PROJECT DETAILS

Project Submission No. S01004
Project Title Haixing Jingxing Solar Power Project
Project Owner(s) (as per PSF & LOA) Beijing Jingneng Clean Energy Co., Limited Beijing Branch
Submission Date 2022-06-30
Global Stakeholder Consultation Period 2023-06-25 to
2023-07-09
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 129,993
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Country
 China
Focal Point of Project Owners
Beijing Jingneng Clean Energy Co., Limited Beijing Branch
Email of Contact Person of FP (Primary) gengyan@bjnewenergy.com
Email of Contact Person of FP (Secondary) yangguang@bjnewenergy.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Haixing Jingxing Solar Power Project is a solar power project with total installed capacity of 110MW, the project is invested and operated by Haixing Jingxing New Energy Co., Ltd. The project locates in Haixing County, Cangzhou City, Hebei Province, P.R. China. The purpose of the project is to utilize the solar energy at the project site to generate and supply electricity to North China Power Grid (NCPG). The spatial extent of the project boundary includes the project power plant and all power plants connected physically to NCPG that the project is connected to.
The project is a renewable energy project and is expected to supply an annual average of 174,723 MWh of zero-emission electricity to NCPG during the fixed 10-year crediting period, which will replace power generation of those fossil fuel-fired power plants delivered to the NCPG under the baseline scenario. The project is expected to achieve a green-house gas emission reduction of 129,993 tCO2e annually. The total emission reductions during the fixed 10-year crediting period will be 1,299,939 tCO2e.