Project Submission No. | S00035 |
---|---|
Project Title | Armutlu Bundled Solar Power Plant |
Project Owner (as per PSF & LOA) | 1. Panel Enerji A.Ş. 2. Algiz Enerji A.Ş. |
Focal Point of Project Owners*(FP)
|
Life Iklim ve Enerji Ltd. Sti. |
Email of Contact Person of FP (Primary) | ramazan.aslan@lifeenerji.com |
Email of Contact Person of FP (Secondary) | umitnuri.yildiz@alarko.com.tr |
Country | Türkiye |
Submission Date | 12 Nov 2021 |
Global Stakeholder Consultation Period | 7 Dec 2021 - 21 Dec 2021 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | AMS-I.D.: Grid Connected Renewable Electricity Generation---Version 18.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 18, 435 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 7,8 |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | Life İklim ve Enerji Ltd. Şti. |
Name of Focal Point of External Representative | Ramazan Aslan |
Email-id of Focal Point | ramazan.aslan@lifeenerji.com |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Armutlu Bundled Solar Power Plant consists of 15 individual Unlicensed Photovoltaic Solar Power Plants and its total install capacity is 14.85 MWe. The plant was established in the accordance with the law of Electricity Market (Law no: 6446).15 individual facilities are located in 3 different provinces of Turkey such as Niğde, Konya and Aksaray, and these provinces are not far from each other in terms of proximity. The project aim to contribute to reducing national energy deficit and development of local industries as it allows the use of cheaper energy for industrialists and gain advantage in a competitive environment.The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. The average annual generated energy is expected to be 28.44 GWh and the project will be able to deliver a reduction in emissions of around 18,435 tCO2e (tons of carbon dioxide equivalent) per annum. |
---|---|
Additional Information |