| Project Submission No. | S00474 |
|---|---|
| Project Title | Elbistan-1 Bundled SPP |
| Project Owner(s) (as per PSF & LOA) | Afşin Enerji Üretim A.Ş. |
| Submission Date | 2022-06-26 |
| Global Stakeholder Consultation Period |
2022-10-05 to 2022-10-19 |
| Registration Date | 2026-10-20 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | AMS-I.D : Grid connected renewable electricity generation---Version 18.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
| Verified Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
Türkiye
|
|---|---|
|
Focal Point of Project Owners
|
Life Iklim ve Enerji Ltd. Sti. |
| Email of Contact Person of FP (Primary) | ramazan.aslan@lifeenerji.com |
| Email of Contact Person of FP (Secondary) | kerem.aslan@life-climate.com |
| Name of Authorized External Representative Organization | Life İklim ve Enerji Ltd. Şti. |
| Name of Focal Point of External Representative | Ramazan Aslan |
| Email-id of External representative | ramazan.aslan@lifeenerji.com |
| Project Verifier | Verico SCE |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | Elbistan-1 Bundled SPP consists of 11 individual Unlicensed (In Türkiye, electricity generation from renewable energy sources is divided into two; licensed and unlicensed generation. Unlicensed electricity generation plants must have equal or less than 1 MW installed capacity. For further information, please refer to the link provided in reference 13) Photovoltaic Solar Power Plants (hereby referred as SPP) and its total install capacity is 10.989 MW. All the individual plants were established in accordance with the Electricity Market Law dated 14.03.2013 in the Official Gazette No. 28603 of EMRA (Electricity Market Regulatory Authority). The electricity produced by project activity will result in average emission reduction of 14,059 tons of CO2e per annum for fixed ten-year crediting period. 11 individual facilities are located in Elbistan, Türkiye. The project aims to contribute to reducing the national energy deficit and development of local industries as it allows the use of cheaper energy for industrialists and gain an advantage in a competitive environment. |
|---|
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2026-09-10 |
| First Request for Registration Date | 2023-10-04 |
| Opinion | Verico SCE has undertaken the project verification of the proposed upstream emission reduction project « Elbistan-1 Bundled SPP » in Türkiye to be implemented by Project Owner “AFŞİN ENERJİ ÜRETİM ANONİM ŞİRKETİ” based on the requirements defined by GCC program for the project activity, and other rules applicable to the project verification including the host country’s legislation and its specific requirements for sustainable development. The purpose of the project is to build a solar PV project which results in reductions of GHG emissions of 140,589 tCO2e during the fixed 10 year crediting period to replace the electricity generated by fossil fuel dominated power grid in the host country. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring AMS-I. D Small-Scale Methodology: Grid-connected renewable electricity generation, Ver. 18.0 and is assessed against latest valid Project Standard, Verification Standard and Environment and Social Safeguards Standard and/or other applicable GCC/CDM Decisions/Tools/Guidance. To arrive at the final project verification conclusions and opinion, verico SCE carried out desk reviews, background investigations and a remote audit, taking into account the sustainable development related regulations/laws in the host country and specific GCC rules/requirements as well as applicable CDM standards, in particular the approved methodology AMS-I. D Small-Scale Methodology: Grid-connected renewable electricity generation, Ver. 18.0. Through the project verification process, the project verification team identified five (5) corrective action requests, and an additional Corrective Action Request (CAR#06) raised during the GCC registration review process. The Project Owner has taken actions to address the findings and submitted to verico SCE several sets of project document revisions resulting in a final Project Submission Form (version 05, dated 13/08/2026) substantiated by supporting evidence. All findings have been appropriately closed before the issuance of this project verification statement. The verification team is of the opinion that the GCC project: « Elbistan-1 Bundled SPP » with the verified final version (version 05, dated 13/08/2026) of Project Submission Form:
Therefore, verico SCE hereby certifies that the Project Submission Form version 04, dated 17/04/2025 of the proposed GCC project « Elbistan-1 Bundled SPP » is in accordance with the above stated requirements. |