Project Submission No. | S00812 |
---|---|
Project Title | Heze Sanrui 20MW Grid connected Photovoltaic Power Generation Project |
Project Owner (as per PSF & LOA) | Carbon Road Limited |
Submission Date | 25 Jun 2022 |
Global Stakeholder Consultation Period | 10 Jan 2023 - 24 Jan 2023 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
Project Type | Solar Power |
GCC/CDM Methodology & Version | GCCM001 Methodology for Renewable Energy Generation Projects Supplying Electricity to Grid or Captive Consumers (Version 3.0) |
Forecasted GHG Emission Reduction (tCO2e/Year) | 19,199 (tCO2e/Year) |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
Forecasted SDG+ Goals | |
Forecasted SDG+ Label | Silver |
Forecasted Market Eligibility | CORSIA(C+) |
Location Details Open Full Map
|
|
Country | China |
---|---|
Focal Point of Project Owners (FP)
|
Carbon Road Limited |
Email of Contact Person of FP (Primary) | project@carbonroad.com |
Email of Contact Person of FP (Secondary) | haochenwang@carbonroad.com |
Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
Project Brief | Heze Sanrui 20MW Grid connected Photovoltaic Power Generation Project (hereafter referred to as “the project”) involves the installation of 20 MW Solar Power Plant in Shatu town, Mudan district, Heze city, Shandong province, the People’s Republic of China. The aim of the project is to generate electricity from renewable source of energy (solar) and leads to reduction in GHG emissions. The energy generated is being supplied to the North China Power Grid (NCPG). The project is invested and operated by Heze Sanrui Electric Power Co., Ltd. The central geographic coordinates of the project are 115.7711° E, 35.3128° N. The project is in operation since 20/07/2017. The project is expected to supply an average of 22,692MWh of electricity to NCPG annually over the fixed crediting period of 10 years. The project is estimated to achieve 191,990 tCO2e GHG emission reductions during the whole crediting period The emission reductions (annual average) from the project activity are estimated to be 19,199 tCO2e per year over the crediting period. |
---|---|
Additional Information |