Project Submission No. | S00732 |
---|---|
Project Title | Chuntangba Hydropower Plant |
Project Owner (as per PSF & LOA) | Eno Carbon Management Limited |
Focal Point of Project Owners*(FP)
|
Jiangbo Zhou |
Email of Contact Person of FP (Primary) | jumbochow@qq.com |
Email of Contact Person of FP (Secondary) | 125192746@qq.com |
Country | China |
Submission Date | 29 Jun 2022 |
Global Stakeholder Consultation Period | 14 Dec 2022 - 28 Dec 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002 (Version20.0) |
Forecasted GHG Emission Reduction(TCO2/Year) | 128612 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | #7 #8 #9 |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | jumbochow@qq.com |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Chuntangba Hydropower Plant is a hydro power project with total installed capacity of 54MW, locates in Left bank tributary of the Xiaojinchuan River, Xiaojin County, Aba Prefecture, Sichuan Province,The project is invested and operated by Sichuan Xiaojinchuan Hydropower Co., Ltd. The project installs 3 sets of hydroelectric generators with unit capacity of 18MW. The purpose of the project is to utilize the hydro resource at the project site to generate and supply electricity to Central China Power Grid (CCPG). The project boundary is considered as the CCPG according to applied tool. Prior the implementation of the project, the electricity delivered to the grid by the project activity would be generated by the operation of grid-connected power plants and by the addition of new generation sources into the CCPG. The project is a renewable energy project and is expected to supply 224,828 MWh of zero-emission electricity to CCPG, which will replace power generation of those fossil fuel-fired power plants delivered to the CCPG under the baseline scenario. The project is expected to achieve a greenhouse gas emission reduction of 128,612 tCO2e annually. The total emission reduction during the fixed 10-year crediting period will be 1,286,120 tCO2e. |
---|---|
Additional Information |