| Project Submission No. | S00280 |
|---|---|
| Project Title | 4 MW Hydro Project in Sardi Khola, Nepal |
| Project Owner(s) (as per PSF & LOA) | Infinite Environmental Solutions Limited |
| Submission Date | 2022-05-11 |
| Global Stakeholder Consultation Period |
2022-07-31 to 2022-08-14 |
| Registration Date | 2026-08-10 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Hydro Power |
| GCC/CDM Methodology & Version | CDM Methodology: AMS – 1.D Grid connected renewable electricity generation (ver - 18) |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
| Verified Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
Nepal
|
|---|---|
|
Focal Point of Project Owners
|
Infinite Environmental Solutions Limited |
| Email of Contact Person of FP (Primary) | jimmy@infisolutions.org |
| Email of Contact Person of FP (Secondary) | sumeet@infisolutions.org |
| Project Verifier | LGAI TECHNOLOGICAL CENTER, S.A. |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The project serves the purpose of producing clean electrical energy in a sustainable manner. The project activity involves implementation of 4 MW small hydro power project which utilizes potential energy available for power generation. Therefore, no fossil fuels are involved for power generation in the project activity. The project activity also reduces the anthropogenic emissions of greenhouse gases into the atmosphere by avoiding business as usual operation of existing fossil fuels-based power plants to produce equivalent amount of electricity.
|
|---|---|
| Additional Information | Over the entire crediting period (10 years) starting from 09/12/2017 to 08/12/2027 (Including both dates) of the project, it will generate a total of 218,160 MWh electrical power which will result in emission reduction of 63,260 tCO2e. The project will be responsible for an estimated 6,326 tCO2e emission reduction per year by displacing 21,816 MWh of electrical power per annum. |
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2026-07-06 |
| First Request for Registration Date | 2023-07-18 |
| Opinion | The GCC Project Verifier LGAI Technological Center S.A. (Applus+ Certification), verify and certify that the GCC Project Activity [4 MW Hydro Project in Sardi Khola, Nepal]: (a) has correctly described the Project Activity in the Project Submission Form (version 12.3, dated 06/07/2026) including the applicability of the approved methodology [AMS-I.D, version 18.0] and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real, measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively; (b) is likely to generate GHG emission reductions amounting to the estimated 6,326 tCO2eq/yr, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity; (c) is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and (d) is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 03 SDGs, which is likely to achieve the Silver (+03) SDG certification label (SDG+). LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “4 MW Hydro Project in Sardi Khola, Nepal”. The verification is performed on the basis of GCC criteria for project verification standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. The verification has been performed following the requirements of the latest version of GCC verification standard, Version 03.1, GCC Project Standard, version 03.1 and on the basis of the contractual agreement.
|