PROJECT DETAILS

Project Submission No. S00560
Project Title Wushi County Wuyibulake River First-Class Hydro Power Plant Project
Project Owner (as per PSF & LOA) Chengdu Dahui Low Carbon Environmental Protection Technology Co. Ltd.
Submission Date 30 Jun 2022
Global Stakeholder Consultation Period 31 Oct 2022 - 14 Nov 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources( Version 21.0)
Forecasted GHG Emission Reduction (tCO2e/Year) 20,608 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility CORSIA(C+)
Location Details Open Full Map
Country China
Focal Point of Project Owners (FP)
Chengdu Dahui Low Carbon Environmental Protection Technology
Email of Contact Person of FP (Primary) liulian@cd-dhdt.com
Email of Contact Person of FP (Secondary) zhuyunxiang@cd-dhdt.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Wushi County Wuyibulake River First-Class Hydro Power Plant Project (hereafter referred to as “the project”) involves the installation of 5 MW Hydro Power Plant 7 village, Yingawati Township, Wushi County, Aksu City, Xinjiang Uygur Autonomous Region, China. The aim of the project is to generate electricity from renewable source of energy (hydro) and leads to reduction in GHG emissions. The energy generated is being supplied to Northwest Branch of State Grid Corporation of China (NWCPG). 
The project Is invested and operated by Wushi Hanyi New Energy Development Co. The geographic coordinates of the project are 41° 20’ 23.6004” N (41.3399°N), 79° 09’ 23.6592” E (79.1566°E).
The project is in operation since 07/01/2017. The emission reductions (annual average) from the project activity are estimated to be 20,608 tCO2e per year over the crediting period and 206,080 during the 10-year crediting period. 

Additional Information
VERIFICATION OUTCOME
Opinion

The GCC Project Verifier Shenzhen CTI International Certification Co., Ltd, has verified and certifying that the GCC Project Activity Wushi County Wuyibulake River First-Class Hydro Power Plant Project:

(a) has correctly described the Project Activity in the Project Submission Form (version 5.0, dated 25/03/2023) including the applicability of the approved methodology ACM0002: “Grid-connected electricity generation from renewable sources” (Version 21.0) and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

(b) is likely to generate GHG emission reductions amounting to the estimated 206,080 t CO2eq, as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity; 

(c) is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+ ) and the Social No-net-harm Label (S+ ); and 

(d) is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 03 SDGs, which is likely to achieve the Silver SDG certification label (SDG+ ).

 

Report (Public) Verification Report (public)
Verification report date 2023-03-25
First Request for Registration Date 2023-10-30
© 2024 Global Carbon Council