Project Submission No. | S00702 |
---|---|
Project Title | KARAMAN WPP |
Project Owner (as per PSF & LOA) | -RESUMUT ENERJİ A.Ş. -GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DANIŞMANLIK VE TİC. A.Ş. |
Submission Date | 28 Jun 2022 |
Global Stakeholder Consultation Period | 11 Dec 2022 - 25 Dec 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Wind Power |
GCC/CDM Methodology & Version | ACM0002 “Consolidated methodology for grid-connected electricity generation from renewable sources”, Version - 20 |
Forecasted GHG Emission Reduction (tCO2e/Year) | 171,283 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Location Details Open Full Map
|
|
Country | Türkiye |
---|---|
Focal Point of Project Owners (FP)
|
GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DAN VE TIC A.S |
Email of Contact Person of FP (Primary) | kemal.demirkol@gte.com.tr |
Email of Contact Person of FP (Secondary) | emre.er@resumut.com.tr |
Name of Authorized External Representative Organization | GTE KARBON SÜRDÜRÜLEBİLİR ENERJİ EĞİTİM DANIŞMANLIK VE TİC. A.Ş |
Name of Focal Point of External Representative | M. Kemal Demirkol |
Email-id of External representative | kemal.demirkol@gte.com.tr |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | KARAMAN WIND POWER PLANT (KARAMAN WPP) has been developed by RESUMUT ENERJİ A.Ş.. The project aims to contribute to reducing national energy deficit and utilization of wind capacity to meet increasing electricity demand in Türkiye. By implementing the project, investors also aim to reduce dependency to the fossil fuels thereby reducing the sources of environmental pollution. In this scope, project owner will install 12x(3.6 MWm/3.6 MWe)+1x(3.6 MWm/1.8 MWe) wind turbines in Güldere Village of Merkez District in Karaman Province, Türkiye. The average annual generated energy is expected to be 180,000 MWh according to the generation license and the project will be able to deliver a reduction in emissions of around 171,283 tCO2e (tons of carbon dioxide equivalent) per annum and 1,712,283 tons of CO2 for the whole crediting period. |
---|---|
Additional Information |
Opinion | Re Carbon Gözetim Denetim ve Belgelendirme Ltd. Şti. performed the project verification of the “Karaman WPP” in “Türkiye” between 19/06/2023 and 09/12/2023. The project verification was performed on the basis of UNFCCC criteria for the Clean Development Mechanism (CDM), requirements of GCC project framework v3.0, GCC program manual v4.0, GCC program processes v4.0, GCC project standard v3.1, GCC project sustainability standard v3.1, GCC project verification standard v3.1, GCC Environment and Social safeguards standard v3.0, GCC Program definitions v3.1, ISO 14064-2 & ISO 14064-3, applicable approved CDM Methodology “ACM0002: Grid-connected electricity generation from renewable sources, version 21.0”, Host Party Criteria and CORSIA requirements. Re Carbon Gözetim Denetim ve Belgelendirme Ltd. Şti. hereby confirm that the proposed project activity “Karaman WPP” in Türkiye, applied all relevant EB-guidance as the selected baseline and monitoring methodologies and the associated methodological tools have been applied correctly. The total emission reductions from the project are estimated to be on the average of 171,283 tCO2e per annum over the selected 10 year crediting period. The emission reduction forecast was checked and it is deemed likely that the stated amount will be achieved, given that the underlying assumptions do not change. Therefore, Re Carbon Gözetim Denetim ve Belgelendirme Ltd. Şti. requests the registration of the proposed project activity as a GCC project activity. |
---|---|
Report (Public) | Verification Report (public) |
Verification report date | 2023-12-10 |
First Request for Registration Date | 2023-12-10 |