Project Submission No. | S00349 |
---|---|
Project Title | Benban Solar Park Bundled Project 4 |
Project Owner(s) (as per PSF & LOA) | Access Egypt Solar One SAE; Access Building Energy Solar One SAE; First Climate (Switzerland) AG |
Submission Date | 2022-06-13 |
Global Stakeholder Consultation Period |
2022-09-08 to 2022-09-22 |
Registration Date | 2023-12-07 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | GCCM001 “Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers” -Version 3.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Verified GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Verified E+ Label | Yes |
Forecasted S+ Label | Yes |
Verified S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Verified SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Verified SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Verified Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
Egypt
|
---|---|
Focal Point of Project Owners
|
First Climate (Switzerland) AG |
Email of Contact Person of FP (Primary) | focalpoint@firstclimate.com |
Email of Contact Person of FP (Secondary) | yves.keller@firstclimate.com |
Project Verifier | Carbon Check (India) Private Limited |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
Request for Registration Form | Registration Form |
Project Brief | Proposed project (Benban Solar Park Bundled Project 4) represents the Bundled Project consisting of 2 similar 50 MW Photovoltaic (PV) plants (“Activities”) located in Benban region (Egypt) and operated by different legal owners. The activities included in the bundle are of homogeneous nature which facilitates the collective establishment of baseline, emission reductions calculation, additionality demonstration and assessment of certification labels for the project activities in a bundle. The proposed project activities’ main goal is a production of the clean electricity and delivery of this electricity to the Egyptian national power grid in order to reduce the consumption of the fossil fuels in Egypt. |
---|
Report (Public) | Verification Report (public) |
---|---|
Verification report date | 2023-11-17 |
First Request for Registration Date | 2023-06-14 |
Opinion | CCIPL was contracted by Project Owner, First Climate (Switzerland) AG on 25/10/2022 for project verification of the bundled project activity “Benban Solar Park Bundled Project 4” in Egypt. The project verification was performed based on rules and requirements defined by GCC for the bundled project activity. The bundled project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the bundled project activity are estimated to be 143,910 tCO2e/year over the 10 years crediting period starting from 20/04/2019. |