PROJECT DETAILS

Project Submission No. S00280
Project Title 4 MW Hydro Project in Sardi Khola, Nepal
Project Owner(s) (as per PSF & LOA) Infinite Environmental Solutions Limited
Submission Date 2022-05-11
Global Stakeholder Consultation Period 2022-07-31 to
2022-08-14
Registration Date 2026-08-10
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version CDM Methodology: AMS – 1.D Grid connected renewable electricity generation (ver - 18)
Forecasted GHG Emission Reduction (tCO2e/Year) 6,326
Verified GHG Emission Reduction (tCO2e/Year) 6,326
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Nepal
Focal Point of Project Owners
Infinite Environmental Solutions Limited
Email of Contact Person of FP (Primary) jimmy@infisolutions.org
Email of Contact Person of FP (Secondary) sumeet@infisolutions.org
Project Verifier LGAI TECHNOLOGICAL CENTER, S.A.
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Brief

The project serves the purpose of producing clean electrical energy in a sustainable manner. The project activity involves implementation of 4 MW small hydro power project which utilizes potential energy available for power generation. Therefore, no fossil fuels are involved for power generation in the project activity. The project activity also reduces the anthropogenic emissions of greenhouse gases into the atmosphere by avoiding business as usual operation of existing fossil fuels-based power plants to produce equivalent amount of electricity.

 

Additional Information

Over the entire crediting period (10 years) starting from 09/12/2017 to 08/12/2027 (Including both dates) of the project, it will generate a total of 218,160 MWh electrical power which will result in emission reduction of 63,260 tCO2e. The project will be responsible for an estimated 6,326 tCO2e emission reduction per year by displacing 21,816 MWh of electrical power per annum.

VERIFICATION OUTCOME
Report (Public) Verification Report (public)
Verification report date 2026-07-06
First Request for Registration Date 2023-07-18
Opinion

The GCC Project Verifier LGAI Technological Center S.A. (Applus+ Certification), verify and certify that the GCC Project Activity [4 MW Hydro Project in Sardi Khola, Nepal]:

(a) has correctly described the Project Activity in the Project Submission Form (version 12.3, dated 06/07/2026) including the applicability of the approved methodology [AMS-I.D, version 18.0] and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real, measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

(b) is likely to generate GHG emission reductions amounting to the estimated 6,326 tCO2eq/yr, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity;

(c) is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and

(d) is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 03 SDGs, which is likely to achieve the Silver (+03) SDG certification label (SDG+).

LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “4 MW Hydro Project in Sardi Khola, Nepal”. The verification is performed on the basis of GCC criteria for project verification standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting.
The review of the final version of GCC PSF and subsequent the remote audit/ follow-up interviews has provided Applus+ Certification with sufficient evidence to determine the fulfilment of stated criteria. In our opinion, the project meets all relevant GCC project standard requirements for the GCC. The project will hence be recommended by LGAI Technological Center S.A. (Applus+ Certification) for registration with the GCC.

The verification has been performed following the requirements of the latest version of GCC verification standard, Version 03.1, GCC Project Standard, version 03.1 and on the basis of the contractual agreement.


“The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Standard on CORSIA Eligibility of Projects and Issuances version 2.0, and the ACCs expected to be issued during the pilot phase are likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during pilot phase of CORSIA. The ACCs issued for project activity from 01/01/2021 are likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during first and subsequent phases of CORSIA provided it complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Standard on CORSIA Eligibility of Projects and Issuances & Standard on Avoidance of Double Claiming of Mitigation Outcomes in Host Country NDCs.