PROJECT DETAILS

Project Submission No. S00376
Project Title Kapıdağ WPP
Project Owner(s) (as per PSF & LOA) Kapıdağ Rüzgar Enerjisi Elektrik Üretim Sanayi ve Ticaret A.Ş.
Submission Date 2022-06-28
Global Stakeholder Consultation Period 2022-09-14 to
2022-09-28
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Wind Power
GCC/CDM Methodology & Version AMS-I.D. , version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 31,661
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Türkiye
Focal Point of Project Owners
NAS ENERJİ A.Ş.
Email of Contact Person of FP (Primary) cagdascosar@nasenerji.com.tr
Email of Contact Person of FP (Secondary) ofnasiroglu@fernas.com.tr
Name of Authorized External Representative Organization -
Name of Focal Point of External Representative -
Email-id of External representative cagdascosar@nasenerji.com.tr
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The Kapıdağ WPP  is an increase capacity addition wind power plant located in Balıkesir Province of Turkey owned by Kapıdağ Rüzgar Enerjisi Elektrik Üretim Sanayi ve Ticaret A.Ş. The generation license of the project was issued by the Energy Market Regulatory Authority (EMRA) on 12/12/2006 for 49 years. The project has an installed capacity of 14.4 MWm/6.85 MWe and the annual generation is estimated to be 48,800 MWh.

The purpose of the Project is to produce renewable electricity using wind as the power source and to contribute to Turkey’s growing electricity demand through a sustainable and low carbon technology. The project will displace the same amount of electricity generated by the grid dominated with fossil fired power plants. The annual emission reduction estimated by the project is 31,632 tonnes of CO2. 