Project Submission No. | S00384 |
---|---|
Project Title | Benban Solar Park Bundled Project 2 |
Project Owner (as per PSF & LOA) | First Climate (Switzerland) AG; CTGI Renewable Energy Egypt Solar 1; Aten Solar Energy; Delta for Renewable Energy; Horus Solar Energy |
Submission Date | 8 Jun 2022 |
Global Stakeholder Consultation Period | 18 Sep 2022 - 2 Oct 2022 |
Registration Date | 28 Nov 2023 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | GCCM001 “Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers” -Version 3.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 285,050 (tCO2e/Year) |
Verified GHG Emission Reduction (tCO2e/Year) | 285,050 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Verified E+ Label | Yes |
Forecasted S+ Label | Yes |
Verified S+ Label | Yes |
Forecasted SDG+ Goals | |
Verified SDG+ Goals | |
Forecasted SDG+ Label | Silver |
Verified SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Verified Market Eligibility | CORSIA(C+) |
Location Details Open Full Map
|
|
Country | Egypt |
---|---|
Focal Point of Project Owners (FP)
|
First Climate (Switzerland) AG |
Email of Contact Person of FP (Primary) | focalpoint@firstclimate.com |
Email of Contact Person of FP (Secondary) | yves.keller@firstclimate.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
Request for Registration Form | Registration Form |
Project Verifier | carboncheck_cert |
Project Brief | The Project Activities are part of the Benban Solar Park, currently consisting of 41 different PV plants with the total installed capacity of 1,650 MWh. The total capacity of the proposed Bundled Project is 200 MW. Each Activity under the Bundled Project is a 50 MW PV Plant utilizing solar energy via the photovoltaic panels for production of renewable electricity and feeding it into the national power grid of Egypt. In the absence of the proposed Bundled Project, the electricity delivered to the grid by the PV Plants of the proposed Bundled Project would have been produced by the operation of gridconnected power plants and by the addition of new generation sources to the national power grid. |
---|---|
Additional Information |
Opinion | CCIPL was contracted on 27/01/2023 /42/ by First Climate (Switzerland) AG for project verification of the project activity “Benban Solar Park Bundled Project 2” in Egypt. The project verification was performed based on rules and requirements defined by GCC for the project activity. The GCC Project Verifier, Carbon Check (India) Private Ltd, has verified and certifies that the GCC Project Activity “Benban Solar Park Bundled Project 2” in Egypt”. |
---|---|
Report (Public) | Verification Report (public) |
Verification report date | 2023-11-10 |
First Request for Registration Date | 2023-07-24 |