| Project Submission No. | S00562 |
|---|---|
| Project Title | Wushi County Wuyibulake River Secondary Hydro Power Plant Project |
| Project Owner(s) (as per PSF & LOA) | Chengdu Dahui Low Carbon Environmental Protection Technology Co. Ltd. |
| Submission Date | 2022-06-30 |
| Global Stakeholder Consultation Period |
2022-10-31 to 2022-11-14 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Hydro Power |
| GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources( Version 21.0) |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
China
|
|---|---|
|
Focal Point of Project Owners
|
Chengdu Dahui Low Carbon Environmental Protection Technology |
| Email of Contact Person of FP (Primary) | liulian@cd-dhdt.com |
| Email of Contact Person of FP (Secondary) | zhuyunxiang@cd-dhdt.com |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Project Brief | The project with total installed capacity of 3.2MW. is a renewable energy project and is expected to supply an annual average of 19,790 MWh of zero-emission electricity to NWCPG during the fixed 10-year crediting period, which will replace power generation of those fossil fuel-fired power plants delivered to the NWCPG under the baseline scenario. The project is expected to achieve a green-house gas emission reduction of 13,189 tCO2e annually. The total emission reductions during the fixed 10-year crediting period will be 131,890 tCO2e. |
|---|