| Project Submission No. | S00808 |
|---|---|
| Project Title | Solar Power Project in Bihar |
| Project Owner(s) (as per PSF & LOA) | Azure Power India Private Limited |
| Submission Date | 2022-06-28 |
| Global Stakeholder Consultation Period |
2023-01-10 to 2023-01-24 |
| Registration Date | 2025-03-03 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | AMS-I.D.: - Grid Connected renewable electricity generation – Version 18.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
| Verified Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Azure Power India Private Limited |
| Email of Contact Person of FP (Primary) | reenu.gaur@azurepower.com |
| Email of Contact Person of FP (Secondary) | kompella.srinivas@azurepower.com |
| Project Verifier | LGAI TECHNOLOGICAL CENTER, S.A. |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | The project activity involves the installation of Solar Power Project in Bihar State of India. The purpose of the project activity is to generate clean electricity with utilization of solar energy. The total installed capacity of the project activity is 10 MW. The solar power project is promoted by Azure Power Eris Private Limited, a subsidiary of Azure Power India Private Limited. |
|---|---|
| Additional Information | The project activity will replace anthropogenic emissions of greenhouse gases (GHG’s) estimated to be a total of 150,164 tCO2e over the total 10 years crediting period or average 15,016 tCO2e per annum, thereon displacing 161,293 MW amount of electricity over the 10 year crediting period or an average of 16,129 MWh/year amount of electricity over the fixed crediting period of 10 years from the generation-mix of power plants connected to the Indian electricity grid, which is mainly dominated by thermal/ fossil fuel-based power plant.
|
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2025-02-13 |
| First Request for Registration Date | 2024-01-09 |
| Opinion | LGAI Technological Center S.A. (Applus+ Certification) has performed a verification of the “Solar Power Project in Bihar”. The verification is performed on the basis of GCC criteria Project Verification Standard, Version 3.1 for the project activity, GCC guideline and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. |