PROJECT DETAILS

Project Submission No. S00522
Project Title Lale-Seydioğlu Hydroelectric Power Plant Bundle
Project Owner (as per PSF & LOA) Kur Enerji Elektrik Üretim A.Ş.
Focal Point of Project Owners*(FP)
Desilyon Danışmanlık Ticaret A.Ş.
Email of Contact Person of FP (Primary) serkan.korkmaz@desilyon.com.tr
Email of Contact Person of FP (Secondary) ozlem@desilyon.com.tr
Country Turkey
Submission Date 27 Jun 2022
Global Stakeholder Consultation Period 19 Oct 2022 - 2 Nov 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation --- Version 18.0
Forecasted GHG Emission Reduction(TCO2/Year) 13,033
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals SDG 7, SDG 8, SDG9, SDG 13
Forecasted SDG+ Label Gold
Forecasted Market Eligibility CORSIA(C+)
Name of Authorized External Representative Organization Desilyon Danışmanlık Ticaret A.Ş.
Name of Focal Point of External Representative Özlem Özkapı
Email-id of Focal Point ozlem@desilyon.com.tr
Documents for Global Stakeholder Consultation Project Submision, Calculation Sheet, Other Documents
Project Brief

Kur Enerji Elektrik Üretim A.Ş. is owner of the Lale – Seydioğlu Regulator and Hydroelectric Power Plant Bundle project. The aim of the project is to produce electrical energy from wind to supply the Turkish national grid. The project includes two bundles which are Lale Regulator and HPP and Seydioğlu Regulator and HPP. There are totally 3 turbines; one turbine and two turbines, respectively for the projects. Their total capacity is 6.65 MWm / 6.5 MWe for Lale HPP and 2.34 MWm / 2.28 MWe for Seydioğlu HPP. Total installed capacity is 8.99 MWm / 8.78 MWe. For the entire crediting period, 130,330 tons of CO2 are expected to be reduced. 

Additional Information