PROJECT DETAILS

Project Submission No. S00845
Project Title 4 MW Mula (RBC) Hydro Electric Project
Project Owner(s) (as per PSF & LOA) Kamdar Infrastructure Private Limited/MITCON Consultancy & Engineering Services Limited
Submission Date 2022-06-24
Global Stakeholder Consultation Period 2023-01-24 to
2023-02-07
Sector 1.Energy industries (renewable-/non-renewable sources)
Project Type Hydro Power
GCC/CDM Methodology & Version AMS-I.D.: Grid connected renewable electricity generation – Version 18.0
Forecasted GHG Emission Reduction (tCO2e/Year) 9,504
Forecasted E+ Label Yes
Forecasted S+ Label Yes
Forecasted SDG+ Goals
Forecasted SDG+ Label Gold
Forecasted Market Eligibility C+ - Pilot Phase
Country
 India
Focal Point of Project Owners
MITCON Consultancy & Engineering Services Limited
Email of Contact Person of FP (Primary) dhawal.marghade@mitconindia.com
Email of Contact Person of FP (Secondary) akash.more@mitconindia.com
Documents for Global Stakeholder Consultation Project Submision
Calculation Sheet

Other Documents
Project Brief

The project activity involves power generation from a 4 MW hydroelectric project based at the outlets of Right Bank Canal (RBC) of Mula dam located in Maharashtra State. The purpose of the project activity is to produce renewable energy using hydro power and supplying electricity to the Maharashtra State Electricity Distribution Company Limited (MSEDCL).The project activity will consist of 2 Numbers of S-Type Tubular Turbines each with a generator output capacity of 2000 kW for generation of electricity. The average annual generated electricity is expected to be 10,512 MWh and avoid emission of 95,040 tCO2 for 10 year period.