PROJECT DETAILS

Project Submission No. S00017
Project Title Wind Farm Kosava-I phase 69MW in Serbia
Project Owner(s) (as per PSF & LOA) 1.MK-Fintel Wind a.d. ; 2. Energy Changes Projektentwicklung GmbH (focal point to act on behalf of all Project Owners)
Submission Date 2021-09-16
Global Stakeholder Consultation Period 2021-10-06 to
2021-10-20
Registration Date 2022-06-12
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version GCCM001 v2.0 - Methodology for Grid Connected Renewable Energy Generation Projects
Forecasted GHG Emission Reduction (tCO2e/Year) 194,277
Verified GHG Emission Reduction (tCO2e/Year) 194,277
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Gold
Verified SDG+ Label Gold
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility C+ - Pilot Phase
Country
 Serbia
Focal Point of Project Owners
Energy Changes Projektentwicklung GmbH
Email of Contact Person of FP (Primary) wolfgang.wetzer@energy-changes.com
Email of Contact Person of FP (Secondary) clemens.ploechl@energy-changes.com
Project Verifier EPIC SUSTAINABILITY SERVICES PRIVATE LIMITED
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Brief

The project activity “Wind Farm Kosava-I phase 69MW in Serbia” is a wind power plant with an installed capacity of 69 MW connected to the national electricity grid located on the municipality area of Vrasc, Republic of Serbia. The purpose of the project activity is to generate zero-emission electricity, via 20 horizontal axis wind turbines powered by the renewable energy source wind, which will be supplied to the national grid to substitute fossil-based grid electricity and thus reduce around 985 kg CO2/MWh. The expected net annual electricity generation of the project activity is approximately 197,285 MWh MWh, which will reduce about 194,277 t CO2 per year. 

Additional Information

contracted verifier: EPIC Sustainability Services Private Limited

VERIFICATION OUTCOME
Report (Public) Verification Report (public)
Verification report date 2022-05-24
First Request for Registration Date 2022-02-04
Opinion

The GCC Project Verifier [EPIC Sustainability Services Private Limited], certifies the following with respect to the GCC Project Activity [Wind Farm Kosava-I phase 69MW in Serbia].

The Project Owner has correctly described the Project Activity in the Project Submission Form (version 5.0, dated 16/05/2022) including the applicability of the approved methodology [GCCM001, version 2.0] and meets the methodology applicability conditions and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reductions estimates correctly and conservatively.

The Project Activity is likely to generate GHG emission reductions amounting to the estimated [194,277] TCO2e per year, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3.

The Project Activity is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and is likely to achieve the following labels: Environmental No-net-harm Label (E+) Social No-net-harm Label (S+)

The Project Activity is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), complies with the Project Sustainability Standard, and contributes to achieving a total of [4] SDGs, with the Gold SDG label. 

The Project Activity complies with all the applicable requirements of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.1 paragraph 21-23, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project.

The Project Activity complies with all the applicable GCC rules and therefore recommends GCC Program to register the Project activity with above mentioned labels.