13 Dec 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
12,898 |
Yes |
Yes |
SDG-7, SDG-8, SDG-9, SDG-13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00686 |
Malea Hydropower 2x45 MW |
Indonesia |
6 Dec 2022 - 20 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20. |
450,300 |
Yes |
Yes |
SDG 7, 8, 9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00797 |
Al- Badiya_PV_Power_Generation_Phase_2 |
Jordan |
5 Jan 2023 - 19 Jan 2023 |
AMS-I.D.: Grid connected renewable electricity generation- Version 18.0 |
8942 |
Yes |
Yes |
SDG5,SDG7,SDG8,SDG9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00606 |
Eskisehir Solar Bundle |
Türkiye |
20 Nov 2022 - 4 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation - v18.0 |
15,444 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00877 |
30 MW Solar Energy Project by AMP Solar in Karnataka, India |
India |
12 Feb 2023 - 26 Feb 2023 |
ACM 0002, Version 20 |
56649 |
Yes |
Yes |
1,5,7,8,9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00532 |
Yılmaz Wind Power Plant |
Türkiye |
23 Oct 2022 - 6 Nov 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
32,410 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00589 |
Huai'an Diliutun Phase I 20MW Solar Power Project |
China |
14 Nov 2022 - 28 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources” (Version 20.0) |
24435 |
Yes |
Yes |
7,8 ,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00888 |
296 MW Fatehgarh Solar PV Project |
India |
20 Feb 2023 - 6 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
650539 |
Yes |
Yes |
SDG1, SDG7, SDG8, SDG13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00580 |
Renewable Wind and Solar Project by the Tata Power Group |
India |
6 Nov 2022 - 20 Nov 2022 |
ACM0002 (Version 20.0) |
789,702 |
Yes |
Yes |
1, 5, 7, 8, 13 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00529 |
6.1 MW bundled solar project in Andhra Pradesh |
India |
20 Oct 2022 - 3 Nov 2022 |
GCCM001 V3.0 - Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers |
9,336 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00693 |
Gökçen BPLAS Bundle SPP |
Türkiye |
8 Dec 2022 - 22 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
17,973 |
Yes |
Yes |
7,8,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00853 |
Wonder Cement 12 MW Waste Heat Recovery Project in Rajasthan |
India |
29 Jan 2023 - 12 Feb 2023 |
ACM0012:Waste Heat Recovery, Version 6.0 |
65,051 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00087 |
Hanel Solar Power Project Bundle |
Türkiye |
31 Jan 2022 - 14 Feb 2022 |
CDM approved consolidated Methodology ACM0002 (Version 20.0) |
33683 |
Yes |
Yes |
SDG 4, SDG 7, SDG8, SDG11, SDG13, SDG 14 |
Diamond |
CORSIA(C+) |
REQUEST FOR REGISTRATION |
S00058 |
Solar Power Project in Bikaner, Rajasthan by Avaada Sunrays |
India |
6 Jan 2022 - 20 Jan 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
670,538 tCO2e |
Yes |
Yes |
Goals 1, 3, 4, 5, 6, 7, 8, 13,15 |
Diamond |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00771 |
5MW Solar power plant by Sunlayer Energy in Uttarakhand, India |
India |
29 Dec 2022 - 12 Jan 2023 |
AMS I.D. Version 18 |
8,365 |
Yes |
Yes |
1, 5, 7, 8, 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00887 |
250 MW Sambhu Ki Burj-I Solar PV Project |
India |
20 Feb 2023 - 6 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
573963 |
Yes |
Yes |
SDG7, SDG8, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00874 |
Gameleira Complex |
Brazil |
8 Feb 2023 - 22 Feb 2023 |
ACM0002 – Grid-connected electricity generation from renewable sources V21.0 |
155,849 |
Yes |
Yes |
1, 7, 8, 9, 10, 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00918 |
Solar Powered Irrigation Services by Claro Energy- Project 2 |
India |
9 Mar 2023 - 23 Mar 2023 |
AMS-I.B Mechanical energy for the user with or without electrical energy version 12.0. |
5847 |
Yes |
Yes |
1,7,8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00637 |
24 MW Gullu Small Hydro Electric Project by Chhattisgarh Hydro Power LLP |
India |
28 Nov 2022 - 12 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
91,100 |
Yes |
Yes |
1,4,5,7,8,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00617 |
Sandla 74MW bundled Wind Power project at Andhra Pradesh, India |
India |
21 Nov 2022 - 5 Dec 2022 |
GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022) |
137,425 |
Yes |
Yes |
1,3,4,7,8 and 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00234 |
Teksin SPP |
Türkiye |
19 May 2022 - 2 Jun 2022 |
ACM0002 Version 20 |
46,144 |
Yes |
Yes |
5,7,8,9,13 |
Platinum |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00750 |
30 MW Solar Project_HPPPL |
India |
22 Dec 2022 - 5 Jan 2023 |
ACM0002 version 20.0 |
45,016 TCO2/ Year |
Yes |
Yes |
Goal-4, Goal-7, Goal-8, Goal-9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00089 |
Saral-3 Regulator and Hydro Power Plant |
Türkiye |
31 Jan 2022 - 14 Feb 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
38,845 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
GCC ASSESMENT |
S00709 |
15 MW Solar Energy Project by Rudra Solarfarms in Telangana, India |
India |
11 Dec 2022 - 25 Dec 2022 |
ACM 0002, Version 20 |
27607 |
Yes |
Yes |
7&8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00321 |
Solar Power Project by HInduja Renewable |
India |
24 Aug 2022 - 7 Sep 2022 |
ACM0002: Grid-connected electricity generation from renewable sources ; Version 20.0 |
52,331 |
Yes |
Yes |
SDG 7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00865 |
10 MW Solar Project in Karnataka |
India |
6 Feb 2023 - 20 Feb 2023 |
AMS I.D Grid-connected renewable electricity generation, Version 18.0 |
15742 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00328 |
10 MW Solar Power Project by SECI |
India |
31 Aug 2022 - 14 Sep 2022 |
AMS I.D- Grid Connected Renewable electricity Generation-Version 18.0 |
17,077 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00921 |
Xitieshan Liushaping 49.5MW Wind Power Project |
China |
9 Mar 2023 - 23 Mar 2023 |
ACM0002 version20.0 |
69,530 |
Yes |
Yes |
7, 8, 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00837 |
Hamsi Wind Power Project |
Türkiye |
22 Jan 2023 - 5 Feb 2023 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
90748 |
Yes |
Yes |
6, 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00533 |
5 MW Biomass Based Power Generation project in Raichur |
India |
23 Oct 2022 - 6 Nov 2022 |
AMS I.F Renewable Electricity Generation for Captive use and mini grid version 4.0 |
32,387 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00534 |
Cerkes Hybrid Wind and Solar Power Project |
Türkiye |
23 Oct 2022 - 6 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
129640 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00915 |
735 (3x245MW) Nokh Solar PV Project |
India |
7 Mar 2023 - 21 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
1718180 |
Yes |
Yes |
SDG7, SDG8, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00133 |
Yaliniz Bundled SPP |
Türkiye |
23 Mar 2022 - 6 Apr 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
15,803 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00599 |
Sichuan Gashe Longdong Hydropower Station |
China |
15 Nov 2022 - 29 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
395,245 |
Yes |
Yes |
7, 8, 11 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00753 |
Iskenderun Landfill Gas to Electricity Project |
Türkiye |
22 Dec 2022 - 5 Jan 2023 |
ACM0001 Version 19.0 |
188,931 |
Yes |
Yes |
SDG6,SDG7,SDG8,SDG13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00870 |
Phong Lieu Wind Power project |
Viet Nam |
7 Feb 2023 - 21 Feb 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
127901 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00023 |
2017 No. 2 Project Shouyang PV Power Forerunner Hub (Songtai Town) |
China |
1 Nov 2021 - 15 Nov 2021 |
GCCM001 “Methodology for Grid Connected Renewable Energy Generation Projects’,Version 2.0 |
117106 |
Yes |
Yes |
7,8,9, 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00032 (GSC REDONE) |
Henan Nanzhao Huanghou Wind Power Project (GSC REDONE) |
China |
1 Dec 2021 - 15 Dec 2021 |
ACM0002 version20.0 |
131,615 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00151 |
Troya Solar Power Plant Bundle |
Türkiye |
3 Apr 2022 - 17 Apr 2022 |
AMS-I.D.: Grid Connected Renewable Electricity Generation --- Version 18.0 |
17,996 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00081 (GSC REDONE) |
Xitieshan Liushaping 49.5MW Wind Power Project |
China |
23 Jan 2022 - 6 Feb 2022 |
ACM0002 version20.0 |
69,530 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00641 |
Yingpan Hydropower Station |
China |
28 Nov 2022 - 12 Dec 2022 |
Version 20.0 of ACM0002 “Large-scale Consolidated Methodology: Grid-connected electricity generation from renewable sources’ |
50812 |
Yes |
Yes |
7,8,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00623 |
Seleda Biogas Plant Project |
Türkiye |
22 Nov 2022 - 6 Dec 2022 |
GCCM003-Methodology-for-Energy-Generation-from-Animal-Manure-and-Waste-Management-Projects-v2.0 |
114,530 |
Yes |
Yes |
6, 7, 8, 9, 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00255 |
Emission Reductions from Tenaga Generasi Limited Grid Connected 49.5MW Wind Power Plant |
Pakistan |
29 Jun 2022 - 13 Jul 2022 |
ACM0002: Grid-connected electricity generation from renewable sources, Version 20.0 |
86,878 |
Yes |
Yes |
1, 6, 7, 9, 15 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00152 |
Aohanqi Xinhuo 100MW Solar Power Project |
China |
3 Apr 2022 - 17 Apr 2022 |
ACM0002 version20.0 |
117,835 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00231 |
Hawa Energy Wind Farm Project |
Pakistan |
19 May 2022 - 2 Jun 2022 |
ACM0002: Grid-connected electricity generation from renewable sources (Version 20.0) |
85,946 |
Yes |
Yes |
1,4, 5, 7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00232 |
Jhimpir Power Wind Farm Project |
Pakistan |
19 May 2022 - 2 Jun 2022 |
ACM0002: Grid-connected electricity generation from renewable sources (Version 20.0) |
84,891 |
Yes |
Yes |
1,4, 5, 7, 8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00180 |
Tongwei Qianjiang Solar Power Project |
China |
18 Apr 2022 - 2 May 2022 |
ACM0002 version20.0 |
50,397 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00218 |
Guodian Power Ordos City Hangjinqi 50MW Solar Power Project |
China |
15 May 2022 - 29 May 2022 |
ACM0002 version20.0 |
65,117 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00251 |
Wind Power Project in Jhimpir Thatta, Sindh by Indus Wind Energy Limited |
Pakistan |
9 Jun 2022 - 23 Jun 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
96,185 tCO2e |
Yes |
Yes |
Goals 3, 4, 6, 7, 8,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00432 |
Sichuan Qianwei Hydropower Project |
China |
27 Sep 2022 - 11 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
1,169,177 |
Yes |
Yes |
SDG 7, 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00246 |
Dingbian Xin’an bian 50MW Wind Power Project |
China |
2 Jun 2022 - 16 Jun 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
80,153 |
Yes |
Yes |
SDG 7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00861 |
TOROS WHR |
Türkiye |
5 Feb 2023 - 19 Feb 2023 |
ACM0012 Version 6.0 |
142637 |
Yes |
Yes |
7,8,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00278 |
KOZBÜKÜ HEPP |
Türkiye |
31 Jul 2022 - 14 Aug 2022 |
ACM0002 ver.20 |
148680 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00475 |
Birleşim Yeşil Enerji Bundle SPP Project |
Türkiye |
5 Oct 2022 - 19 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
47,153 |
Yes |
Yes |
6,7,8,9,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00579 |
Dulan Beikeliang 49.5MW Wind Power Project |
China |
6 Nov 2022 - 20 Nov 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
80,439 |
Yes |
Yes |
SDG 7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00426 |
Xinjiang Hami Wind Power Base Phase II Southeast Wind Zone Yandun 8A Wind Farm 200MW Project |
China |
27 Sep 2022 - 11 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources (Version 20.0); |
342,119 |
Yes |
Yes |
#7,#8,#9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00270 |
No.1 Solar Power Project in Delingha Solar Power Generation Application Leading Base |
China |
26 Jul 2022 - 9 Aug 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
134,180 |
Yes |
Yes |
SDG #7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00800 |
Havza Wind Power Project by Ekim Elektrik Mühendislik Müşavirlik İnşaat Turizm ve Ticaret A.Ş. |
Türkiye |
5 Jan 2023 - 19 Jan 2023 |
ACM0002: Grid-connected electricity generation from renewable sources– Version 21.0 |
89,416 tCO2e/year |
Yes |
Yes |
SDG 4, SDG 7, SDG 8, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00456 |
Datça WPP |
Türkiye |
2 Oct 2022 - 16 Oct 2022 |
AMS-I.D. , version 18.0 |
35577 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00528 |
Sichuan Yuwa 49MW Hydro Power Project |
China |
20 Oct 2022 - 3 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources (Version 20.0) |
113,903 |
Yes |
Yes |
#4, #7, #8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00601 |
Biogas utilization project in Huangyang Town, Wuwei City, Gansu Province |
China |
15 Nov 2022 - 29 Nov 2022 |
GCCM003 ver1.0 |
24,177 t CO2e/yr |
Yes |
Yes |
SDGs to be achieved : 3, 7, 8, 9, 11 |
Diamond |
N/A |
VERIFICATION |
S00642 |
Bundled Solar Power Project 3 by Elestaş Enerji |
Türkiye |
28 Nov 2022 - 12 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0 |
13,101 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00275 |
Jinzhai County Anyang 50MW Solar Power Project |
China |
28 Jul 2022 - 11 Aug 2022 |
ACM0002 version20.0 |
37,695 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00370 |
Jiuzhou Fangyuan Bole Phase 7 60MW PV Grid-connected Power Generation Project |
China |
14 Sep 2022 - 28 Sep 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0) |
77,767 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00616 |
Youshui Luoshuidong Hydropower Station Project |
China |
21 Nov 2022 - 5 Dec 2022 |
ACM0002 version20.0 |
60,803 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00445 |
Panchengling CMM Power Generation Project |
China |
29 Sep 2022 - 13 Oct 2022 |
ACM0008 Version 08.0 |
648,106 |
Yes |
Yes |
8,9,11,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00722 |
Zhangbei Xinglongwa 50MW Solar Power Project (Phase I 30MW) |
China |
12 Dec 2022 - 26 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources” (Version 20.0) |
37686 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00661 |
50 MW Solar Power Project in Pakistan by Gharo Solar Limited |
Pakistan |
5 Dec 2022 - 19 Dec 2022 |
ACM 0002, Version 20 |
57769 |
Yes |
Yes |
1,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00668 |
Suixi Photovoltaic Agricultural Comprehensive Utilization Project (Phase I 40MW) |
China |
5 Dec 2022 - 19 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources” (Version 20.0) |
30837 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00380 |
Shandong Province Bundled Solar Power Project |
China |
15 Sep 2022 - 29 Sep 2022 |
ACM0002 version20.0 |
36,687 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00381 |
Jinchang Xipo 25MW solar power project |
China |
15 Sep 2022 - 29 Sep 2022 |
ACM0002: Grid-connected electricity generation from renewable sources (Version 20.0) |
30,539 |
Yes |
Yes |
SDG 7, 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00553 |
Daheishan Hydropower Station |
China |
27 Oct 2022 - 10 Nov 2022 |
ACM0002 version 20.0 |
553310 |
Yes |
Yes |
#7 #8 #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00386 |
Büget SPP |
Türkiye |
18 Sep 2022 - 2 Oct 2022 |
AMS-I.D: Grid connected renewable electricity generation, Version 18.0 |
11,542 |
Yes |
Yes |
7, 8, 9, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00656 |
18 MWp Solar Power Project in Pakistan by Harappa Solar Private Limited |
Pakistan |
29 Nov 2022 - 13 Dec 2022 |
ACM 0002, Version 20 |
15918 |
Yes |
Yes |
1,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00261 |
Methane Abatement at Baladna Composting Project, Qatar |
Qatar |
7 Jul 2022 - 21 Jul 2022 |
AMS-III.F.: Avoidance of methane emissions through composting - Ver12.0; AMS-III.D: Methane recovery in animal manure management systems Ver 21.0 |
29,332 |
Yes |
Yes |
SDG 8, 12 and 13 |
Silver |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00705 |
BURAK-1 BIOMASS PLANT |
Türkiye |
11 Dec 2022 - 25 Dec 2022 |
GCCM003 v1.0 /ACM0018 ver 5.0 |
316674 |
Yes |
Yes |
7, 8, 9 and 12 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00544 |
Bundled Solar Power Projects by Kıvanç Enerji |
Türkiye |
23 Oct 2022 - 6 Nov 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
15,438 tCO2e/year |
Yes |
Yes |
SDG 4, 5, 7, 8, 9, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00403 |
Xeset 3 |
Lao People's Democratic Republic |
25 Sep 2022 - 9 Oct 2022 |
ACM0002.: Grid-connected electricity generation from renewable sources, Version 20.0 |
48,173 tCO2e |
Yes |
Yes |
SDG 7, 8, 9, 11 and 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00427 |
NamNgum1 Extention |
Lao People's Democratic Republic |
27 Sep 2022 - 11 Oct 2022 |
ACM0002.: Grid-connected electricity generation from renewable sources, Version 20.0 |
214,043 tCO2e |
Yes |
Yes |
SDG 7, 8, 9, 11 and 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00923 |
İnegöl Landfill Gas to Electricity Project |
Türkiye |
15 Mar 2023 - 29 Mar 2023 |
AMS-III.G.: Landfill methane recovery --- Version 10.0 & AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
49850 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00610 |
Emlak Girişim Danışmanlığı A.Ş. Solar Power Projects Bundle 1 |
Türkiye |
20 Nov 2022 - 4 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
14,367 tCO2/year |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00665 |
Emlak Girişim Danışmanlığı A.Ş. Solar Power Projects Bundle 2 |
Türkiye |
5 Dec 2022 - 19 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
14,966 tCO2/year |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00749 |
Inner Mongolia Guyang Hongnijing 100MW wind power project |
China |
22 Dec 2022 - 5 Jan 2023 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
209367 |
Yes |
Yes |
#7 #8 #13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00757 |
Edirne Landfill Gas to Energy Project |
Türkiye |
22 Dec 2022 - 5 Jan 2023 |
AMS-III.G (Version 10.0) and AMS-I.D (Version 18.0) |
15,994 tCO2/year |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00811 |
Feicheng Shengyang 20MW Grid Connected Photovoltaic Power Generation Project |
China |
10 Jan 2023 - 24 Jan 2023 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0) |
23,062 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00548 |
100MWp Photovoltaic Power Generation Project in Caitian Silk Road Mulei Photovoltaic Park |
China |
25 Oct 2022 - 8 Nov 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
101,149 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00751 |
Mevlüt Coşkun Landfill Gas to Electricity Project |
Türkiye |
22 Dec 2022 - 5 Jan 2023 |
AMS-III.G: “Landfill methane recovery” --- Version 10.0 & AMS-I.D: “Grid connected renewable electricity generation” ---Version 18.0 |
10,947 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00731 |
Yangjiawan Hydropower Plant |
China |
14 Dec 2022 - 28 Dec 2022 |
ACM0002 (Version20.0) |
139248 |
Yes |
Yes |
#7 #8 #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00675 |
Junan Municipal Solid Waste Incineration For Power Generation Project |
China |
6 Dec 2022 - 20 Dec 2022 |
ACM0022:Large-scale Consolidated Methodology Alternative waste treatment processes(Version 03.0 |
68264 |
Yes |
Yes |
#7, #8, #9 ,#11,#12 |
Diamond |
N/A |
VERIFICATION |
S00564 |
Taihe Municipal Solid Waste Incineration for Power Generation Project |
China |
31 Oct 2022 - 14 Nov 2022 |
ACM0022:“Alternative waste treatment processes” (Version 3.0) |
41621.32 |
Yes |
Yes |
#4, #7,#8, #9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00706 |
Parque Eolico Tres Hermanas |
Peru |
11 Dec 2022 - 25 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 21.02 |
298,531 |
Yes |
Yes |
3,4,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00775 |
Zhenfa 100MW Solar Power Project |
Pakistan |
3 Jan 2023 - 17 Jan 2023 |
ACM0002: Grid-connected electricity generation from renewable sources; Version 20.0 |
105,921 tCO2e |
Yes |
Yes |
4,7,8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00003(GSC Redone) |
Derinkuyu Solar Power Plant Bundle |
Türkiye |
25 Dec 2020 - 8 Jan 2021 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
19,437 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00010(GSC Redone) |
Renewable Solar Power Project by Mahindra Renewable Private Limited |
India |
15 Jul 2021 - 29 Jul 2021 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 (Approved CDM methodology) |
99,333 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00008 (GSC REDONE) |
70 MW Renewable Solar Power Project by Jakson Power Private Limited (GSC REDONE) |
India |
15 Jul 2021 - 29 Jul 2021 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 (Approved CDM methodology) |
106,437 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00012(GSC Redone) |
Renewable Solar Power Project by Phelan Energy India RJ Private Limited |
India |
15 Jul 2021 - 29 Jul 2021 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 (Approved CDM methodology) |
114,440 |
Yes |
Yes |
1,5,7,8,9,11,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00021 |
Renewable Wind Power Project by Watsun Infrabuild Private Limited |
India |
24 Oct 2021 - 7 Nov 2021 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 (Approved CDM methodology) |
302,922 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00044 |
Çumra Bundled Solar Power Plant |
Türkiye |
14 Dec 2021 - 28 Dec 2021 |
AMS-I.D.: Grid Connected Renewable Electricity Generation---Version 18.0 |
15,439 |
Yes |
Yes |
6,7,11 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00095 |
BIOD Energy India Project |
India |
6 Feb 2022 - 20 Feb 2022 |
ACM0017: Production of biofuel – Version 4.0 |
62,146 tCO2e |
Yes |
Yes |
SDG 1, SDG 3, SDG 5, SDG 7, SDG 8, SDG 9 |
Diamond |
CORSIA(C+) |
GCC ASSESMENT |
S00077 |
Çiğdem Regulators and Hydro Power Plant |
Türkiye |
23 Jan 2022 - 6 Feb 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
23,478 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00075 |
Elbiz Regulator and Hydroelectric Power Plant |
Türkiye |
16 Jan 2022 - 30 Jan 2022 |
AMS-I.D.: "Grid connected renewable electricity generation" (Version 18.0) |
13,486 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00062 |
Mittraphap Wind Farm Project |
Thailand |
9 Jan 2022 - 23 Jan 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
86,011 |
Yes |
Yes |
SDG 7,8,9 and 13 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00059 |
Solar Power Project in Bikaner, Rajasthan by Avaada Sustainable RJProject |
India |
9 Jan 2022 - 23 Jan 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
568,978 tCO2e |
Yes |
Yes |
Goals 1, 3, 4, 5, 6, 7, 8, 13,15 |
Diamond |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00068 |
Solar Power Project in Khamgaon, Maharashtra by Avaada MHKhamgaon |
India |
11 Jan 2022 - 25 Jan 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
90,069 tCO2e |
Yes |
Yes |
Goals 1, 3, 4, 5, 6, 7, 8, 13,15 |
Diamond |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00085 |
Dong Hai 1 Wind Power Project – Phase 1 |
Viet Nam |
26 Jan 2022 - 9 Feb 2022 |
ACM0002 version 20.0 |
151740 |
Yes |
Yes |
5,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00173 |
BAFA WPP |
Türkiye |
13 Apr 2022 - 27 Apr 2022 |
ACM 0002 ver 20.0 |
58336 |
Yes |
Yes |
7, 8 .9 , 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00273 |
Manastır-Esenköy WPP |
Türkiye |
27 Jul 2022 - 10 Aug 2022 |
ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 20 |
69079 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00185 |
Konya SPP |
Türkiye |
21 Apr 2022 - 5 May 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
15556 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
RFR CC INCOMPLETE |
S00134 |
YUREGIR BIOMASS PLANT |
Türkiye |
23 Mar 2022 - 6 Apr 2022 |
ACM0018 |
77,419 |
Yes |
Yes |
7, 8, 9 and 12 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00307 |
İstanbul Wind Power Plant |
Türkiye |
14 Aug 2022 - 28 Aug 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
453,740 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00236 |
Aşağı Kaleköy Hydro Power Plant Project in Genç, Bingöl |
Türkiye |
23 May 2022 - 6 Jun 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
680,822 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00150 |
Masfen-11 Solar Power Plant Bundle |
Türkiye |
31 Mar 2022 - 14 Apr 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
16,490 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00156 |
2M Solar Power Plant Bundle |
Türkiye |
5 Apr 2022 - 19 Apr 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
8,319 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00235 |
Solar project by Winsol Solar Fields (Polepally) Private Limited |
India |
22 May 2022 - 5 Jun 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
17,383 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00183 |
Yahşelli Wind Power Plant |
Türkiye |
20 Apr 2022 - 4 May 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
51,134 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00215 |
Mushishito - Rukarara V hydropower project |
Rwanda |
12 May 2022 - 26 May 2022 |
AMS.I.D Grid connected renewable electricity generation Version 18.0 |
9009 |
Yes |
Yes |
7 |
Bronze |
CORSIA(C+) |
VERIFICATION |
S00493 |
Çarşamba Landfill Gas to Electricity Project |
India |
9 Oct 2022 - 23 Oct 2022 |
AMS-III.G: “Landfill methane recovery” - Version 10.0, AMS-I.D: “Grid connected renewable electricity generation” - Version 18.0 |
12,393 tCO2e |
Yes |
Yes |
5,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00194 |
Solar Project by Ipca Laboratories Ltd. |
India |
24 Apr 2022 - 8 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.0 |
37,568 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00211 |
Renewable wind power project in India -1- 002 |
India |
11 May 2022 - 25 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
221,371 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00898 |
Ecoparque Barra Mansa Landfill Gas to Energy Project |
Brazil |
21 Feb 2023 - 7 Mar 2023 |
ACM0001: Flaring or use of landfill gas --- Version 19.0 |
242563 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00268 |
Atares-2 Wind Power Plant |
Türkiye |
25 Jul 2022 - 8 Aug 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
181,690 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00230 |
100 MWac Sitara Solar PV project |
India |
18 May 2022 - 1 Jun 2022 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, version 3.0 |
206,234 |
Yes |
Yes |
9,8 and 7 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00279 |
12 MW Bundled wind Power Project by Orchid Laminates Private Limited |
India |
31 Jul 2022 - 14 Aug 2022 |
AMS I.D- Grid Connected Renewable electricity Generation-Version 18.0 |
33256 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00430 |
Solar Project in Punjab and Telangana by M/s Macquarie Group Limited |
India |
27 Sep 2022 - 11 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources --- Version 20.02 |
104,665 |
Yes |
Yes |
1,3,4,5,7,8 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00217 |
Renewable Power Project in Jaisalmer, Rajasthan-1 |
India |
12 May 2022 - 26 May 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
2,567,253 |
Yes |
Yes |
3, 4, 6, 7, 8, 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00483 |
Energy saving through efficient street lighting systems by SDMC, New Delhi, India |
India |
6 Oct 2022 - 20 Oct 2022 |
AMS II.L |
53524 |
Yes |
Yes |
1,5,8,11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00472 |
Antalya Kızıllı Landfill Gas to Electricity Project |
Türkiye |
5 Oct 2022 - 19 Oct 2022 |
ACM0001: Flaring or use of landfill gas - Version 19.0 ; ACM0022: Alternative waste treatment processes - Version 3.0 |
353,240 |
Yes |
Yes |
5, 7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00524 |
4.2 MW WIND POWER PROJECT BY AMARJOTHI SPINNING MILLS LIMITED |
India |
19 Oct 2022 - 2 Nov 2022 |
AMS- I.D:Grid connected renewable electricity generation”- Version 18.0 |
8,901 |
Yes |
Yes |
SDG 7, SDG 8, SDG 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00517 |
Hırka WPP |
Türkiye |
16 Oct 2022 - 30 Oct 2022 |
AMS-I.D: Grid connected renewable electricity generation, Version 18.0 |
19,446 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00311 |
Akmezra Obuz Solar Power Plant Bundle |
Türkiye |
15 Aug 2022 - 29 Aug 2022 |
AMS-I D Small Scale Methodology: Grid connected renewable electricity generation V.18.0 |
8,522 |
Yes |
Yes |
SDGs 6,7,8,9,11 and 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00277 |
Renewable Energy Project by Sekura Energy Private Limited |
India |
31 Jul 2022 - 14 Aug 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
131,106 tCO2e |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00492 |
Fit-Süzgeç Solar Power Plant Bundle |
Türkiye |
9 Oct 2022 - 23 Oct 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
7,584 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00324 |
Solar rooftop Projects 4 by fourth partner |
India |
25 Aug 2022 - 8 Sep 2022 |
AMS-I.F. “Renewable electricity generation for captive use and mini-grid” (Version 4.0) |
16248 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00297 |
Yayla Solar Power Plant Bundle |
Türkiye |
9 Aug 2022 - 23 Aug 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
27,853 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00286 |
Difer Solar Power Plant Bundle |
Türkiye |
2 Aug 2022 - 16 Aug 2022 |
AMS-I.D: “Grid connected renewable electricity generation” (Version 18.0) |
10,341 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00301 |
Bayasol 50 MW PV Plant |
Dominican Republic |
10 Aug 2022 - 24 Aug 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0 |
60210 |
Yes |
Yes |
#5, #7, #8 and #9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00466 |
45 MW Bundled Solar Project at Madhya Pradesh and Telangana |
India |
5 Oct 2022 - 19 Oct 2022 |
GCC M001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, Version 3.0. |
75,236 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00394 |
Benban Solar Park Bundled Project 1 |
Egypt |
21 Sep 2022 - 5 Oct 2022 |
GCCM001 “Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers” -Version 3.0 |
220,341 tCO2eq |
Yes |
Yes |
SDG7, SDG8, SDG9, SDG11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00319 |
Atares-1 Wind Power Plant |
Türkiye |
22 Aug 2022 - 5 Sep 2022 |
CDM approved consolidated Methodology ACM0002 (Version 20.0) |
154,369 |
Yes |
Yes |
SDG 7, SDG 8, SDG9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00384 |
Benban Solar Park Bundled Project 2 |
Egypt |
18 Sep 2022 - 2 Oct 2022 |
GCCM001 “Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers” -Version 3.0 |
292,296 tCO2eq |
Yes |
Yes |
SDG7, SDG8, SDG9, SDG11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00467 |
200 MW Solar Project in Tamilnadu |
India |
5 Oct 2022 - 19 Oct 2022 |
GCC M001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, Version 3.0. |
301,663 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00489 |
2.4 MW Solar Project by Wonder Cement in Rajasthan |
India |
9 Oct 2022 - 23 Oct 2022 |
AMS-I.D.: - Grid Connected renewable electricity generation – Version 18.0 |
3602 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00442 |
7.5 MW Wind Power Project |
India |
29 Sep 2022 - 13 Oct 2022 |
AMS-I.D.: - Grid Connected renewable electricity generation – Version 18.0 |
14,084 |
Yes |
Yes |
5,7,8,9 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00767 |
Bundled Rooftop Solar Project by Cepco Industries Pvt. Ltd. |
India |
28 Dec 2022 - 11 Jan 2023 |
AMS I.D- Grid Connected Renewable electricity Generation-Version 18.0 |
4466 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00576 |
Bundled Solar Energy Project in Uttar Pradesh, Telangana and Karnataka |
India |
6 Nov 2022 - 20 Nov 2022 |
ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0 |
145,749 |
Yes |
Yes |
3, 5, 7, 8, 9 & 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00714 |
SEI Adhavan 175MW bundled solar power project in Tamil Nadu and Karnataka, INDIA |
India |
12 Dec 2022 - 26 Dec 2022 |
GCCM001-Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0 - 2022) |
263,970 |
Yes |
Yes |
1,3,4,7,8 and 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00438 |
100 MW solar power project in Partur, Maharashtra |
India |
28 Sep 2022 - 12 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
208,066 |
Yes |
Yes |
SDG 3, SDG 5,SDG 7,SDG 8, SDG 9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00345 |
100 MW solar power project in UP by Tata Power Renewables Energy Limited |
India |
8 Sep 2022 - 22 Sep 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
203050 |
Yes |
Yes |
SDG 3, SDG 5,SDG 7,SDG 8, SDG 9, SDG 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00365 |
150 MW Solar Project in Jaisalmer, Rajasthan |
India |
13 Sep 2022 - 27 Sep 2022 |
ACM0002- Grid-connected electricity generation from renewable sources, Version -20 |
341,129 |
Yes |
Yes |
SDG 9,SDG 8,SDG 7,SDG 5, SDG 3,SDG 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00407 |
Momentum Enerji Solar Power Projects Bundle 1 |
Türkiye |
25 Sep 2022 - 9 Oct 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
13,298 tCO2/year |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00843 |
T Dinamik Solar Power Plant Bundle |
Türkiye |
24 Jan 2023 - 7 Feb 2023 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
96,863 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00672 |
Oxe Energia - ComBio Renewable Energy in Roraima |
Brazil |
6 Dec 2022 - 20 Dec 2022 |
ACM0018 – Electricity generation from biomass in power-only plants version 06.0 |
91.643 |
Yes |
Yes |
7, 9 and 12 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00839 |
Wonder Cement 18 MW Waste Heat Recovery Project in Rajasthan |
India |
23 Jan 2023 - 6 Feb 2023 |
ACM0012:Waste Heat Recovery, Version 6.0 |
97,577 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00504 |
Bayra Regulator and Hydro Power Plant |
Türkiye |
12 Oct 2022 - 26 Oct 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
29,283 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00687 |
7 MW Solar Power Project in Maharashtra |
India |
6 Dec 2022 - 20 Dec 2022 |
AMS I.D Grid-connected renewable electricity generation, Version 18.0 |
10614 |
Yes |
Yes |
5,7,8,9,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00478 |
Fevzipasa-2 Obakoy Bundled Solar Power Plants |
Türkiye |
6 Oct 2022 - 20 Oct 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
15,466.4 |
Yes |
Yes |
SDG-7, SDG-8, SDG-9, SDG-13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00397 |
Benban Solar Park Bundled Project 5 |
Egypt |
22 Sep 2022 - 6 Oct 2022 |
GCCM001 “Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers” -Version 3.0 |
242,463 tCO2eq |
Yes |
Yes |
SDG7, SDG8, SDG9, SDG11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00673 |
Solar Power Project in Rajasthan |
India |
6 Dec 2022 - 20 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
635041 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00745 |
Solar Project Bundle by CCX |
India |
20 Dec 2022 - 3 Jan 2023 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
66,857 |
Yes |
Yes |
SDG # 5,SDG # 7,SDG # 8,SDG # 9, SDG #13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00726 |
42.5 MW Thuan Minh 2 Solar Power Plant in Vietnam |
Viet Nam |
14 Dec 2022 - 28 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
63099 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00640 |
70 MW Wind Power Project by Surya Vidyut Limited |
India |
28 Nov 2022 - 12 Dec 2022 |
ACM0002,Version 21.0 |
167,541 |
Yes |
Yes |
5, 7, 8,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00521 |
200MW Solar Project in Gujarat |
India |
19 Oct 2022 - 2 Nov 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
453411 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00600 |
Aslan Yapı Solar Power Plant Bundle |
Türkiye |
15 Nov 2022 - 29 Nov 2022 |
AMS-I.D: Grid connected renewable electricity generation – Version 18.0 |
12,466 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 11, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00685 |
6 MW Agro Waste based Biomass Project at Garividi Manadal, Andhra Pradesh |
India |
6 Dec 2022 - 20 Dec 2022 |
AMS.I.D.: Grid Connected Renewable Electricity Generation – Version 18.0 |
36,539 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00573 |
Nebras Power & Canadian Renewable Energy Project |
Brazil |
3 Nov 2022 - 17 Nov 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources V20.0 |
397,310 |
Yes |
Yes |
1, 7, 8, 9, 10, 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00329 |
Biomass thermal project in India (006) |
India |
6 Sep 2022 - 20 Sep 2022 |
AMS I.C: Thermal Energy Production with or without electricity -version 22.0 |
83589 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00688 |
Sichuan Ganzi Mozigou Mozi Hydro Power Plant |
China |
6 Dec 2022 - 20 Dec 2022 |
ACM0002 – Grid-connected electricity generation from renewable sources – Version 20.0 |
165853 |
Yes |
Yes |
SDG 7,8,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00760 |
Konya Bundled SPP |
Türkiye |
26 Dec 2022 - 9 Jan 2023 |
AMS-I.D : Grid connected renewable electricity generation - version 18.0 |
14,257 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00724 |
ULU WPP |
Türkiye |
12 Dec 2022 - 26 Dec 2022 |
CDM Approved ACM0002 Grid-connected electricity generation from renewable sources, version 20.0 |
272,244 |
Yes |
Yes |
7, 8, 9, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00358 |
Guangxi Fuchuan Changguang 40MW Wind Power Project |
China |
11 Sep 2022 - 25 Sep 2022 |
ACM0002 Version 20.0 |
52,217 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00357 |
Guangxi Fuchuan Changchun 49.5MW Wind Power Project |
China |
11 Sep 2022 - 25 Sep 2022 |
ACM0002 Version 20.0 |
62,792 |
Yes |
Yes |
#7, #8, #9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00535 |
44 MW wind power project in Madhya Pradesh |
India |
23 Oct 2022 - 6 Nov 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
73,273 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00486 |
50MW Wind Power Project in Rojmal Gujarat |
India |
6 Oct 2022 - 20 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
95859 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00897 |
Biomass based thermal and cogeneration system in Parwanipur, Nepal |
Nepal |
21 Feb 2023 - 7 Mar 2023 |
AMS-I.C. Version-22.0 Thermal energy production with or without electricity |
42633 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00494 |
Tire Bundled SPP |
Türkiye |
9 Oct 2022 - 23 Oct 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
5,287 |
Yes |
Yes |
6, 7, 8, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00488 |
Elbistan-2 Bundled SPP |
Türkiye |
6 Oct 2022 - 20 Oct 2022 |
AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
15,294 |
Yes |
Yes |
6, 7, 8, 11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00715 |
Elbistan-3 SPP |
Türkiye |
12 Dec 2022 - 26 Dec 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
24,703 |
Yes |
Yes |
7, 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00869 |
26 MW Solar Power Project in Punjab |
India |
6 Feb 2023 - 20 Feb 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
40119 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00900 |
20 MW Solar Project in Uttar Pradesh |
India |
22 Feb 2023 - 8 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
28926 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00331 |
Benban Solar Park Bundled Project 6 |
Egypt |
6 Sep 2022 - 20 Sep 2022 |
GCCM001 “Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers” -Version 3.0 |
134,518 tCO2eq |
Yes |
Yes |
SDG7, SDG8, SDG9, SDG11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00614 |
Solar Power Project in Andhra Pradesh - 02 |
India |
20 Nov 2022 - 4 Dec 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
175663 |
Yes |
Yes |
7,8,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00643 |
Bundled Wind Power Project by EKIESL -01-023 |
India |
28 Nov 2022 - 12 Dec 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
17,769 |
Yes |
Yes |
7,8&13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00460 |
100MWp Photovoltaic Power Generation Project in Mulei Tianhui Photovoltaic Park |
China |
2 Oct 2022 - 16 Oct 2022 |
ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0 |
101,148 |
Yes |
Yes |
#7, #8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00584 |
Elmalı WPP |
Türkiye |
8 Nov 2022 - 22 Nov 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
20,441 |
Yes |
Yes |
7,8,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00344 |
Osmaniye Landfill Gas to Energy Project |
Türkiye |
8 Sep 2022 - 22 Sep 2022 |
AMS-III.G (Version 10.0) and AMS-I.D (Version 18.0) |
26,135 tCO2/year |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00360 |
Uğur 1 Bundle SPP |
Türkiye |
11 Sep 2022 - 25 Sep 2022 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
12,985 |
Yes |
Yes |
7,8,9,13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00772 |
9 MW project activity by Brua hydro |
India |
29 Dec 2022 - 12 Jan 2023 |
AMS-I.D.: Grid-connected electricity generation from renewable sources --- Version 18.0 |
42,629 |
Yes |
Yes |
1,5,7,8 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00562 |
Wushi County Wuyibulake River Secondary Hydro Power Plant Project |
China |
31 Oct 2022 - 14 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources( Version 20.0) |
13189 |
Yes |
Yes |
#7, #8,#13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00789 |
TA Greentech Solar Project |
India |
5 Jan 2023 - 19 Jan 2023 |
AMS-1 D, v18.0 |
16,798 (TCO2/Year) |
Yes |
Yes |
Goals 7,8,9,11 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00794 |
Maslaktepe WPP |
Türkiye |
5 Jan 2023 - 19 Jan 2023 |
CDM Approved ACM0002 Grid-connected electricity generation from renewable sources, version 20.0 |
120,151 |
Yes |
Yes |
7, 8, 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00530 |
Xinjiang Gaizi River Gaizi Hydropower Station Project |
China |
20 Oct 2022 - 3 Nov 2022 |
ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
253,974 |
Yes |
Yes |
#4,7,9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00773 |
Philadelphia Solar SPP Bundle-1 |
Jordan |
2 Jan 2023 - 16 Jan 2023 |
AMS-I.F.: Renewable electricity generation for captive use and mini-grid – Version 4 |
6865 |
Yes |
Yes |
SDG 5,SDG 7,SDG 8,SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00774 |
Philadelphia Solar SPP Bundle-2 |
Jordan |
2 Jan 2023 - 16 Jan 2023 |
AMS-I.F.: Renewable electricity generation for captive use and mini-grid – Version 4 |
9841 |
Yes |
Yes |
SDG 5,SDG 7,SDG 8,SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00631 |
10 MW Solar Power Project |
India |
24 Nov 2022 - 8 Dec 2022 |
GCCM001 Methodology for Renewable Energy Generation projects supplying Electricity to Grid or Captive Consumers Version 3.0 |
16,932 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00615 |
Artuklu SPP |
Türkiye |
20 Nov 2022 - 4 Dec 2022 |
AMS-I.D: Grid connected renewable electricity generation, Version 18.0 |
11,697 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00664 |
Bundled Wind Power Project in Tamilnadu, coordinated by VEC-001 |
India |
5 Dec 2022 - 19 Dec 2022 |
AMS I.D. Grid connected renewable electricity generation--- Version 18.0 |
32,310 |
Yes |
Yes |
1,5,7,8,13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00598 |
Biomass thermal project in India (002) |
India |
15 Nov 2022 - 29 Nov 2022 |
AMS I.C. version 22 |
23,127 |
Yes |
Yes |
5,7,8,9,13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00570 |
Mer Saysun Solar Power Plant Bundle |
Türkiye |
3 Nov 2022 - 17 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
47,854 |
Yes |
Yes |
SDGs 6, 7, 8, 9, 11 and 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00770 |
Yalova Biomass Power Plant |
Türkiye |
29 Dec 2022 - 12 Jan 2023 |
AMS-I.D.: Grid connected renewable electricity generation - Version 18.0, AMS-III.G.: Landfill methane recovery – Version 10.0 |
57,453 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 12, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00592 |
90MW Cristalândia Wind Power Project in Brazil by CGN |
Brazil |
14 Nov 2022 - 28 Nov 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
136,162 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00361 |
Energy Efficiency Improvement Project Activity in India |
India |
12 Sep 2022 - 26 Sep 2022 |
AMS-II.C. - Demand-side energy efficiency activities for specific technologies --- Version 15.0 |
21882 tCO2e /annum |
Yes |
Yes |
1,3,4,5,6,7,8,9 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00847 |
144 MW Wind Power Project in Vietnam |
Viet Nam |
24 Jan 2023 - 7 Feb 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
358307 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00802 |
Binh Nguyen Solar Power Project in Vietnam |
Viet Nam |
5 Jan 2023 - 19 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
58,479 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13. |
Gold |
CORSIA(C+) |
VERIFICATION |
S00468 |
Shanxi Junrong 9.8MW Coal Mine Methane Power Generation Project |
China |
5 Oct 2022 - 19 Oct 2022 |
ACM0008 version8.0 |
263,739 |
Yes |
Yes |
#8,#11,#13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00558 |
Hyderabad Metro Rail (MRTS) |
India |
30 Oct 2022 - 13 Nov 2022 |
ACM0016: Mass Rapid Transit Projects --- Version 5.0 |
196,932 |
Yes |
Yes |
SDG 8,9,13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00785 |
Kastamonu Landfill Gas to Electricity Project |
Türkiye |
4 Jan 2023 - 18 Jan 2023 |
AMS-III.G: “Landfill methane recovery” - Version 10.0; AMS-I.D: “Grid connected renewable electricity generation” - Version 18.0 |
27,867 |
Yes |
Yes |
7, 8, 13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00776 |
Kozan Bundled SPP |
Türkiye |
3 Jan 2023 - 17 Jan 2023 |
AMS-I.D: Grid connected renewable electricity generation, Version 18.0 |
14,321 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00571 |
Gülşehir Ulupınar Solar Power Plant Bundle |
Türkiye |
3 Nov 2022 - 17 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
36,741 |
Yes |
Yes |
SDGs 6, 7, 8, 9, 11 and 13 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00491 |
Zongshang Hydro Power Project in Sichuan |
China |
9 Oct 2022 - 23 Oct 2022 |
ACM0002 Grid-connected electricity generation from renewable sources (Version 20.0) |
95345 |
Yes |
Yes |
7.8.9.11 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00836 |
Bundled 1 Solar Power Project in India |
India |
19 Jan 2023 - 2 Feb 2023 |
GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers version 4.0 |
27753 |
Yes |
Yes |
1,7,8 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00920 |
70 MW Kayakulam Floating Solar PV Project |
India |
9 Mar 2023 - 23 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
152169 |
Yes |
Yes |
SDG7, SDG8, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00889 |
140 MW Bilhaur Solar PV Project |
India |
20 Feb 2023 - 6 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
290271 |
Yes |
Yes |
SDG7, SDG8, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00913 |
150 MW Devikot-I Solar PV Project |
India |
6 Mar 2023 - 20 Mar 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version-21.0 |
317942 |
Yes |
Yes |
SDG7, SDG8, SDG13 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00676 |
Yanji Municipal Solid Waste Incineration For Power Generation Project |
China |
6 Dec 2022 - 20 Dec 2022 |
ACM0022:Large-scale Consolidated Methodology Alternative waste treatment processes(Version 03.0 ) |
71339 |
Yes |
Yes |
#7, #8, #9 ,#11,#12 |
Diamond |
N/A |
VERIFICATION |
S00784 |
Brigida and Bon Nome Renewable Energy Project |
Brazil |
4 Jan 2023 - 18 Jan 2023 |
ACM0002 – Grid-connected electricity generation from renewable sources V20.0 |
123,115 |
Yes |
Yes |
1, 7, 8, 9 10 and 11 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00552 |
Biomass thermal project in India (007) |
India |
27 Oct 2022 - 10 Nov 2022 |
AMS I.C: Thermal Energy Production with or without electricity -version 22.0 |
107418 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00852 |
Thailand Solar Bundle 1 by Super Energy Corp |
Thailand |
29 Jan 2023 - 12 Feb 2023 |
AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
396826 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00742 |
Korudağı WPP |
Türkiye |
20 Dec 2022 - 3 Jan 2023 |
AMS-I.D.: Grid Connected Renewable Electricity Generation --- Version 18.0 |
29,033 |
Yes |
Yes |
SDG 7, SDG 8, SDG 9, SDG 13 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00782 |
Thinh Long Solar Power Project |
Viet Nam |
4 Jan 2023 - 18 Jan 2023 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 21.0 |
59,938 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00590 |
330 MW Solar Power project in Piauí by CGN |
Brazil |
14 Nov 2022 - 28 Nov 2022 |
ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
258,927 |
Yes |
Yes |
SDG 5, SDG 7, SDG 8, SDG 9, SDG 13. |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00595 |
Tianquan Shengli Hydropower Project |
China |
14 Nov 2022 - 28 Nov 2022 |
ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
102,687 |
Yes |
Yes |
7, 8, 9 |
Gold |
CORSIA(C+) |
VERIFICATION |
S00792 |
Bundled Solar Project in Tamil Nadu by Enerjay Green |
India |
5 Jan 2023 - 19 Jan 2023 |
GCCM001: Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, version 3.0 |
39,274 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00727 |
Bundled Solar PV Project by L.S. Mills |
India |
14 Dec 2022 - 28 Dec 2022 |
GCCM001: Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers, version 3.0 |
56,334 |
Yes |
Yes |
7,8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00414 |
BEUAS ANIMAL MANURE METHANE RECOVERY AND UTILIZATION PLANT |
Türkiye |
26 Sep 2022 - 10 Oct 2022 |
AM0073: GHG emission reductions through multi-site manure collection and treatment in a central plant - Version 1.0 |
274,902 |
Yes |
Yes |
7, 8, 12, 17 |
Platinum |
CORSIA(C+) |
VERIFICATION |
S00327 |
50 MW Solar Project |
India |
31 Aug 2022 - 14 Sep 2022 |
ACM0002 Version 20.0 |
97,400 (TCO2/Year) |
Yes |
Yes |
Goals 3,4,7,8,15 |
Diamond |
CORSIA(C+) |
VERIFICATION |
S00868 |
Mount Coffee hydropower project |
Liberia |
6 Feb 2023 - 20 Feb 2023 |
ACM0002 |
117178 |
Yes |
Yes |
# 7 # 8 |
Silver |
CORSIA(C+) |
VERIFICATION |
S00683 |
70.6 MW Bundled Solar Project |
India |
6 Dec 2022 - 20 Dec 2022 |
ACM0002 Version 20.0 |
136,260 (TCO2/Year) |
Yes |
Yes |
Goals 4, Goal7, Goal8, Goal9, Goal15 |
Diamond |
CORSIA(C+) |
VERIFICATION |