Project Submission No. | S00420 |
---|---|
Project Title | Guan County Minghui 40MWp Grid connected Photovoltaic Power Generation Project |
Project Owner (as per PSF & LOA) | Carbon Road Limited |
Submission Date | 27 Jun 2022 |
Global Stakeholder Consultation Period | 26 Sep 2022 - 10 Oct 2022 |
Registration Date | 20 Nov 2023 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 21.0); |
Forecasted GHG Emission Reduction (tCO2e/Year) | 37,343 (tCO2e/Year) |
Verified GHG Emission Reduction (tCO2e/Year) | 37,343 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Verified E+ Label | Yes |
Forecasted S+ Label | Yes |
Verified S+ Label | Yes |
Forecasted SDG+ Goals | |
Verified SDG+ Goals | |
Forecasted SDG+ Label | Silver |
Verified SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Verified Market Eligibility | CORSIA(C+) |
Location Details Open Full Map
|
|
Country | China |
---|---|
Focal Point of Project Owners (FP)
|
Carbon Road Limited |
Email of Contact Person of FP (Primary) | project@carbonroad.com |
Email of Contact Person of FP (Secondary) | haochenwang@carbonroad.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
Request for Registration Form | Registration Form |
Project Verifier | Shenzhen CTI International Certification Co., Ltd (CTI) |
Verification Report | Verification Report |
Project Brief | Guan County Minghui 40MWp Grid connected Photovoltaic Power Generation Project is a solar power project with total installed capacity of 40MWp. The project is invested and operated by Guan County Minghui Photovoltaic Power Generation Co.,Ltd. The project is located in Xinzhuang Village, Xiedian Town, Guan County, Liaocheng City, Shandong Province, the People's Republic of China. The project is a renewable energy project and is expected to supply an annual average 42,580.9 MWh of zero-emission electricity to NCPG in the 25-year project life time, which will displace power generation of those fossil fuel-fired power plants delivered to the NCPG in the baseline scenario. The project is expected to achieve GHG emission reductions of 37,343 tCO2e annually over the crediting period. The total emission reductions during the fixed 10-year crediting period reaches 373,433 tCO2e. |
---|---|
Additional Information |