Project Submission No. | S00035 |
---|---|
Project Title | Armutlu Bundled Solar Power Plant |
Project Owner(s) (as per PSF & LOA) | 1. Panel Enerji A.Ş. 2. Algiz Enerji A.Ş. |
Submission Date | 2021-11-12 |
Global Stakeholder Consultation Period |
2021-12-07 to 2021-12-21 |
Registration Date | 2023-10-25 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | AMS-I.D.: Grid Connected Renewable Electricity Generation---Version 18.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 18,435 |
Verified GHG Emission Reduction (tCO2e/Year) | 18,435 |
Forecasted E+ Label | Yes |
Verified E+ Label | Yes |
Forecasted S+ Label | Yes |
Verified S+ Label | Yes |
Forecasted SDG+ Goals | |
Verified SDG+ Goals | |
Forecasted SDG+ Label | Silver |
Verified SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Verified Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Life Iklim ve Enerji Ltd. Sti. |
Email of Contact Person of FP (Primary) | ramazan.aslan@lifeenerji.com |
Email of Contact Person of FP (Secondary) | umitnuri.yildiz@alarko.com.tr |
Name of Authorized External Representative Organization | Life İklim ve Enerji Ltd. Şti. |
Name of Focal Point of External Representative | Ramazan Aslan |
Email-id of External representative | ramazan.aslan@lifeenerji.com |
Project Verifier | EPIC SUSTAINABILITY SERVICES PRIVATE LIMITED |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
Request for Registration Form | Registration Form |
Project Brief | Armutlu Bundled Solar Power Plant consists of 15 individual Unlicensed Photovoltaic Solar Power Plants and its total install capacity is 14.85 MWe. The plant was established in the accordance with the law of Electricity Market (Law no: 6446).15 individual facilities are located in 3 different provinces of Turkiye such as Niğde, Konya and Aksaray, and these provinces are not far from each other in terms of proximity. The project aim to contribute to reducing national energy deficit and development of local industries as it allows the use of cheaper energy for industrialists and gain advantage in a competitive environment.The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. The average annual generated energy is expected to be 28.44 GWh and the project will be able to deliver a reduction in emissions of around 18,435 tCO2e (tons of carbon dioxide equivalent) per year. |
---|
Report (Public) | Verification Report (public) |
---|---|
Verification report date | 2023-10-04 |
First Request for Registration Date | 2022-06-30 |
Opinion | The GCC Project Verifier [EPIC Sustainability Services Private Limited], certifies the following with respect to the GCC Project Activity [Armutlu Bundled Solar Power Plant]. The Project Owner has correctly described the Project Activity in the Project Submission Form (version 11, dated 18.09.2023) including the applicability of the approved methodology AMS-I.D Small-Scale Methodology: Grid-connected renewable electricity generation from, Ver. 18.0 and meets the methodology applicability conditions and is expected to achieve the forecasted real, measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reductions estimates correctly and conservatively. The Project Activity is likely to generate GHG emission reductions amounting to the estimated 18,435 tCO2e per year, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3. Project Activity is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and is likely to achieve the Environmental No-net-harm Label (E+) and Social No-net-harm Label (S+) The Project Activity is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), complies with the Project Sustainability Standard, and contributes to achieving a total of [03] SDGs, with the Silver SDG certification label (SDG+). The Project Activity complies with all the applicable requirements of the GCC Program and ICAO‟s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.3 paragraph 21-23, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project. The Project Activity complies with all the applicable GCC rules and therefore recommends GCC Program to register the Project activity with above mentioned labels. |