Project Submission No. | S00078 |
---|---|
Project Title | Ebru Regulators and Hydro Power Plant |
Project Owner (as per PSF & LOA) | 1. Berke Elektrik Üretim A.Ş. & 2. Desilyon Danışmanlık Ticaret A.Ş. (focal point to act on behalf of all Project Owners) |
Focal Point of Project Owners*(FP)
|
Desilyon Danışmanlık Ticaret A.Ş. |
Email of Contact Person of FP (Primary) | serkan.korkmaz@desilyon.com.tr |
Email of Contact Person of FP (Secondary) | ozlem@desilyon.com.tr |
Country | Türkiye |
Submission Date | 21 Dec 2021 |
Global Stakeholder Consultation Period | 23 Jan 2022 - 6 Feb 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 20.0) |
Forecasted GHG Emission Reduction(TCO2/Year) | 40,318 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | SDG 7, SDG 8, SDG 9, SDG 13 |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Berke Elektrik Üretim A.Ş. has constructed the Ebru Regulators and Hydro Power Plant. The aim of the project is to produce electrical energy to the Turkish national grid. The project includes 2 units which are Ebru-1 and Ebru-2 regulators where each one has 15.780 MWm / 15.310 MWe installed capacity. The total installed capacity of the plant is 31.561 MWm / 30.621 MWe. According to the generation license, annual electricity production is expected to be 78.731 GWh for the project, and the emission reduction is estimated around 40,318 tCO2 annually. For the entire crediting period, 403,180 tCO2 are expected to be reduced. |
---|---|
Additional Information |