PROJECT DETAILS

Project Submission No. S00075
Project Title Elbiz Regulator and Hydroelectric Power Plant
Project Owner (as per PSF & LOA) 1. Bulut Enerji Üretim İnşaat Sanayi ve Ticaret Ltd. Şti. & 2. Desilyon Danışmanlık Ticaret A.Ş. (focal point to act on behalf of all Project Owners)
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Turkey
Submission Date 27 Dec 2021
Global Stakeholder Consultation Period 16 Jan 2022 - 30 Jan 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D.: "Grid connected renewable electricity generation" (Version 18.0)
Forecasted GHG Emission Reduction(TCO2/Year) 13,486
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG 9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization
Name of Focal Point of External Representative
Email-id of Focal Point
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Bulut Enerji Üretim İnşaat Sanayi ve Ticaret Ltd. Şti. has constructed the Elbiz Regulator and Hydroelectric Power Plant project. The aim of the project is to produce electrical energy to the Turkish national grid. The project includes 2 units which are Elbiz-I and Elbiz-II Regulator where one of them has 4.364 MWm / 3.709 MWe installed capacity. The other one has 1.936 MWm / 1.641 MWe installed capacity. The total installed capacity of the plant is 6.300 MWm / 5.350 MWe. According to the generation license, annual electricity production is expected to be 24.960 GWh for the project, and the emission reduction is estimated around 13,486 tCO2e annually. For the entire crediting period, 134,860 tonnes of CO2 are expected to be reduced.

Additional Information