Project Submission No. | S00469 |
---|---|
Project Title | Shanxi Junxiangtong 14MW Coal Mine Methane Power Generation Project |
Project Owner (as per PSF & LOA) | Carbon Emission Consulting (Shanghai) Co. Ltd. |
Focal Point of Project Owners*(FP)
|
Carbon Emission Consulting(Shanghai) Co. Ltd. |
Email of Contact Person of FP (Primary) | 907529506@qq.com |
Email of Contact Person of FP (Secondary) | 1817324090@qq.com |
Country | China |
Submission Date | 30 Jun 2022 |
Global Stakeholder Consultation Period | 5 Oct 2022 - 19 Oct 2022 |
Sector | 10.Fugitive emissions from fuels (solid, oil and gas) |
GCC/CDM Methodology & Version | ACM0008 version8.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 237,135 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | #8,#11,#13 |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Shanxi Junxiangtong 14MW Coal Mine Methane Power Generation is a coal mine methane power project with a total installed capacity of 14MW, the project is invested and operated by Shanxi Junxiangtong New Energy Technology Co., Ltd. The project is located in Shi Ge Die Village, Hanbei Township, Wuxiang County,Changzhi City, Shanxi Province, China. The project is expected to supply an annual average of 43,467MWh of zero-emission electricity to NCPG during the fixed 10-year crediting period,which replace the power generation of those fossil fuel-fired power plants delivered to the NCPG under the baseline scenario.The project is expected to achieve a green-house gas emission reduction of 237,135 tCO2e annually. The total emission reductions during the fixed 10-year crediting period are 2,371,350 tCO2e. |
---|---|
Additional Information |