Project Submission No. | S00810 |
---|---|
Project Title | Solar Power Project in Andhra Pradesh - 01 |
Project Owner (as per PSF & LOA) | Azure Power India Private Limited |
Focal Point of Project Owners*(FP)
|
Azure Power india private limited |
Email of Contact Person of FP (Primary) | sunil.hansu@azurepower.com |
Email of Contact Person of FP (Secondary) | kapil.kumar@azurepower.com |
Country | India |
Submission Date | 28 Jun 2022 |
Global Stakeholder Consultation Period | 10 Jan 2023 - 24 Jan 2023 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources, ver 20.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 74505 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 7,8,13 |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The proposed project activity involves the installation of Solar Power Project in Andhra Pradesh states of India. The purpose of the project activity is to generate clean electricity with utilization of solar energy. The total installed capacity of the proposed project activity is 50 MW. The solar power project is promoted by Azure Power Infrastructure Pvt. Ltd., an SPV of Azure Power India Private Limited. |
---|---|
Additional Information | The proposed project activity will replace anthropogenic emissions of greenhouse gases (GHG’s) estimated to be average 74,505 tCO2e per annum, thereon displacing average 80,071 MWh/year amount of electricity from the generation-mix of power plants connected to the Indian electricity grid, which is mainly dominated by thermal/ fossil fuel-based power plant |