PROJECT DETAILS

Project Submission No. S00596
Project Title Huong Tan Wind Farm - Tan Linh Wind Farm
Project Owner(s) (as per PSF & LOA) Huong Tan Wind Power Joint Stock Company and Monsoon Carbon Pte Ltd
Submission Date 2022-06-11
Global Stakeholder Consultation Period 2022-11-15 to
2022-11-29
Registration Date 2025-02-21
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002 v21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 242,337
Verified GHG Emission Reduction (tCO2e/Year) 242,337
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Gold
Verified SDG+ Label Gold
Forecasted Market Eligibility
Verified Market Eligibility
Location Details Open Full Map
Country
 Viet Nam
Focal Point of Project Owners
Monsoon Carbon Pte Ltd
Email of Contact Person of FP (Primary) amcewin@monsooncarbon.com
Email of Contact Person of FP (Secondary) carbon@monsooncarbon.com
Project Verifier Carbon Check (India) Private Limited
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Request For Registration Documents Verified Project Submision
Other Verified Documents
Request for Registration Form Registration Form
Project Brief

The purpose of this Bundled Project Activity is to generate clean electricity from the installation of wind turbine generators and supply the generated electricity to the existing power grid managed by Viet Nam Electricity Power Generation Corporation (EVN), the state-owned power company in Viet Nam.
The Bundled Project Activity involves the installation of two wind power projects in the Huong Tan, Tan Hop and Huong Linh communes, Huong Hoa district, Quang Tri province, Viet Nam. The Bundled Project Activity title is Huong Tan Wind Farm - Tan Linh Wind Farm (or ‘Project Activity’) with a total of 92.4 MW capacity (46.2 MW each) with 22 wind turbine generators (11 WTGs each).

VERIFICATION OUTCOME
Report (Public) Verification Report (public)
Verification report date 2025-01-03
First Request for Registration Date 2023-11-16
Opinion

Carbon Check (India) Private Limited (CCIPL) has been contracted by Monsoon Carbon Pte. (Entity having authorization of Project Owners) as per contract no. CCIPL1596/GCC/VAL/HTWF/20221006, dated 09/12/2022 to undertake the independent project verification of the GCC project activity titled “Huong Tan Wind Farm - Tan Linh Wind Farm” (hereafter the project). The objectives of this project verification is to verify that the GCC project meets the requirements of GCC project framework v2.1, GCC program manual v3.1, GCC program processes v4.0, GCC project standard v3.1, GCC project sustainability standard v3.1, GCC verification standard v3.1, GCC Environment & Social safeguards standard v3.0, ISO 14064-2 & ISO 14064-3, applicable approved CDM Methodology ACM0002: Grid-connected electricity generation from renewable sources, version 21.0, Applicable Legal requirements/rules of host country, National Sustainable Development Criteria and other GCC  requirements related to aspects such as project design, applicability conditions, project boundary, baseline scenarios, additionality, emission reduction, monitoring plan, local stakeholder consultation, global stakeholder consultation, GHG emission reductions (ACCs), environmental no-net harm label (E+), social no net harm label (S+), Gold SDG label (SDG+). This report summarizes the final project verification opinion which is based on final PSF /2/. 
The GCC project activity involved the construction and operation of two (02) Greenfield 46.2 MW wind power plants in Vietnam. The expected net annual electricity generation of the project activity is approximately 294,464 MWh/year. The electricity thus generated will be sold to the Vietnam National Grid. In the absence of the project activity, the equivalent amount of electricity would be supplied from GHG intensive national grid. The emission reduction will be based on the amount of baseline electricity avoided due to the project and is calculated using the applied CDM Methodology for “Grid-connected electricity generation from renewable sources” ACM0002 v21.0.
The project verification team has verified that the information submitted by the project owners is correct and that the emission reduction achieved has been determined correctly. Based on the information seen and evaluated, the project verification team has requested for registration to GCC Steering Committee by confirming the following:

Project title:    Huong Tan Wind Farm - Tan Linh Wind Farm (project submission reference no: S00596)

Sector and Methodology used Sectoral Scope 1: Energy Industries (renewable/non-renewable sources) Approved CDM Methodology for “Grid-connected electricity generation from renewable sources” ACM0002 v21.0. The Project Owners have correctly described the Project Activity in the Project Submission Form (version 2.4, dated 30/12/2024) including the applicability of the approved CDM methodology ACM0002, v21.0 and meets the methodology applicability conditions and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reductions estimates correctly and conservatively.

Estimated Emissions reductions : The Project Activity is likely to generate GHG emission reductions amounting to the estimated 242,337 tCO2e per year, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3.

Voluntary labels: The Project Activity is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard and is likely to achieve the Environmental No-net-harm Label (E+) and Social No-net-harm Label (S+). 
The Project Activity is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), complies with the Project Sustainability Standard, and contributes to achieving a total of 4 SDGs, with the Gold SDG certification label (SDG+).
 