Project Submission No. | S00017 |
---|---|
Project Title | Wind Farm Kosava-I phase 69MW in Serbia |
Project Owner (as per PSF & LOA) | 1.MK-Fintel Wind a.d. ; 2. Energy Changes Projektentwicklung GmbH (focal point to act on behalf of all Project Owners) |
Focal Point of Project Owners*(FP)
|
Energy Changes Projektentwicklung GmbH |
Email of Contact Person of FP (Primary) | wolfgang.wetzer@energy-changes.com |
Email of Contact Person of FP (Secondary) | clemens.ploechl@energy-changes.com |
Country | Serbia |
Submission Date | 16 Sep 2021 |
Global Stakeholder Consultation Period | 6 Oct 2021 - 20 Oct 2021 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | GCCM001 v2.0 - Methodology for Grid Connected Renewable Energy Generation Projects |
Forecasted GHG Emission Reduction(TCO2/Year) | 194,277 |
Verified GHG Emission Reduction(TCO2/Year) | 194,277 |
Forecasted E+ Label | Yes |
Verified E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Verified S+ Label | Yes |
Forecasted SDG+ Goals | SDG#7;SDG#8;SDG#9 |
Verified SDG+ Goals | 7, 8, 9, 13 |
Forecasted SDG+ Label | Gold |
Verified SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Verified Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Request For Registration Documents | Verified Project Submision, Verified Calculation Sheet, Other Verified Documents |
Request for Registration Form | Registration Form |
Project Verifier | EPIC_SUST |
Verification Report | Verification Report |
Project Brief | The project activity “Wind Farm Kosava-I phase 69MW in Serbia” is a wind power plant with an installed capacity of 69 MW connected to the national electricity grid located on the municipality area of Vrasc, Republic of Serbia. The purpose of the project activity is to generate zero-emission electricity, via 20 horizontal axis wind turbines powered by the renewable energy source wind, which will be supplied to the national grid to substitute fossil-based grid electricity and thus reduce around 985 kg CO2/MWh. The expected net annual electricity generation of the project activity is approximately 197,285 MWh MWh, which will reduce about 194,277 t CO2 per year. |
---|---|
Additional Information | contracted verifier: EPIC Sustainability Services Private Limited |