PROJECT DETAILS

Project Submission No. S01252
Project Title EnergySolar
Project Owner(s) (as per PSF & LOA) VEMA S.A.
Submission Date 2024-05-07
Global Stakeholder Consultation Period 2024-06-05 to
2024-06-19
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers V4.0 - 2022
Forecasted GHG Emission Reduction (tCO2e/Year) 55,940
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility
Location Details Open Full Map
Country
 Ukraine
Focal Point of Project Owners
VEMA S.A.
Email of Contact Person of FP (Primary) pertkopp@gmail.com
Email of Contact Person of FP (Secondary) info@vemacarbon.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet
Project Brief

The project includes 8 Solar Photovoltaic stations in 7 different locations. Generated by these stations electricity supplies to the grid (the integrated power system of Ukraine). The project activity displaces electricity from an electricity distribution system that is or would have been supplied by a national grid and that was generated by fossil fuel-fired power plants.
The main goal of solar power plant projects was to generate electricity in order to reduce greenhouse gas emissions from electricity generation in the integrated power system of Ukraine.