PROJECT DETAILS

Project Submission No. S00741
Project Title Guangzhou Xingfeng Landfill Gas for Power Generation Project
Project Owner (as per PSF & LOA) ASIA CARBON ASSET LIMITED
Submission Date 2 Jun 2022
Global Stakeholder Consultation Period 2022-12-19 - 2023-01-02
Sector 13.Waste handling and disposal
Project Type LFG Power Generation
GCC/CDM Methodology & Version ACM0001- Flaring or use of landfill gas, Version 19.0
Forecasted GHG Emission Reduction (tCO2e/Year) 85,110 (tCO2e/Year)
Verified GHG Emission Reduction (tCO2e/Year) (tCO2e/Year)
Forecasted E+ Label Yes
Verified E+ Label
Forecasted S+ Label Yes
Verified S+ Label
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Gold
Verified SDG+ Label
Forecasted Market Eligibility
Verified Market Eligibility
Location Details Open Full Map
Country China
Focal Point of Project Owners (FP)
Asia Carbon Asset Limited
Email of Contact Person of FP (Primary) aca-michelle@hotmail.com
Email of Contact Person of FP (Secondary) qinxizhang@hotmail.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet
Project Brief

Guangzhou Xingfeng Landfill Gas for Power Generation Project, which was invested, developed and operated by Guangzhou Huantou Environmental Service Co., Ltd., is a project to utilize LFG extracted from an existing landfill as gaseous fuel for power generation. The Project was constructed at Xingfeng Landfill, which is situated at Xingfeng Village, Taihe Town, Baiyun District, Guangzhou City, Guangdong Province, P.R. China.

The purpose of the Project is to destroy LFG produced by Xingfeng Landfill’s No.6 and No.7 landfill sites through using LFG as gaseous fuel for power generation. The construction of the Project was started on 15/09/2018 and completed on 25/01/2019 and began its business operation on the same day. The Project installed 3 sets of gas fired engine and generator with 2MW of power generation capacity for each, given 6MW of installed capacity in total. The electricity generated by the Project is delivered to the Guangdong Grid, a sub-grid of China Southern Power Grid (CSPG), or to the customers who would have to import electricity from the grid. The annual average of net electricity supplied to the grid by the Project is estimated to be 32,651MWh, which will achieve 85,110 tCO2e of emission reductions per annum.

Additional Information