| Project Submission No. | S00562 | 
|---|---|
| Project Title | Wushi County Wuyibulake River Secondary Hydro Power Plant Project | 
| Project Owner(s) (as per PSF & LOA) | Chengdu Dahui Low Carbon Environmental Protection Technology Co. Ltd. | 
| Submission Date | 2022-06-30 | 
| Global Stakeholder Consultation Period | 
                          
      2022-10-31 to  2022-11-14  | 
                    
| Sector | 1.Energy industries (renewable-/non-renewable sources) | 
| Project Type | Hydro Power | 
| GCC/CDM Methodology & Version | ACM0002: Grid-connected electricity generation from renewable sources( Version 21.0) | 
| Forecasted GHG Emission Reduction (tCO2e/Year) | 
                             | 
                    
| Forecasted E+ Label | Yes | 
| Forecasted S+ Label | Yes | 
| Forecasted SDG+ Goals | 
                                     
         
         
                         | 
                    
| Forecasted SDG+ Label | Silver | 
| Forecasted Market Eligibility | C+ - Pilot Phase | 
| 
                        
 
    
    
        Location Details 
            Open Full Map  
    
 
 | 
                    |
| Country | 
                              China 
                         | 
                    
|---|---|
| 
                           
                            Focal Point of Project Owners
                           
                         | 
                        Chengdu Dahui Low Carbon Environmental Protection Technology | 
| Email of Contact Person of FP (Primary) | liulian@cd-dhdt.com | 
| Email of Contact Person of FP (Secondary) | zhuyunxiang@cd-dhdt.com | 
| Documents for Global Stakeholder Consultation | Project Submision
                           Calculation Sheet Other Documents  | 
                    
| Project Brief | The project with total installed capacity of 3.2MW. is a renewable energy project and is expected to supply an annual average of 19,790 MWh of zero-emission electricity to NWCPG during the fixed 10-year crediting period, which will replace power generation of those fossil fuel-fired power plants delivered to the NWCPG under the baseline scenario. The project is expected to achieve a green-house gas emission reduction of 13,189 tCO2e annually. The total emission reductions during the fixed 10-year crediting period will be 131,890 tCO2e.  | 
                    
|---|