| Project Submission No. | S00063 |
|---|---|
| Project Title | Solar Power Project in Sirsa, Haryana by Avaada Green HNProject |
| Project Owner(s) (as per PSF & LOA) | Avaada Energy Private Limited |
| Submission Date | 2021-12-30 |
| Global Stakeholder Consultation Period |
2022-01-10 to 2022-01-24 |
| Registration Date | 2026-04-29 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources --- Version 20.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | |
| Verified Market Eligibility |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Emergent Ventures India Pvt. Ltd. |
| Email of Contact Person of FP (Primary) | atul.sanghal@emergent-ventures.com |
| Email of Contact Person of FP (Secondary) | jatin@emergent-ventures.com |
| Name of Authorized External Representative Organization | Emergent Ventures India Pvt. Ltd. |
| Name of Focal Point of External Representative | Atul Sanghal |
| Email-id of External representative | atul.sanghal@emergent-ventures.com |
| Project Verifier | Earthood Services Private Limited |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The purpose of project activity is to generate and feed to the connected national electricity grid of India GHG free electricity by the installation of a 50 MWac solar power project. The project activity is located at Phorka village in Ellanabad tehsil of district Sirsa in the state of Haryana, in India. |
|---|
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2026-04-10 |
| First Request for Registration Date | 2022-11-08 |
| Opinion | ESL is contracted by Emergent Venture India Pvt. Ltd. For project verification of the project activity “Solar Power Project in Sirsa, Haryana by Avaada Green HNProject” in India. The verification was performed based on rules and requirements defined by GCC for the project activity. The project activity is a solar power project, which results in reductions of CO2e emissions that are real, measurable, and give long-term benefits to the mitigation of Climate Change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved CDM baseline and monitoring ACM0002 version 20.0 and applicable CDM Tools and is assessed against the latest valid PS, VS, and Environment and Social Safeguards Standard, Project-Sustainability-Standard and/or other applicable ICAO/GCC/CDM Decisions/Tools/Guidance/Forms/clarifications. The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be average 67,727 tCO2e/year over the 10 years crediting period starting from 01/12/2021. ESL has informed the project owner of the verification outcome through the draft verification report and final verification report. The final verification report contains information concerning the fulfilment of the requirements for verification, as appropriate. ESL applied the following verification process and methodology using a competent verification team:
Earthood Services Limited (ESL) has verified and hereby certifies that the GCC project activity “Solar Power Project in Sirsa, Haryana by Avaada Green HNProject” a. has correctly described the Project Activity in the Project Submission Form (version 6.0) including the applicability of the approved CDM Methodology ACM0002 version 20.0 and meets the methodology applicability conditions along with applied Tools, is additional and is expected to achieve the forecasted real, measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively; b. is likely to generate GHG emission reductions amounting to the estimated average 67,727 tCO2e as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity. c. is not likely to cause any net harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard. The project level impacts are identified in the PSF for Environmental and Social Safeguarding with an E+ score of 5 and an S+ score of 6. An adequate monitoring system is defined and is in place to monitor these impacts throughout the crediting period. and therefore, requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and d. is likely to contribute to the achievement of the United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+) subjected to the confirmation at the verification stage. The project-level SDG indicators are defined for each SDG contribution and there is a system in place to monitor and verify the contribution throughout the crediting period. e. The Project Activity is not eligible for and has not claimed CORSIA certification label (C+). Therefore, the project is being recommended to GCC Steering Committee for the request for registration. |