Project Submission No. | S00376 |
---|---|
Project Title | Kapıdağ WPP |
Project Owner (as per PSF & LOA) | Kapıdağ Rüzgar Enerjisi Elektrik Üretim Sanayi ve Ticaret A.Ş. |
Focal Point of Project Owners*(FP)
|
NAS ENERJİ A.Ş. |
Email of Contact Person of FP (Primary) | cagdascosar@nasenerji.com.tr |
Email of Contact Person of FP (Secondary) | ofnasiroglu@fernas.com.tr |
Country | Türkiye |
Submission Date | 28 Jun 2022 |
Global Stakeholder Consultation Period | 14 Sep 2022 - 28 Sep 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | AMS-I.D. , version 18.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 31,632 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 7, 8, 9, 11 |
Forecasted SDG+ Label | Platinum |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | - |
Name of Focal Point of External Representative | - |
Email-id of Focal Point | cagdascosar@nasenerji.com.tr |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The Kapıdağ WPP is an increase capacity addition wind power plant located in Balıkesir Province of Turkey owned by Kapıdağ Rüzgar Enerjisi Elektrik Üretim Sanayi ve Ticaret A.Ş. The generation license of the project was issued by the Energy Market Regulatory Authority (EMRA) on 12/12/2006 for 49 years. The project has an installed capacity of 14.4 MWm/6.85 MWe and the annual generation is estimated to be 48,800 MWh. The purpose of the Project is to produce renewable electricity using wind as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated with fossil fired power plants. The annual emission reduction estimated by the project is 31,632 tonnes of CO2. |
---|---|
Additional Information |