PROJECT DETAILS

Project Submission No. S00051
Project Title Esme Bundled SPP
Project Owner(s) (as per PSF & LOA) Tunçmatik Enerji Yatırımları A.Ş.
Submission Date 2021-12-03
Global Stakeholder Consultation Period 2021-12-21 to
2022-01-04
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AMS-I.D : Grid connected renewable electricity generation---Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 15,502
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Türkiye
Focal Point of Project Owners
Life Iklim ve Enerji Ltd. Sti.
Email of Contact Person of FP (Primary) ramazan.aslan@lifeenerji.com
Email of Contact Person of FP (Secondary) m.ozer@tuncmatik.com
Name of Authorized External Representative Organization Life İklim ve Enerji Ltd. Şti.
Name of Focal Point of External Representative Ramazan Aslan
Email-id of External representative ramazan.aslan@lifeenerji.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet
Project Brief

Esme Bundled SPP consists of 14 individual Unlicensed (In Türkiye, electricity generation from renewable energy sources is divided into two; licensed and unlicensed generation. Unlicensed electricity generation plants must have equal or less than 1 MW installed capacity. Photovoltaic Solar Power Plants (herein after referred as SPP) and their total installed capacity is 12.796 MW. All SPPs were established in the accordance with the Turkish law of Electricity Market (Law Number: 6446, ratified on 14/03/2013 by Grand National Assembly of Türkiye, enacted on 30/03/2013 by President of Türkiye, authored by Grand National Assembly of Türkiye). The electricity produced by the project activity will result in an expected emission reduction of 154,719 tons of CO2e for fixed 10-years crediting period. 14 SPPs are located in Ahmetler and Beylerhan villages, in Eşme and central districts, in Uşak province of Türkiye. The project aims to contribute to reducing national energy deficit and development of local industries as it allows the use of Renewable energy for industry and gain advantage in a competitive environment.

 