Project Submission No. S00631
Project Title 10 MW Solar Power Project
Project Owner (as per PSF & LOA) LR Energy Services Private Limited
Submission Date 30 Jun 2022
Global Stakeholder Consultation Period 24 Nov 2022 - 8 Dec 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AMS-I.D.: - Grid Connected renewable electricity generation – Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 16,813 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country India
Focal Point of Project Owners (FP)
LR ENERGY SERVICES PRIVATE LIMITED
Email of Contact Person of FP (Primary) ekasb@lrenergy.in
Email of Contact Person of FP (Secondary) ekasb@lrenergy.in
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The proposed project activity is the installation of a new grid-connected 10 MWAC (12 MWDC) Solar power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project activity is solar power project which is being implemented in Sirsa District, Haryana of India by Roop Ram Industries Private Limited so Roop Ram Industries Private Limited is project owner and LR Energy Services Private Limited is authorized representative. The electricity generated from Project Activity is exported to the Indian grid there by displacing the consumption of electricity from the regional grid electricity distribution system.

 

Additional Information

The crediting period chosen for the project activity “10 MW Solar Power Project” is 10 years Crediting Period in which total GHG emission reduction estimated is 16,813 tCO2e. The annual average estimated emission reduction from project activity is 16,813 tCO2e/annum.

VERIFICATION OUTCOME
Opinion

The GCC Project Verifier, LGAI Technological Center S.A., has verified and certified that the GCC Project Activity – ‘10MW Solar Power Project’ has correctly described the Project Activity in the Project Submission Form (version 6.0), dated 01/09/2023 including the applicability of the approved methodology AMS-I.D. Version 18.0. and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively; is likely to generate GHG emission reductions amounting to the estimated 16,813 tCO2e annual average, as indicated in the PSF which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3 and therefore requests the GCC Program to register the Project Activity; is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard/6/, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard/6/ and contribute to achieving a total of 3 SDGs, which is likely to achieve the silver SDG certification label (SDG+).

 

Report (Public) Verification Report (public)
Verification report date 2023-11-06
First Request for Registration Date 2023-11-25