IMPORTANT UPDATE: We are migrating to GCC 2.0. We have restricted new projects registration and further updates to migrated project. Please visit to GCC 2.0.

PROJECT DETAILS

Project Submission No. S00715
Project Title Elbistan-3 SPP
Project Owner(s) (as per PSF & LOA) Afşin Enerji Üretim A.Ş.
Submission Date 2022-06-26
Global Stakeholder Consultation Period 2022-12-12 to
2022-12-26
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Solar Power
GCC/CDM Methodology & Version ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0
Forecasted GHG Emission Reduction (tCO2e/Year) 24,703
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Silver
Forecasted Market Eligibility C+ - Pilot Phase
Location Details Open Full Map
Country
 Türkiye
Focal Point of Project Owners
Life Iklim ve Enerji Ltd. Sti.
Email of Contact Person of FP (Primary) ramazan.aslan@lifeenerji.com
Email of Contact Person of FP (Secondary) cansu.guleryuz@metgunenerji.com.tr
Name of Authorized External Representative Organization Life İklim ve Enerji Ltd. Şti.
Name of Focal Point of External Representative Ramazan Aslan
Email-id of External representative ramazan.aslan@lifeenerji.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

Elbistan-3 SPP consists of 20 individual Unlicensed Photovoltaic Solar Power Plants and its total install capacity is 19.98 MWe. The plant was established in the accordance with the law of Electricity Market (Law no: 6446). 20 individual facilities are located in same province Turkey, which is Kahramanmaraş. The project aim to contribute to reducing national energy deficit and development of local industries as it allows the use of cheaper energy for industrialists and gain advantage in a competitive environment.

The project activity will generate greenhouse gas (GHG) emission reductions by avoiding CO2 emission from electricity generation by fossil fuel power plants connected to Turkish National Power Grid. Total installed capacity is 19.98 MWe. The average annual generated energy is expected to be 38,074.33 MWh according to the average of actual generations realized for 3 years (2019,2020 and 2021) and the project will be able to deliver a reduction in emissions of around 24,703 tCO2e (tons of carbon dioxide equivalent) per annum. Moreover, estimated total GHG emission reduction over the crediting period is expected to be 247,030 tCO2e (tons of carbon dioxide equivalent).

© 2025 Global Carbon Council