Project Brief |
Cine Biomass Power Plant Project has 14.20 MWm/13.6 MWe installed capacity, and the project is expected to produce 102,000 MWh of gross electricity annually. The voltage is stepped up to 154/34.4 kV, and the power is fed to the grid through the Cine OSB DM-2 (Substation) of the Turkish Electricity Transmission Company (TEİAŞ). It is foreseen that approximately 100,000 tons of agricultural and forestry waste will be incinerated annually. The construction of the power plant was started in July 2019 with the Construction Agreement signed with the contractor company, and the plant started generating electricity on 21/12/2020. The plant is currently fully operational. The plant is located in Cine Organized Industrial Zone in Gökyaka Neighborhood at Cine District, to the southeast of the province of Aydın. As per the license issued by Energy Market Regulatory Authority (EMRA) all legal rights of the project is given to Biyomek Elektrik Enerjisi Üretim ve Sanayi Ticaret A.Ş. An estimated electricity gross generation of 102,000 MWh by the efficient utilization of the available biomass by project activity will replace the grid electricity, which is constituted of different fuel sources, mainly fossil fuels. Finally, the electricity produced by project activity will result in a total emission reduction of 48,573 tonnes of CO2e/year and 485,730 tonnes of CO2 for the whole crediting period. |