IMPORTANT UPDATE: We are migrating to GCC 2.0. We have restricted new projects registration and further updates to migrated project. Please visit to GCC 2.0.

PROJECT DETAILS

Project Submission No. S01016
Project Title Dayuehe Villiage 80MW Solar Project
Project Owner(s) (as per PSF & LOA) Beijing Jingneng Clean Energy Co., Limited Beijing Branch
Submission Date 2022-06-30
Global Stakeholder Consultation Period 2023-07-14 to
2023-07-28
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 82,578
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Country
 China
Focal Point of Project Owners
Beijing Jingneng Clean Energy Co., Limited Beijing Branch
Email of Contact Person of FP (Primary) gengyan@bjnewenergy.com
Email of Contact Person of FP (Secondary) yangguang@bjnewenergy.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Dayuehe Villiage 80MW Solar Project is a solar photovoltaic power project with a total installed capacity of 80 MW, the project is invested and operated by Tianjin Yongneng Photovoltaic Power Generation Co., LTD. The project locates in Dayuehe Villiage, Ninghe District, Tianjin City of China. The purpose of the project is to utilize the solar energy at the project site to generate and supply electricity to North China Power Grid (NCPG).
The spatial extent of the project boundary includes the project power plant and all power plants connected physically to NCPG that the project is connected to. Prior to the implementation of the project, the electricity delivered to the grid by the project activity would be generated by the operation of grid-connected power plants and by the addition of new generation sources into the NCPG.
The project is a renewable energy project and is expected to supply an annual average of 110,993 MWh of zero-emission electricity to NCPG during the fixed 10-year crediting period, which replace the power generation of those fossil fuel-fired power plants delivered to the NCPG under the baseline scenario. The project is expected to achieve a green-house gas emission reduction of 82,578 tCO2e annually. The total emission reductions during the fixed 10-year crediting period are 825,780 tCO2e.

© 2026 Global Carbon Council