Project Submission No. | S00422 |
---|---|
Project Title | Solar Power Project by ES Energy |
Project Owner(s) (as per PSF & LOA) | ES Energy Private Limited |
Submission Date | 2022-06-20 |
Global Stakeholder Consultation Period |
2022-09-26 to 2022-10-10 |
Registration Date | 2023-11-29 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | AMS-I.D. Grid connected renewable electricity generation; Version 18.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Verified GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Verified E+ Label | Yes |
Forecasted S+ Label | Yes |
Verified S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Verified SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Verified SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Verified Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
India
|
---|---|
Focal Point of Project Owners
|
Emergent Ventures India Pvt. Ltd. |
Email of Contact Person of FP (Primary) | atul.sanghal@emergent-ventures.com |
Email of Contact Person of FP (Secondary) | jatin@emergent-ventures.com |
Name of Authorized External Representative Organization | Emergent Ventures India Pvt. Ltd. |
Name of Focal Point of External Representative | Atul Sanghal |
Email-id of External representative | atul.sanghal@emergent-ventures.com |
Project Verifier | Carbon Check (India) Private Limited |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
Request for Registration Form | Registration Form |
Project Brief | The purpose of project activity is to generate and feed GHG free electricity by the installation of solar power plant having a capacity of 10 MWac to the connected national electricity grid of India. The proposed solar power project is located at Tumkur in the state of Karnataka, India. The project has been developed by ES Energy Private Ltd. The power is supplied to Mangalore Electricity Supply Company Limited (MESCOM). The project is developed on land procured by the PO from the local landowners on commercial terms. |
---|
Report (Public) | Verification Report (public) |
---|---|
Verification report date | 2023-11-09 |
First Request for Registration Date | 2023-06-07 |
Opinion | CCIPL was contracted by Emergent Ventures India Pvt. Ltd and ES Energy Private Limited /34/ on 13/10/2022 for project verification of the project activity title “Solar Power Project by ES Energy” in India. The project verification was performed based on rules and requirements defined by GCC for the project activity. The proposed project activity is a solar power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring AMS-I.D. Grid connected renewable electricity generation; Version 18.0 /B01/ and is assessed against latest valid Project Standard /B02-1/, Verification Standard /B02-2/, Environment and Social Safeguards Standard /B02-4/, Project-Sustainability-Standard /B02-5/ and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms. (b) Is likely to generate 178,272 MWh of electricity (for the fixed 10 years crediting period), as indicated in the PSF version 1.6 /01-g/, which are generated from existing baseline scenario of the national grid of India in the absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity. |