PROJECT DETAILS

Project Submission No. S00255
Project Title Emission Reductions from Tenaga Generasi Limited Grid Connected 49.5MW Wind Power Plant
Project Owner(s) (as per PSF & LOA) PACT Capital AG / TENAGA Generasi Limited
Submission Date 2022-03-30
Global Stakeholder Consultation Period 2022-06-29 to
2022-07-13
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources, Version 20.0
Forecasted GHG Emission Reduction (tCO2e/Year) 86,878
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility C+ - Pilot Phase
Country
 Pakistan
Focal Point of Project Owners
Pact Capital AG
Email of Contact Person of FP (Primary) compliance@pact.capital
Email of Contact Person of FP (Secondary) marianna@pact.capital
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet
Project Brief

The project activity “Emission Reduction from Tenaga Generasi Limited Grid Connected 49.5MW Wind Power Plant” (project) being implemented by Tenaga Generasi Limited involves the installation of 49.5 MW Wind Power Project (wind farm) consisting of Wind Turbine Generators (WTGs) with capacity of 30x1.6 MW and 1x1.5 MW, a total of 49.5 MW. The WTGs are supplied by General Electric (GE).

The project is located at Deh Khuttikun,Taluka Mirpur Sakro, District Thatta, Sindh, Pakistan. The objective of the project is to generate renewable electricity using wind energy and supply of the electricity generated to the National Transmission & Dispatch Company (NTDC) of Pakistan. The electricity generated by the project will thus displace the equivalent amount of electricity generated by operation of existing grid connected power plants and by addition of new generation sources to the grid.

The project was licensed on 29/12/2014 by the NTDC, through its Central Power Purchase Agency (CPPA), to dispatch electricity to the NTDC grid of Pakistan.

    The crediting period chosen for the project is fixed crediting period of 10 years. The net electricity generation of the project is expected at 147,864.4 MWh per annum which results in annual average GHG emission reductions of 86,878 tCO2e per annum.