Project Submission No. | S00255 |
---|---|
Project Title | Emission Reductions from Tenaga Generasi Limited Grid Connected 49.5MW Wind Power Plant |
Project Owner(s) (as per PSF & LOA) | PACT Capital AG / TENAGA Generasi Limited |
Submission Date | 2022-03-30 |
Global Stakeholder Consultation Period |
2022-06-29 to 2022-07-13 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources, Version 20.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() ![]() |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | C+ - Pilot Phase |
Country |
Pakistan
|
---|---|
Focal Point of Project Owners
|
Pact Capital AG |
Email of Contact Person of FP (Primary) | compliance@pact.capital |
Email of Contact Person of FP (Secondary) | marianna@pact.capital |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | The project activity “Emission Reduction from Tenaga Generasi Limited Grid Connected 49.5MW Wind Power Plant” (project) being implemented by Tenaga Generasi Limited involves the installation of 49.5 MW Wind Power Project (wind farm) consisting of Wind Turbine Generators (WTGs) with capacity of 30x1.6 MW and 1x1.5 MW, a total of 49.5 MW. The WTGs are supplied by General Electric (GE). The project is located at Deh Khuttikun,Taluka Mirpur Sakro, District Thatta, Sindh, Pakistan. The objective of the project is to generate renewable electricity using wind energy and supply of the electricity generated to the National Transmission & Dispatch Company (NTDC) of Pakistan. The electricity generated by the project will thus displace the equivalent amount of electricity generated by operation of existing grid connected power plants and by addition of new generation sources to the grid. The project was licensed on 29/12/2014 by the NTDC, through its Central Power Purchase Agency (CPPA), to dispatch electricity to the NTDC grid of Pakistan. The crediting period chosen for the project is fixed crediting period of 10 years. The net electricity generation of the project is expected at 147,864.4 MWh per annum which results in annual average GHG emission reductions of 86,878 tCO2e per annum. |
---|