Project Submission No. | S00741 |
---|---|
Project Title | Guangzhou Xingfeng Landfill Gas for Power Generation Project |
Project Owner (as per PSF & LOA) | ASIA CARBON ASSET LIMITED |
Focal Point of Project Owners*(FP)
|
Asia Carbon Asset Limited |
Email of Contact Person of FP (Primary) | aca-michelle@hotmail.com |
Email of Contact Person of FP (Secondary) | qinxizhang@hotmail.com |
Country | China |
Submission Date | 2 Jun 2022 |
Global Stakeholder Consultation Period | 19 Dec 2022 - 2 Jan 2023 |
Sector | 13.Waste handling and disposal |
GCC/CDM Methodology & Version | ACM0001 Version 19.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 85,110 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | #7, #8,#9 |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Guangzhou Xingfeng Landfill Gas for Power Generation Project, which was invested, developed and operated by Guangzhou Huantou Environmental Service Co., Ltd., is a project to utilize LFG extracted from an existing landfill as gaseous fuel for power generation. The Project was constructed at Xingfeng Landfill, which is situated at Xingfeng Village, Taihe Town, Baiyun District, Guangzhou City, Guangdong Province, P.R. China. The purpose of the Project is to destroy LFG produced by Xingfeng Landfill’s No.6 and No.7 landfill sites through using LFG as gaseous fuel for power generation. The construction of the Project was started on 15/09/2018 and completed on 25/01/2019 and began its business operation on the same day. The Project installed 3 sets of gas fired engine and generator with 2MW of power generation capacity for each, given 6MW of installed capacity in total. The electricity generated by the Project is delivered to the Guangdong Grid, a sub-grid of China Southern Power Grid (CSPG), or to the customers who would have to import electricity from the grid. The annual average of net electricity supplied to the grid by the Project is estimated to be 32,651MWh, which will achieve 85,110 tCO2e of emission reductions per annum. |
---|---|
Additional Information |