Project Submission No. | S00584 |
---|---|
Project Title | Elmalı WPP |
Project Owner (as per PSF & LOA) | 1.ELMALI ENERJİ ÜRETİM A.Ş. 2. GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DANIŞMANLIK VE TİCARET A.S (focal point to act on behalf of all Project Owners) |
Submission Date | 29 Jun 2022 |
Global Stakeholder Consultation Period | 2022-11-08 - 2022-11-22 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 20,441 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility |
Country | Türkiye |
---|---|
Focal Point of Project Owners (FP)
|
GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S |
Email of Contact Person of FP (Primary) | kemal.demirkol@gte.com.tr |
Email of Contact Person of FP (Secondary) | furkan.sagiroglu@suryapi.com.tr |
Name of Authorized External Representative Organization | GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TİC A.Ş. |
Name of Focal Point of External Representative | M. Kemal Demirkol |
Email-id of External representative | kemal.demirkol@gte.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Elmalı WPP has been developed by ELMALI ENERJİ ÜRETİM A.Ş. The project aims to contribute to reducing national energy deficit and development of local industries as it allows the use of cheaper energy for industrialists and gain advantage in a competitive environment. In this scope, ELMALI ENERJİ ÜRETİM A.Ş. planned to install 3 x 3.3 MWm/3.0 MWe (total 9.0 MWe) wind turbines in Silifke district in Mersin Province, Turkey. Annual average energy generation of the power plant is stated as 31,536 MWh according to the generation license. The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emissions from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. The project will be able to deliver a reduction in emissions of around 20,441 tCO2e (tons of carbon dioxide equivalent) per annum and 204,408 tCO2e for whole crediting period. |
---|---|