PROJECT DETAILS

Project Submission No. S01288
Project Title Serra do Mel III-VI Photovoltaic (PV) Solar Power Project
Project Owner(s) (as per PSF & LOA) Voltalia Energia do Brasil Ltda.
Submission Date 2024-06-06
Global Stakeholder Consultation Period 2024-09-17 to
2024-10-01
Registration Date 2026-06-15
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version GCCM001 - Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers - Version: v.4.0
Forecasted GHG Emission Reduction (tCO2e/Year) 121,010
Verified GHG Emission Reduction (tCO2e/Year) 121,010
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Diamond
Verified SDG+ Label Diamond
Forecasted Market Eligibility
Verified Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Brazil
Focal Point of Project Owners
Voltalia Energia do Brasil Ltda
Email of Contact Person of FP (Primary) carbon-credits@voltalia.com
Email of Contact Person of FP (Secondary) m.faria@voltalia.com
Project Verifier Earthood Services Private Limited
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Brief

The proposed project consists of the implementation of Serra do Mel III-VI PV Solar Power Project composed by four plants with 48.118 MW installed capacity each: Serra do Mel III, Serra do Mel IV, Serra do Mel V and Serra do Mel VI, totaling 192.472 MW installed capacity. During the crediting period, the project is expected to reduce 1,210,103 tCO2e, i.e. 121,010 tCO2e/year.

VERIFICATION OUTCOME
Report (Public) Verification Report (public)
Verification report date 2026-05-29
First Request for Registration Date 2024-07-11
Opinion

Earthood was contracted by Voltalia Energia do Brasil Ltda (VEB) for project verification of the project activity “Serra do Mel III-VI Photovoltaic (PV) Solar Power Project” in Brazil. The project verification was performed based on rules and requirements defined by GCC for the project activity.

The project activity is a solar power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the Approved GCC Methodology GCCM001 Version 4.0/19/ including applicable CDM Tools and is assessed against latest valid GCC Project Standard/04/, Verification Standard/05/, Environment and Social Safeguards Standard/07/, Project-Sustainability-Standard/06/ and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms/clarifications.

The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 121,010 tCO2e/year over the 10 years crediting period starting from 01/01/2026 or project registration date, whichever is later.

Earthood has informed the project owners of the verification outcome through the draft verification report and final verification report. The final verification report contains the information with regard to fulfilment of the requirements for verification, as appropriate.

Earthood applied the following verification process and methodology using a competent project verification team.

  • the desk review of documents and evidence submitted by the Project Owner in context of the reference GCC rules and guidelines issued,
  • undertaking/conducting on-site visit, interview or interactions with the representative of the project owner,
  • reporting audit findings with respect to clarifications and non-conformities and the closure of the findings, as appropriate
  • preparing a draft verification opinion based on the auditing findings and conclusions
  • technical review of the draft verification opinion along with other documents as appropriate by an independent competent technical review team
  • finalization of the verification opinion (this report).

Earthood has verified and hereby certifies that the GCC project activity “Serra do Mel III-VI Photovoltaic (PV) Solar Power Project”

a.     has correctly described the Project Activity in the Project Submission Form (version 2.2 dated: 21/05/2026) including the applicability of the approved GCC methodology GCCM001 Version 4.0/19/  and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

b.     is likely to generate GHG emission reductions amounting to the estimated 121,010 tCO2e per year as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity;

c.     is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard. the project level impacts are identified in the PSF for the Environmental and Social Safeguarding with E+ score as 9 and S+ score as 9. Adequate monitoring system is defined and is in-place to monitor these impacts throughout the crediting period. and therefore, requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and

d.     is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 6 SDGs, which is likely to achieve the Diamond SDG certification label (SDG+). The project level SDG indicators are defined for each SDG contribution and there is a system in-place to monitor and verify the contribution throughout the crediting period.

Therefore, the project is being recommended to GCC Steering Committee for request for registration.