Project Submission No. | S00679 |
---|---|
Project Title | Hunshuitang 30MW Grid-connected Solar Power Generation Project |
Project Owner (as per PSF & LOA) | Carbon Road Limited |
Focal Point of Project Owners*(FP)
|
Carbon Road Limited |
Email of Contact Person of FP (Primary) | qili@carbonroad.com |
Email of Contact Person of FP (Secondary) | tiantiansteven@126.com |
Country | China |
Submission Date | 28 Jun 2022 |
Global Stakeholder Consultation Period | 6 Dec 2022 - 20 Dec 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0) |
Forecasted GHG Emission Reduction(TCO2/Year) | 29,737 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | #7, #8 |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Hunshuitang 30MW Grid-connected Solar Power Generation Project is located in Weicheng Town, Yanyuan County, Liangshan Prefecture, Sichuan Province, the People’s Republic of China. The project is a renewable energy project and is expected to supply an annual average of 41,568 MWh of zero-emission electricity to the CCPG during the fixed 10-year crediting period, which replace the power generation of those fossil fuel-fired power plants delivered to the CCPG under the baseline scenario. The project is expected to achieve greenhouse gas emission reductions of 29,737 tCO2e annually. The total emission reductions during the fixed 10-year crediting period are 297,370 tCO2e. |
---|---|