| Project Submission No. | S00486 |
|---|---|
| Project Title | 50MW Wind Power Project in Rojmal Gujarat |
| Project Owner(s) (as per PSF & LOA) | Tata Power Renewable Energy Limited |
| Submission Date | 2022-06-24 |
| Global Stakeholder Consultation Period |
2022-10-06 to 2022-10-20 |
| Registration Date | 2024-04-10 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Wind Power |
| GCC/CDM Methodology & Version | ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0 |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
| Verified Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
India
|
|---|---|
|
Focal Point of Project Owners
|
Tata Power Renewable Energy Limited |
| Email of Contact Person of FP (Primary) | sivanarayana@tatapower.com |
| Email of Contact Person of FP (Secondary) | prashant.tiwari@tatapower.com |
| Project Verifier | LGAI TECHNOLOGICAL CENTER, S.A. |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | Project activity involves installation of wind power generation project in Bhavnagar district of Gujarat with installed capacities of 50 MW. The Project activity has installed the Wind Turbine Generators (WTGs) to convert the available wind energy into the electric power. The project is implemented by Tata Power Renewable Energy Limited. The project is commissioned and is currently in operation.The generated power from the project activity is supplied to the third-party consumers (Gujarat Urja Vikas Nigam Limited- GUVNL) through the wheeling agreement with the DISCOM. Project Owners have signed a Power Purchase agreement with the consumer organizations to supply the generated wind power at contracted unit of price. |
|---|---|
| Additional Information | The project replaces anthropogenic emissions of greenhouse gases (GHG’s) estimated to be |
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2024-03-29 |
| First Request for Registration Date | 2023-05-10 |
| Opinion | Applus+ Certification was contracted by Tata Power Renewable Energy Limited for verification of the project activity “50 MW Wind power project in Rojmal Gujarat” in India. The verification was performed in accordance with the GCC Project standard, GCC program manual and host country criteria, as well as criteria given to provide for consistent project operations, monitoring and reporting. The review of the project submission form and the subsequent follow-up interviews have provided us with sufficient evidence to determine the fulfilment of the stated criteria. In our opinion, the project meets all relevant GCC criteria and all relevant host country criteria. The project correctly applies methodology ACM0002 version 20.0. The Project activity is not likely to cause any net-harm to the environment and/or society and complies with the environmental and Social Safeguard Standard, and therefore requests the GCC Steering Committee to register the Project Activity, which is likely to achieve the requirements of the Environmental No-net-harm Label (E+) and the Social No-net-harm Label (S+). The Project activity is likely to contribute to the achievement of United Nations Sustainability Development Goals (SDGs), comply with the Project Sustainability Standard, and contribute to achieving a total of 3 SDGs, which is likely to achieve the Silver SDG certification label (SDG+). The Project Activity complies with all the applicable requirement of the GCC Program and ICAO’s requirements on CORSIA Emissions Unit Eligibility Criteria and CORSIA Eligible Emissions Units, as per Clarification No 1., v1.1 paragraph 21-23, and the ACCs expected to be issued during the crediting period is likely to be CORSIA eligible and can be used by International Airlines for offsetting their emissions during all phases of CORSIA and therefore requests GCC Steering Committee to append CORSIA Certification label (C+) to this project. By generating renewable energy from solar energy resources, the project results in reduction of CO2 emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario. Emission reductions attributable to the project are hence additional to any that would occur in the absence of the project activity. The total emission reductions from the project are estimated to be 957,760 tCO2e over a fixed 10 year crediting period, averaging 95,776 tCO2e annually. The emission reduction forecast has been checked and it is deemed likely that the stated amount is achieved given the underlying assumptions do not change. The monitoring plan provides for the monitoring of the project’s emission reductions. The monitoring arrangements described in the monitoring plan are feasible within the project design and it is confirmed that the project owners can implement the monitoring plan. In conclusion, Applus+ Certification is of the opinion that the project activity “50 MW Wind power project in Rojmal Gujarat” in India, as described in the PSF Version 10, dated 22/03/2024, meets all relevant GCC requirements and all relevant host party criteria and correctly applies the baseline and monitoring methodology “ACM0002 Grid-connected electricity generation from renewable sources, Version 20.0". The project will hence be recommended by Applus+ Certification for registration with the GCC. |