Project Submission No. | S00556 |
---|---|
Project Title | Parque Punta Sierra Wind Farm Project |
Project Owner (as per PSF & LOA) | Climate Bridge (Shanghai) Ltd. |
Focal Point of Project Owners*(FP)
|
Climate Bridge (Shanghai) Ltd. |
Email of Contact Person of FP (Primary) | projects@climatebridge.com |
Email of Contact Person of FP (Secondary) | huang.shanfeng@climatebridge.com |
Country | Chile |
Submission Date | 27 Jun 2022 |
Global Stakeholder Consultation Period | 27 Oct 2022 - 10 Nov 2022 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | ACM0002 version20.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 138,123 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | #7, #8 |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | Parque Punta Sierra Wind Farm Project is a wind power project with total installed capacity of 80 MW. Project is invested and operated by Pacific Hydro Punta Sierra Spa. The project locates in Chile's Region IV, 316km north of Santiago (the main energy demand centre) and 143km south of Coquimbo (a major port). The project is a renewable energy project and is expected to supply an annual average of 276,800 MWh of zero-emission electricity to SIC during the fixed 10-year crediting period, which will replace power generation of those fossil fuel-fired power plants delivered to the SIC under the baseline scenario. The project is expected to achieve a green-house gas emission reduction of 138,123 tCO2e annually. The total emission reductions during the fixed 10-year crediting period will be 1,381,230tCO2e. |
---|---|
Additional Information |