Project Title Zhaoqing Ma’an LFG Power Generation Project
Project Owner (as per PSF & LOA) Chengdu Xiangche Technology Limited
Focal Point of Project Owners*(FP)
Chengdu Xiangche Technology Limited
Email of Contact Person of FP (Primary) general@xche.tech
Email of Contact Person of FP (Secondary) keithg@xche.tech
Country People's Republic of China
Submission Date 7 Jun 2022
Global Stakeholder Consultation Period 26 Oct 2022 - 9 Nov 2022
Sector 13.Waste handling and disposal
GCC/CDM Methodology & Version ACM0001: Flaring or use of landfill gas ( Version19.0)
Forecasted GHG Emission Reduction(TCO2/Year) 60,465
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals 7,8,13
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet,
Project Brief

Zhaoqing Ma'an LFG Power Generation Project (hereafter referred to as the Project) is an LFG power generation project with total installed capacity of 2MW, locates at Zhaoqing,City Guangdong Province, in People's Republic of China. The project installs 2 sets of LFG generators with unit capacity of 1,000 kW. The purpose of the project is to recover the landfill gas at Phase II of Ma'an landfill site and utilize LFG to generate and supply electricity to China South Power Grid (CSPG). 

Phase I of Ma'an landfill site started operation since 1993 and was closed in 2014. Phase II of Ma'an landfill site started operation since October in 2014 and can handle 900 tonnes of MSW per day when running at its full capacity. The total storage capacity of phase II of Ma'an landfill site reaches 1.1 million cubic metres and the phase II of Ma'an landfill site was closed in April 2020.

The project will achieve green-house gas emissions reduction from two sources: 1) Methane (CH4) emissions from the previously vented landfill gas which will be captured and destroyed by the project; 2) CO2 emissions from the production of electricity by the Project which would otherwise have been generated by the fossil fuel fired power plants of China South Power Grid (CSPG). The project is expected to achieve an annually average emission reduction of 60,465 tCO2e. The total emission reductions during the fixed 10-year crediting period will be 604,653 tCO2e.

The project is expected to contribute to 3 SDGs which are SDG 7, 8 and 13.