Project Submission No. | S00395 |
---|---|
Project Title | Carhuac HPP |
Project Owner(s) (as per PSF & LOA) | 1) Andean Power S.A.C. 2) Carbon Climate Protection GmbH |
Submission Date | 2022-06-29 |
Global Stakeholder Consultation Period |
2022-09-21 to 2022-10-05 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Hydro Power |
GCC/CDM Methodology & Version | ACM0002 – Grid-connected electricity generation from renewable sources – Version 20.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) |
![]() |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals |
![]() ![]() ![]() |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | C+ - Pilot Phase |
Location Details
Open Full Map
|
|
Country |
Peru
|
---|---|
Focal Point of Project Owners
|
Carbon Climate Protection GmbH |
Email of Contact Person of FP (Primary) | dunkel@carbon-austria.com |
Email of Contact Person of FP (Secondary) | bichler@carbon-austria.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Andean Power S.A.C. constructed the Carhuac HPP from year 2016 to 2018 with the aim to produce electricity and feed it into the Peruvian national grid. The Project Activity uses proven technologies for hydroelectric energy generation, is a new run-of-river, involving no dams nor impounding of water, and was designed for minimal environmental impact. It employs two turbines and has a total nominal power capacity of 20 MW. The annual electricity production is expected to be 108,793 MWh (incl. transmission losses) and the estimated annual emission reductions are around 49,877 tCO2. |
---|