Project Submission No. | S00845 |
---|---|
Project Title | 4 MW Mula (RBC) Hydro Electric Project |
Project Owner (as per PSF & LOA) | Kamdar Infrastructure Private Limited/MITCON Consultancy & Engineering Services Limited |
Focal Point of Project Owners*(FP)
|
MITCON Consultancy & Engineering Services Limited |
Email of Contact Person of FP (Primary) | dhawal.marghade@mitconindia.com |
Email of Contact Person of FP (Secondary) | akash.more@mitconindia.com |
Country | India |
Submission Date | 24 Jun 2022 |
Global Stakeholder Consultation Period | 24 Jan 2023 - 7 Feb 2023 |
Sector | 1.Energy industries (renewable-/non-renewable sources) |
GCC/CDM Methodology & Version | AMS-I.D.: Grid connected renewable electricity generation – Version 18.0 |
Forecasted GHG Emission Reduction(TCO2/Year) | 9,504 |
Forecasted E+ Label | Yes |
Forecasted S+ Label | Yes |
---|---|
Forecasted SDG+ Goals | 5,7,8,13 |
Forecasted SDG+ Label | Gold |
Forecasted Market Eligibility | CORSIA(C+) |
Name of Authorized External Representative Organization | |
Name of Focal Point of External Representative | |
Email-id of Focal Point | |
Documents for Global Stakeholder Consultation | Project Submision, Calculation Sheet, Other Documents |
Project Brief | The project activity involves power generation from a 4 MW hydroelectric project based at the outlets of Right Bank Canal (RBC) of Mula dam located in Maharashtra State. The purpose of the project activity is to produce renewable energy using hydro power and supplying electricity to the Maharashtra State Electricity Distribution Company Limited (MSEDCL).The project activity will consist of 2 Numbers of S-Type Tubular Turbines each with a generator output capacity of 2000 kW for generation of electricity. The average annual generated electricity is expected to be 10,512 MWh and avoid emission of 95,040 tCO2 for 10 year period. |
---|---|
Additional Information |