PROJECT DETAILS

Project Submission No. S00017
Project Title Wind Farm Kosava-I phase 69MW in Serbia
Project Owner (as per PSF) 1.MK-Fintel Wind a.d. ; 2. Energy Changes Projektentwicklung GmbH (focal point to act on behalf of all Project Owners)
Contact Person of Project Owner Energy Changes Projektentwicklung GmbH
Email of Contact Person of PO (Primary) wolfgang.wetzer@energy-changes.com
Email of Contact Person of PO (Secondary) clemens.ploechl@energy-changes.com
Country Serbia
Submission Date 16 Sep 2021
Global Stakeholder Consultation Period 6 Oct 2021 - 20 Oct 2021
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version GCCM001 v2.0 - Methodology for Grid Connected Renewable Energy Generation Projects
Forecasted GHG Emission Reduction(TCO2/Year) 226371
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG#7;SDG#8;SDG#9
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet,
Project Brief

The project activity “Wind Farm Kosava-I phase 69MW in Serbia” is a wind power plant with an installed capacity of 69 MW connected to the national electricity grid located on the municipality area of Vrasc, Republic of Serbia. The purpose of the project activity is to generate zero-emission electricity, via 20 vertical axis wind turbines powered by the renewable energy source wind, which will be supplied to the national grid to substitute fossil-based grid electricity and thus reduce around 985 kg CO2/MWh. The expected net annual electricity generation of the project activity is approximately 229,876 MWh MWh, which will reduce about 226,371 t CO2 per year.  

Additional Information

contracted verifier: EPIC Sustainability Services Private Limited