Project Submission No. | S00050 |
---|---|
Project Title | Dinar Bundled SPP |
Project Owner(s) (as per PSF & LOA) | Tunçmatik Enerji Yatırımları A.Ş. |
Submission Date | 2021-12-03 |
Global Stakeholder Consultation Period |
2021-12-16 to 2021-12-30 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 5,955 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Life Iklim ve Enerji Ltd. Sti. |
Email of Contact Person of FP (Primary) | ramazan.aslan@lifeenerji.com |
Email of Contact Person of FP (Secondary) | m.ozer@tuncmatik.com |
Name of Authorized External Representative Organization | Life İklim ve Enerji Ltd. Şti. |
Name of Focal Point of External Representative | Ramazan Aslan |
Email-id of External representative | ramazan.aslan@lifeenerji.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Dinar Bundled Solar Power Plant consists of 5 individual unlicensed photovoltaic solar power plants and its total install capacity is 4.966 MWe. The plant was established in the accordance with the law of Electricity Market (Law no: 6446). The electricity produced by project activity will result in average emission reduction of 59,550 tons of CO2e for fixed crediting period. 5 individual facilities are located in 3 different provinces of Turkey such as Afyon, Karaman, and Niğde. The annual energy generation capacity is calculated to be approximately 9,187.11 MWh. The project aims to contribute to reducing national energy deficit and development of local industries as it allows the use of cheaper energy for industrialists and gain advantage in a competitive environment.
|
---|