PROJECT DETAILS

Project Submission No. S01006
Project Title Niulanjiang Dayandong Hydropower Project
Project Owner(s) (as per PSF & LOA) Beijing Carbon X Technology Co., Ltd.
Submission Date 2022-06-28
Global Stakeholder Consultation Period 2023-07-04 to
2023-07-18
Registration Date 2024-12-03
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version ACM0002 - Grid-connected electricity generation from renewable sources - Version 21
Forecasted GHG Emission Reduction (tCO2e/Year) 166,538
Verified GHG Emission Reduction (tCO2e/Year) 166,538
Forecasted E+ Label Yes
Verified E+ Label Yes
Forecasted S+ Label Yes
Verified S+ Label Yes
Forecasted SDG+ Goals
Verified SDG+ Goals
Forecasted SDG+ Label Silver
Verified SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Verified Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 China
Focal Point of Project Owners
Beijing Carbon X Technology Co., Ltd.
Email of Contact Person of FP (Primary) daisy.li@carbon-x.cn
Email of Contact Person of FP (Secondary) melissa.meng@carbon-x.cn
Project Verifier CTI Certification Co., Ltd
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Request For Registration Documents Verified Project Submision
Verified Calculation Sheet

Other Verified Documents
Request for Registration Form Registration Form
Project Brief

The Niulanjiang Dayandong Hydropower Project (hereafter referred to as “the project”) is located in the Dayandong-Dapingzi River section in the middle reaches of the Niulan River, which is located in Huize county, Yunnan province and Weining county, Guizhou province. The construction and operation of the project activitiy are carried out by Huize County Chuanyu Hydropower Development Co., Ltd. ("Project Entity").

The purpose of the project is to utilize the water energy at the project site to generate power and the electricity generated by the Project Activity will be dispatched to the China Southern Power Grid (the “CSPG”).

The project activity is a diversion type power station with an installed capacity of 84MW. The annual average power generation is 383.12 GWh, and the annual utilization hour of installed capacity is 4561h. The expected annual average power supplied to the grid is 342.74273GWh.

After the project activity, the electricity generated by the project activity will displace part of the electricity by the CSPG which is dominated by fossil fuel power plants. Therefore, the project activity’s average annual GHG emission reductions are estimated to be  166,538 tCO2e in the 10-year crediting period.

 

VERIFICATION OUTCOME
Report (Public) Verification Report (public)
Verification report date 2024-11-20
First Request for Registration Date 2023-07-24
Opinion

CTI Certification Co., LTD (CTI) was contracted by Beijing Carbon X Technology Co., Ltd. on behalf of GCC project legal owner Huize County Chuanyu Hydropower Development Co., Ltd. for verification of the project activity “Niulanjiang Dayandong Hydropower Project” in China, Whereas as per Authorization letters by project owner dated 22/11/2022 /50/, the Project owner is “Beijing Carbon X Technology Co., Ltd., who is the focal point authorized to communicate with the GCC Verifier 

The objectives of this project verification is to validate that the GCC project meets the requirements of GCC project framework v2.1, GCC program manual v3.1, GCC program processes v4.0, GCC project standard v3.1 /2/, GCC project sustainability standard v3.1 /5/, GCC verification standard v3.1 /3/, GCC Environment & Social safeguards standard v3.0 /4/, ISO 14064-2 & ISO 14064-3, applicable approved CDM ACM0002: “Grid-connected electricity generation from renewable sources”, Version 21.0 /8/, Applicable Legal requirements/rules of host country, National Sustainable Development Criteria requirements and other GCC requirements related to aspects such as project design, applicable conditions, project boundary, baseline scenarios, additionality, emission reduction, monitoring plan, local stakeholder consultation, global stakeholder consultation, GHG emission reductions (ACCs), environmental no-net harm label (E+), social no net harm label (S+), Silver SDG label (SDG+). This report summarizes the final project verification opinion which is based on Project Submission Form Version 4.4, Dated 19/11/2024.

The Project Activity complies with all the applicable requirement of the GCC Program as per Clarification No 1., v1.3 paragraph 23-25.”

The project activity is a hydro power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring ACM0002: “Grid-connected electricity generation from renewable sources”, Version 21.0 /8/ and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard and/or other applicable GCC/GCC Decisions/Tools/Guidance/Forms.

The project activity is likely to achieve the anticipated emission reductions stated in the PSF /20/ provided the underlying assumptions do not change. The expected emission reductions (annual average) from the project activity are estimated to be 166,538 tCO2e/year over the selected Fixed 10 years crediting period starting from 01/07/2018 to 30/06/2028 /31/. The project activity is likely to achieve the anticipated emission reductions stated in the PSF provided the underlying assumptions do not change.

CTI has informed the project owners of the verification outcome through the draft verification report and final verification report. The final verification report contains the information regarding fulfilment of the requirements for verification, as appropriate.

 

CTI applied the following verification process and methodology using a competent verification team; the desk review of documents and evidences submitted by the project owner in context of the reference GCC rules and guidelines issued, undertaking/conducting site visit, interview, or interactions with the representative of the project owner, reporting audit findings with respect to clarifications and non-conformities and the closure of the findings, as appropriate and preparing a draft verification opinion based on the auditing findings and conclusions technical review of the draft verification opinion along with other documents as appropriate by an independent competent technical review team finalization of the verification opinion (this report). 

CTI Certification Co., LTD (CTI) has verified and hereby certifies that the GCC project activity “Niulanjiang Dayandong Hydropower Project”:

a. has correctly described the Project Activity in the Project Submission Form (Version 4.4, Dated 19/11/2024) including the applicability of the approved methodology ACM0002: “Grid-connected electricity generation from renewable sources”, Version 21.0 /8/ and meets the methodology applicability conditions, is additional and is expected to achieve the forecasted real, measurable and additional GHG emission reductions, complies with the monitoring methodology, has appropriately conducted local and global stakeholder consultation processes and has calculated emission reduction estimates correctly and conservatively;

b. is likely to generate GHG emission reductions amounting to the estimated 166,538 tCO2e as indicated in the PSF, which are additional to the reductions that are likely to occur in absence of the Project Activity and complies with all applicable GCC rules, including ISO 14064-2 and ISO 14064-3, and therefore requests the GCC Program to register the Project Activity;

c. is not likely to cause any net-harm to the environment and/or society and complies with the Environmental and Social Safeguards Standard, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+); and

d. is likely to contribute to the achievement of United Nations Sustainable Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+).

e. CORSIA eligibility was confirmed. The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 01, v1.3 paragraph 23-25, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore request GCC Steering Committee to append CORSIA Certification label (C+) to this project.; However, Host country Attestation on Double Counting required by CORSIA will provide during the Emission Reduction verification.

Thus the project activity is being recommended to GCC Steering Committee for request for registration.