PROJECT DETAILS

Project Submission No. S00395
Project Title Carhuac HPP
Project Owner(s) (as per PSF & LOA) 1) Andean Power S.A.C. 2) Carbon Climate Protection GmbH
Submission Date 2022-06-29
Global Stakeholder Consultation Period 2022-09-21 to
2022-10-05
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version ACM0002 – Grid-connected electricity generation from renewable sources – Version 20.0
Forecasted GHG Emission Reduction (tCO2e/Year) 49,877
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Peru
Focal Point of Project Owners
Carbon Climate Protection GmbH
Email of Contact Person of FP (Primary) dunkel@carbon-austria.com
Email of Contact Person of FP (Secondary) bichler@carbon-austria.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Andean Power S.A.C. constructed the Carhuac HPP from year 2016 to 2018 with the aim to produce electricity and feed it into the Peruvian national grid. The Project Activity uses proven technologies for hydroelectric energy generation, is a new run-of-river, involving no dams nor impounding of water, and was designed for minimal environmental impact. It employs two turbines and has a total nominal power capacity of 20 MW. The annual electricity production is expected to be 108,793 MWh (incl. transmission losses) and the estimated annual emission reductions are around 49,877 tCO2.