PROJECT DETAILS

Project Submission No. S01083
Project Title Susuz Regulator and Hydroelectric Power Plant (Susuz HEPP)
Project Owner(s) (as per PSF & LOA) Köprüyaka Hidrolik Enerji ve Yatırım Anonim Şirketi
Submission Date 2023-11-02
Global Stakeholder Consultation Period 2023-11-20 to
2023-12-04
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 9,429
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Türkiye
Focal Point of Project Owners
Köprüyaka Hidrolik Enerji ve Yatırım Anonim Şirketi
Email of Contact Person of FP (Primary) ozgebaki@krkholding.com
Email of Contact Person of FP (Secondary) enerji@krkholding.com
Name of Authorized External Representative Organization Gaia Climate Finansal Danışmanlık Hizmetleri ve Ticaret A.Ş.
Name of Focal Point of External Representative Gediz S. Kaya
Email-id of External representative gkaya@gaiaclimate.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet
Project Brief

Susuz Regulator and Hydroelectric Power Plant (HEPP) with a capacity of 7.1 MWe in total,  generates clean energy by using the hydropower and provides the energy to the Turkish national grid. By implementing the project, investors also aim to reduce dependency to the fossil fuels thereby reducing the sources of environmental pollution. Susuz Regulator and Hydroelectric Power Plant has been implemented and operated in compliance with the Law no: 6446 on Electricity Market Law No:6446. 

The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. Total installed capacity included by the GCC project is drawn as 7.1 MWe. The average annual generated energy is expected to be 21,460 MWh according to the generation values.

The total emission reduction for the whole crediting period is calculated as 16,705 tCO2e and respectively total of 167,059 tons of CO2.