PROJECT DETAILS

Project Submission No. S00740
Project Title Erciyes 1 Solar Bundle
Project Owner (as per PSF & LOA) -ERCİYES ENERJİ ÜRETİM SANAYİ VE TİCARET A.Ş. -GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S
Submission Date 29 Jun 2022
Global Stakeholder Consultation Period 19 Dec 2022 - 2 Jan 2023
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation - v18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 12,924 (tCO2e/Year)
Verified GHG Emission Reduction (tCO2e/Year) (tCO2e/Year)
Forecasted E+ Label Yes
Verified E+ Label
Forecasted S+ Label Yes
Verified S+ Label
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label
Forecasted Market Eligibility CORSIA(C+)
Verified Market Eligibility
Location Details Open Full Map
Country Türkiye
Focal Point of Project Owners (FP)
GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S
Email of Contact Person of FP (Primary) kemal.demirkol@gte.com.tr
Email of Contact Person of FP (Secondary) mustafayavuz@erciyesenerji.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project is reducing national energy deficit and development of local industries as it allows the use of local sources for energy generation to meet the increasing demands. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emissions from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. The average annual generated energy of 19,921 MWh, will be able to deliver a reduction in emissions of around 12,924 tCO2e (tons of carbon dioxide equivalent) per annum and 129,240 tCO2e in the first crediting period. Project is located in Kayseri, Turkey.

Additional Information
VERIFICATION OUTCOME
Opinion

ESPL is contracted by ERCİYES ENERJİ ÜRETİM SANAYİ VE TİCARET A.Ş. for project verification of the project activity “Erciyes-1 Solar Bundle” in Türkiye. The verification was performed based on rules and requirements defined by GCC for the project activity.

The project activity is a solar power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the small scale CDM approved baseline and monitoring methodology AMS-I.D. version 18.0 and is assessed against latest valid Project Standard, Verification Standard and Environment and Social Safeguards Standard, Project-Sustainability-Standard and/or other applicable ICAO/GCC/CDM Decisions/Tools/Guidance/Forms/clarifications.

The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 12,924 tCO2e/year over the 10 years crediting period starting from 18/01/2016.

ESPL has informed the project owners of the verification outcome through the draft verification report and final verification report. The final verification report contains the information with regard to fulfilment of the requirements for verification, as appropriate.

ESPL applied the following verification process and methodology using a competent verification team:

·       the desk review of documents and evidence submitted by the Project Owner in context of the reference GCC rules and guidelines issued,

·       undertaking/conducting remote site visit, interview or interactions with the representative of the project owner,

·       reporting audit findings with respect to clarifications and non-conformities and the closure of the findings, as appropriate

·       preparing a draft verification opinion based on the auditing findings and conclusions.

·       technical review of the draft verification opinion along with other documents as appropriate by an independent competent technical review team

·       finalization of the verification opinion (this report)

Earthood Services Private Limited (ESPL) has verified and hereby certifies that the GCC project activity “Erciyes-1 Solar Bundle”

•        has correctly described the Project Activity in the Project Submission Form (Version 03 dated 17/12/2023) including the applicability of the small scale CDM approved baseline and monitoring methodology AMS-I.D. Version 18.0 and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

•        is likely to generate GHG emission reductions amounting to the estimated 12,924 tCO2e as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity.

•        is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and

•        is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+)

The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.3 paragraph 23-25, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project. The written attestation from the Host country on double counting shall be submitted by the project owner at ACCs issuance stage. A FAR remains open regarding the same.

Report (Public) Verification Report (public)
Verification report date 2023-12-18
First Request for Registration Date 2023-12-18