PROJECT DETAILS

Project Submission No. S00866
Project Title 90 MW Bundled Solar Project in Assam
Project Owner(s) (as per PSF & LOA) 1. Azure power India Private Limited 2. Azure power forty private limited
Submission Date 2022-06-27
Global Stakeholder Consultation Period 2023-02-06 to
2023-02-20
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version AMS I.D Version 18 & ACM0002 , version 21.0
Forecasted GHG Emission Reduction (tCO2e/Year) 147,981
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 India
Focal Point of Project Owners
Azure Power india private limited
Email of Contact Person of FP (Primary) sunil.hansu@azurepower.com
Email of Contact Person of FP (Secondary) kapil.kumar@azurepower.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The purpose of this bundled project activity is to generate electricity by harnessing the solar energy by using of solar photovoltaic technology and there by feed the generated electricity to the Indian national grid.

Bundled project activity involves installation of four Solar photovoltaic power generation projects in Assam at four locations with installed capacities of 25 MW, 25 MW, 15 MW and 25 MW each with total project capacity of 90 MW. The projects are installed in Udalguri, Kamrup, Nagaon & Cachar district, Assam state in India. The Project activity has installed the Solar photovoltaic based Panels to convert the available solar radiation into the DC power and there by installed the Inverters to convert the DC power to the AC Power. 

Additional Information

The project will replace anthropogenic emissions of greenhouse gases (GHG’s) estimated to be approximately 147,981 tCO2e per year, thereon displacing estimated average of 158,951 MWh/year amount of electricity over the crediting period of 10 years from the generation-mix of power plants connected to the Indian grid. Project activity will mitigate the total GHG emission reductions of 1,479,818 tCO2e over the entire crediting period.