| Project Submission No. | S00607 |
|---|---|
| Project Title | Baotou Hongnijing 40MW Solar Power Project |
| Project Owner(s) (as per PSF & LOA) | China Onecarbon Co., Ltd |
| Submission Date | 2022-06-24 |
| Global Stakeholder Consultation Period |
2022-11-20 to 2022-12-04 |
| Registration Date | 2026-06-15 |
| Sector | 1.Energy industries (renewable-/non-renewable sources) |
| Project Type | Solar Power |
| GCC/CDM Methodology & Version | ACM0002: “Grid-connected electricity generation from renewable sources” (Version 21.0) |
| Forecasted GHG Emission Reduction (tCO2e/Year) |
|
| Verified GHG Emission Reduction (tCO2e/Year) |
|
| Forecasted E+ Label | Yes |
| Verified E+ Label | Yes |
| Forecasted S+ Label | Yes |
| Verified S+ Label | Yes |
| Forecasted SDG+ Goals |
|
| Verified SDG+ Goals |
|
| Forecasted SDG+ Label | Silver |
| Verified SDG+ Label | Silver |
| Forecasted Market Eligibility | C+ - Pilot Phase |
| Verified Market Eligibility | C+ - Pilot Phase |
|
Location Details
Open Full Map
|
|
| Country |
China
|
|---|---|
|
Focal Point of Project Owners
|
China Onecarbon Co., Ltd |
| Email of Contact Person of FP (Primary) | 437213329@qq.com |
| Email of Contact Person of FP (Secondary) | fengsihan@live.cn |
| Project Verifier | Carbon Check (India) Private Limited |
| Documents for Global Stakeholder Consultation | Project Submision
Calculation Sheet Other Documents |
| Request For Registration Documents | Verified Project Submision
Verified Calculation Sheet Other Verified Documents |
| Request for Registration Form | Registration Form |
| Project Brief | Baotou Hongnijing 40MW Solar Power Project(hereafter referred to as “the project”) is a solar PV power project with total installed capacity of 40MW(AC),the project is invested and operated by Baotou Power Generation Branch of Inner Mongolia Energy Power Generation Investment Group Co.,Ltd.The project is locates in Sifenzi Village, Wufenzi Village Committee, Xingshunxi Town, Guyang County, Baotou City, Inner Mongolia Autonomous Region, in China.The commissioning date is 13/06/2017. |
|---|
| Report (Public) | Verification Report (public) |
|---|---|
| Verification report date | 2026-01-06 |
| First Request for Registration Date | 2023-11-17 |
| Opinion | Carbon Check was contracted by China Onecarbon Co., Ltd for project verification of the project activity “Baotou Hongnijing 40MW Solar Power Project” on 15/05/2023. The project verification was performed based on rules and requirements defined by GCC for the project activity. The project activity is a solar power project, which results in reductions of CO2e emissions that are real, measurable and give long-term benefits to the mitigation of climate change. It is demonstrated that the project is not a likely baseline scenario and the emission reductions attributable to the project are, hence, additional to any that would occur in the absence of the project activity. The project correctly applies the approved baseline and monitoring ACM0002 “Grid-connected electricity generation from renewable sources”, Version 21.0 and is assessed against latest valid PS, VS and Environment and Social Safeguards Standard V3.0, Project-Sustainability-Standard V3.1 and/or other applicable GCC/CDM Decisions/Tools/Guidance/Forms. c) is not likely to cause any net-harm to the environment and/or society and complies with the environment and Social Safeguards Standard v3.0, and therefore requests the GCC Program to register the Project Activity, which is likely to achieve the requirements of the Environment Nonet-harm Label (E+) and the Social No-net-harm Label (S+); and |