Project Submission No. | S00031 |
---|---|
Project Title | Sucatagi Solar Power Plant Bundle |
Project Owner(s) (as per PSF & LOA) | Toprak Yenilenebilir Enerji San. Tic. A.Ş. |
Submission Date | 2021-11-04 |
Global Stakeholder Consultation Period |
2021-11-30 to 2021-12-14 |
Registration Date | 2023-01-22 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | AMS-I.D.: Grid connected renewable electricity generation---Version 18.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Verified GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Verified E+ Label | Yes |
Forecasted S+ Label | Yes |
Verified S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Verified SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Verified SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Verified Market Eligibility | C+ - Pilot Phase |
Country |
Türkiye
|
---|---|
Focal Point of Project Owners
|
Life Iklim ve Enerji Ltd. Sti. |
Email of Contact Person of FP (Primary) | ramazan.aslan@lifeenerji.com |
Email of Contact Person of FP (Secondary) | info@tye.com.tr |
Name of Authorized External Representative Organization | Life İklim ve Enerji Ltd. Şti. |
Name of Focal Point of External Representative | Ramazan Aslan |
Email-id of External representative | ramazan.aslan@lifeenerji.com |
Project Verifier | Earthood Services Private Limited |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
Request for Registration Form | Registration Form |
Project Brief | Toprak Yenilenebilir Enerji San. Tic. A.Ş. (hereafter referred to as “Toprak Yenilenebilir Enerji”) invested into a new Solar Power Project called Sucatagı Solar Power Plant Bundle Project (hereafter referred to as the “Project” or “Sucatagı SPP”). Sucatagı SPP involves installation and operation of 7 unlicensed (FORTUNA 3, FORTUNA 4, FORTUNA 5, FORTUNA 6, FORTUNA 7, FORTUNA 8 and EFOR 2) solar power projects. Solar panels, inverters and power transmission lines were intended to be built on an area of 20,892 m2 in Aktaş Region of Niğde Province, and 102,253 m2 in Sucatagı Region of Ağrı Province. The total capacity of the project is 6.93 MWe6. Electricity generated from Sucatagı Solar Power Plant Bundle is connected to the national grid through the energy transmission line (4 km 3x477 MCM 33 kV) to the F-2 cell of the Ağrı-2 380 Distribution Center in Ağrı, and to the F-5 cell of the Niğde-2 Distribution Center in Niğde. An estimated net electricity generation of 12,805 MWh per year by the efficient utilization of the available solar energy by project activity replace the grid electricity, which is constituted of different fuel sources, mainly fossil fuels. The electricity produced by project activity results in a total emission reduction of 8,300 tonnes of CO2e/year. The total emission reduction by the project activity is estimated to be 83,000 tonnes of CO2e for the crediting period. |
---|
Report (Public) | Verification Report (public) |
---|---|
Verification report date | 2023-01-04 |
First Request for Registration Date | 2022-05-18 |
Opinion | The project activity is about installation and operation of solar photovoltaic power plants bundle in the Republic of Turkey. The project consists bundle of seven solar power plant installations at two sites located at Ağrı and Niğde provinces of Turkey. The installation at Ağrı site consist of 6 Nos of identical solar power plants having total electricity generation capacity 5.94 MWe (0.99 MWe each) and installation at Niğde site consistent a single solar power plant of 0.99 MWe capacity. The total generation capacity of the project activity is 6.93 MWe considering all seven plants. |