PROJECT DETAILS

Project Submission No. S00562
Project Title Wushi County Wuyibulake River Secondary Hydro Power Plant Project
Project Owner (as per PSF & LOA) Chengdu Dahui Low Carbon Environmental Protection Technology Co. Ltd.
Focal Point of Project Owners*(FP)
Chengdu Dahui Low Carbon Environmental Protection Technology
Email of Contact Person of FP (Primary) liulian@cd-dhdt.com
Email of Contact Person of FP (Secondary) zhuyunxiang@cd-dhdt.com
Country China
Submission Date 30 Jun 2022
Global Stakeholder Consultation Period 31 Oct 2022 - 14 Nov 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources( Version 20.0)
Forecasted GHG Emission Reduction(TCO2/Year) 13189
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals #7, #8,#13
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

The project with total installed capacity of 3.2MW. is a renewable energy project and is expected to supply an annual average of 19,790 MWh of zero-emission electricity to NWCPG during the fixed 10-year crediting period, which will replace power generation of those fossil fuel-fired power plants delivered to the NWCPG under the baseline scenario. The project is expected to achieve a green-house gas emission reduction of 13,189 tCO2e annually. The total emission reductions during the fixed 10-year crediting period will be 131,890 tCO2e.