PROJECT DETAILS

Project Submission No. S00073
Project Title Solar Power Project by M/s Godawari Power and Ispat Limited
Project Owner (as per PSF & LOA) M/s Godawari Power and Ispat Limited, EKI Energy Services Limited (Act as project owner)
Submission Date 17 Dec 2021
Global Stakeholder Consultation Period 16 Jan 2022 - 30 Jan 2022
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002 Grid-connected electricity generation from renewable sources - Version 20.0
Forecasted GHG Emission Reduction (tCO2e/Year) 76,026 (tCO2e/Year)
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Platinum
Forecasted Market Eligibility CORSIA(C+)
Country India
Focal Point of Project Owners (FP)
EKI Energy Services Limited
Email of Contact Person of FP (Primary) manish@enkingint.org
Email of Contact Person of FP (Secondary) naveen@enkingint.org
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The Project Activity is the installation of a new grid-connected 50 MW solar power plant/unit at a site where no renewable power plant was operating prior to the implementation of the project activity (green-field plant). The project is implemented in Chhattisgarh state of India by M/s Godawari Power and Ispat limited.


The electricity generated from Project Activity is exported to the Indian grid in India there by displacing electricity from the regional grid electricity distribution system generated by fossil fuel based power plants.


The electricity generated by the Project Activity thus replaces the equivalent amount of electricity generated by the operation of existing/ grid connected power plants (mostly fossil fuel based power plants) and by addition of new generation sources into the grid. The Project Activity thus reduces the anthropogenic emissions of greenhouse gases (GHGs) in to the atmosphere associated with the equivalent amount of electricity generation from the existing grid connected power plants (mostly fossil fuel) and by addition of new generation sources into the grid.

Additional Information

The annual estimated emission reductions for this project activity over crediting period is 76,026 tCO2e/annum.
 