Project Submission No. | S00248 |
---|---|
Project Title | MUI NE SOLAR POWER PROJECT |
Project Owner (as per PSF & LOA) | Duc Thanh Mui Ne Joint Stock Company |
Focal Point of Project Owners*(FP)
|
VN GREEN HOLDINGS PTE. LTD. |
Email of Contact Person of FP (Primary) | quangnguyen@dragoncapital.com |
Email of Contact Person of FP (Secondary) | thangduong@dragoncapital.com |
Country | Viet Nam |
Submission Date | 12 Apr 2022 |
Global Stakeholder Consultation Period | 6 Jun 2022 - 20 Jun 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002 – Grid-connected electricity generation from renewable sources, version 20.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 53,203 tCO2/year |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 7, 8, 9 |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The project activity involves the construction and operation of Mui Ne Solar Power Project with total installed capacity of 40 MW. The project activity is located Mui Ne Ward, Phan Thiet City, Binh Thuan Province, Viet Nam. The Mui Ne Solar Power Project uses mono-crystalline solar panels to recover solar radiation energy. Monocrystalline modules are the most commonly used technology in commercial and industrial solar projects. The purpose of the project is to generate a clean energy source by converting solar energy into electricity and supplying it to Viet Nam’s national electricity grid. The annual net electricity generated of 63,731 MWh from this project is supplied to the national grid via the electricity transmission line, which displaced part of the electricity otherwise supplied by grid connected fossil fuel fired power plants. Thus, GHG emission reductions can be achieved. The expected CO2 emission reduction from the proposed project is 53,203.1 tCO2e annually and 532,031 tCO2e in the fixed 10 years crediting period. |
---|---|
Additional Information |